Laserfiche WebLink
SAN JOAQUIN COMMUNITY DEVELOPMENT DEPARTMENT <br /> -COUNTY SITE APPROVAL <br /> G1 otn gr r fi FILE NUM '220 0 0 2 4 <br /> B`` <br /> Owner Information Applicant Information <br /> Name:Jesus E Meza Name:Ridgeline Engineering -Jordan Baldwin <br /> Mailing Address:PO Box 980 Lockeford, CA 95237 Mailing Address:2769 Boeing Way <br /> Stockton, CA 95206 <br /> Phone:209-329-1412 Phone:209.955.0110 <br /> Email:Jmezatrucking3@gmail.com Email:robby@rle.us <br /> Applicant's Representative Information Design Professional Information <br /> Name: Name:Ridgeline Engineering-Jordan Baldwin <br /> Mailing Address: Mailing Address:2769 Boeing Way <br /> Stockton, CA 95206 <br /> Phone: Phone:209.955.0110 <br /> Email: Email:robby@rle.us <br /> Project Description <br /> (Attach additional sheets as necessary) <br /> Public sales of retail landscaping services and materials for outdoor projects.The property consists of an existing house and shop building. <br /> The rear(west)of the property will be used for the landscape material sales.There will be concrete blocks for divider spaces of different <br /> landscape materials.The site plan shows locations for the semi tractor trailer parking as well as driver parking area. <br /> The plans are to provide an office building to fulfill the needs and demand of the employees and public use. <br /> The house is a part of this property and will remain as a residential rental property. Public vehicles and trucks will enter and exit the <br /> property on Highway 88.Adequate parking and turnaround for trucks and public will be provided. <br /> Materials will include sand,gravel,bark,decorative rock,etc.Customers can have a pick up loaded by owner or have material delivered by owner. <br /> The property utilities consist of existing well water,septic tank system and PGE electric and no county storm drain. <br /> A new retention pond for containing storm water will be constructed on-site(location shown on site plan). <br /> The area of drive lanes, material storage and parking will be gravel or compacted base rock. <br /> Will the project include more than one(1)phase? (maximum oft phases)Yes ❑ No * <br /> Length of time (maximum of 5 years): <br /> Note:For questions regarding phasing, contact the Planning Division at 209-468-3121. <br /> Property Information <br /> Assessor Parcel Number Property Address Property Williamson Act Contract(Y or N) <br /> Size <br /> 051-310-29 18303 N Highway 88 Lockeford CA 2.97 <br /> Page 1 of 6 <br /> Updated 08/28/2020 <br />