My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2022 11:10:10 AM
Creation date
2/28/2022 10:44:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY 76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST Program:Monitoring Plan for UST Tank...:CERS Business 6111 9 50 Ann <br /> 1RECEIVED VIA EMAIL: <br /> 6/1/2022 <br /> California Environmental Reporting System:Business Para ar'yot Gill's Arrourd Sign out Tools R�rts ficlp <br /> rf.mt S•L'Llf�:}I` i G15 � h111A� r•}]�J71LGo. <br /> US;-f AllunitrAng Man. TP—AC 17',; <br /> UST Tank q TAOSM269 <br /> A UST monitoring plan must be completed for each tank/UST System entered into CERS This form must be updated within 30 days of changes in the information it <br /> contains.Please note that your kxal agency may require you to obtain approval pnor to installing or modifying monitoring equipment. <br /> Select Edit to modify this monitoring plan <br /> UST monitonng plans must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed Provide this document using <br /> the UST Monitoring Site Plan supplemental documentation found elsewhere in the UST submittal element, <br /> –,Submittal Element History <br /> Submitted for CERS ID 10456027 on 5131/2022 406PII111 by Paramjyo ill of JIVTESH QILLTO A <br /> 111 M[wrEndfe sub"tNl Start rtp-w 5ubri rail <br /> 64 <br /> Yrew IisR <br /> This section would allow the user to copy Monitoring Plan information from another tank Thrs option would only appear it this facility had one at more existing <br /> tanks with Monitoring Plans <br /> f t 3eatfrtgbnAP'rorefftive-Mtai Ill lot nq L <br /> TRACY76 Monitoring Equipment SrrrSite Plot Plan Submitted <br /> Tracy0WGrant, CA 95377 Line Annually Site Plan Previously Submitted <br /> ark Mori itc r-,n g i -Perfotmed Using the Maithodts, <br /> yB5 Continuous Electronic Tank Monitoring <br /> Secondary Containment System Monitor Panel Manufacturer Leak Sensor Manufacturer <br /> Dry VEEDER ROOT VEEDER ROOT <br /> Monitor Panel Model Leek Sensor Model rF <br /> EMC 420 <br /> No Automatic Tank Gauging-• <br /> No Monthly Statistical Inventory ReconcifiMlon <br /> No Weekly Manual Tank Gauge No Tank integrity Testing <br /> No Other Monitoring-- <br /> MorritortrtgisPerfor,ledUsingtherf towirrctlethodfsl <br /> yes Continuous Monitoring of Piping Secondary Containment M <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry VEEDER ROOT VEEDER ROOT <br /> Panel Model Y Leak Sensor Model <br /> EMC 205 <br /> Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes <br /> Fail ure/Dlsconnect Triggers Pump Shutdown <br /> Yes <br /> YB5 Mechanical Line Leak Detector performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> VMI 91 LD 2000 <br /> No Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> https:llcersbusiness2_caMepa.ca.gov150215/Faciiitvil0456027ISubmittal/UST/5594212IMonitoringPL-mtDetailt25439101 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.