Laserfiche WebLink
A.GENERAL NOTES1.DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARYCONDITIONS AND ALL OTHER SPECIFICATION SECTIONS, APPLY TO ALL SECTIONS OF DIVISION 15000.2.THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS ANDREVIEW THE DRAWINGS FOR ALL DIVISIONS OF WORK PRIOR TO BEGINNING WORK AND IS RESPONSIBLEFOR THE COORDINATION OF HIS/HER WORK AND THE WORK OF HIS/HER SUBCONTRACTORS WITH ALLDIVISIONS OF WORK TO AVOID INTERFERENCE AND CONFLICTS. IT IS THIS CONTRACTOR'SRESPONSIBILITY TO PROVIDE HIS/HER SUBCONTRACTORS WITH COMPLETE SETS OF BID DOCUMENTS.3.THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF HIS/HERWORK AND THE WORK OF HIS/HER SUBCONTRACTORS TO COMPLY WITH THE SCHEDULE.4.THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONSAFFECTING THE WORK. ANY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR ANYPROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTORS BID.SUBMITTAL OF A BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANYMODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONSSHALL BE INCLUDED. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF HIS/HERRESPONSIBILITY IN PERFORMANCE OF WORKB.GENERAL REQUIREMENTS:1.THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS,TRANSPORTATION, AND FACILITIES NECESSARY TO PROVIDE A COMPLETE HVAC, PLUMBING, FIREPROTECTION SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS AND ASREQUIRED BY JOB CONDITIONS. ALL WORK NECESSARY AND NOT SPECIFICALLY NOTED TO BEPROVIDED BY OTHERS SHALL BE PROVIDED BY THIS CONTRACTOR.2.ALL WORK SHALL BE PERFORMED IN A NEAT, PROFESSIONAL MANNER USING GOOD CONSTRUCTIONPRACTICES.3.UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS AND EQUIPMENT, INCLUDING ALLCOMPONENTS THEREOF, SHALL BE NEW, TESTED, LISTED AND SIZED IN CONFORMITY WITHREQUIREMENTS OF STATE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT.4.ALL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING,MAINTAINING AND REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENTSERVICE ACCESS TO ALL EQUIPMENT.5.FIELD MEASURE AND VERIFY REQUIREMENTS FOR EXACT DIMENSION'S. OFFSETS AND ADDITIONALELBOWS REQUIRED TO SUIT SITE CONDITIONS ARE CONSIDERED PART OF THE SCOPE.C.CODES1.ALL WORK SHALL COMPLY WITH 2016 CALIFORNIA PLUMBING CODE ORDINANCES AND OTHER STATE,COUNTY, CITY AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFPA CODES,ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THIS CONTRACTOR SHALLINQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THISCONTRACTOR SHALL INCLUDE IN THE BID ANY CHANGES REQUIRED BY CODES AND IF THESE CHANGESARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTERCONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED TO THECONTRACTOR.D.LICENSES, PERMITS AND INSPECTION FEES1.THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS AND FEESREQUIRED OR RELATED TO DIVISION 15000 WORK.2.FURNISH TO THE (OWNER) ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL ATCOMPLETION OF PROJECT.E.GUARANTEE1.THIS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER HIS/HERCONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS/HER OWN EXPENSE, ANY DEFECTIVEWORK, MATERIAL OR EQUIPMENT DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OFACCEPTANCE (IN WRITING) OF THE INSTALLATION. EXTENDED WARRANTIES ARE AS SPECIFIED WITHINDIVIDUAL EQUIPMENT.2.THE HOT WATER HEATERS SHALL BE FURNISHED WITH A 5 YEAR HEAT EXCHANGER WARRANTY.F.PHASING REQUIREMENTS (IF APPLICABLE)1.THIS CONTRACTOR SHALL INCLUDE IN THE BID ALL NECESSARY SERVICE REQUIRED TO KEEP THEOPERATING PORTION OF THE BUILDING'S (HVAC, PLUMBING AND SPRINKLER) SERVICES IN OPERATION.CONTRACTOR MUST SCHEDULE IN WRITING ONE WEEK PRIOR TO ANY SHUT DOWN OF (THE HVAC,PLUMBING OR FIRE PROTECTION) SYSTEMS2.THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTINGWORK AND THE RENOVATION WORK. COORDINATE WITH THE OTHER CONTRACTORS ANY EXISTINGEQUIPMENT REQUIRED TO BE LEFT INTACT. THIS CONTRACTOR SHALL INCLUDE AND WILL BE HELDRESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING (FIRE PROTECTION SYSTEMS, PLUMBING FIXTURES,PIPING SYSTEMS, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS). AND ASSOCIATED ROOFCURBS OR RAILS NOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE.CONTRACTOR SHALL VERIFY ALL PRESUMED ABANDONED (EQUIPMENT, PIPES, DUCTWORK ANDEQUIPMENT) PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED. ALLEXTRANEOUS ITEMS IN THE SPACE, ASSOCIATED WITH THE SPACE, OR ON THE ROOF NOT APPLICABLETO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCHEXISTING SURROUNDINGS. EXISTING ABANDONED (PIPES, DUCTS OR EQUIPMENT) IN THE FLOOR,EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW ORWITHIN THE FLOOR OR WALL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BYCODES, ABANDONED (PIPING AND/OR DUCTWORK) MUST BE REMOVED TO POINT OF ORIGIN. CONFIRMTHE EXTENT OF DEMOLITION PRIOR TO BID AND INCLUDE IN BID PROPOSAL.G.SLEEVE1.THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THEINSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH ITS RESPECTIVE FLOOR, WALL OR PARTITIONAND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICHSHALL EXTEND 2" ABOVE THE FLOOR.2.CONTRACTOR SHALL COORDINATE ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRYFLOORS OR WALLS.3.ALL SLEEVES AND OPENINGS THROUGH FIRE-RATED WALLS AND/OR FLOORS SHALL BE FIRE SEALEDWITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAINTHEIR FIRE RATING.SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BESTANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRYPARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALLBE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM.H.HANGERS1.PROVIDE HANGERS AND SUPPORTS FOR ALL PIPING, DUCTWORK, AND EQUIPMENT IN ACCORDANCEWITH SMACNA, MSS, ASME, AND ASHRAE STANDARDS.2.HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C-CLAMPS WITHRETAINING CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK.3.HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE OR MASONRY. HANGING FROM METALDECK IS NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORDS OF BAR JOISTS. WHEREINTERFERENCES OCCUR, AND IN ORDER TO SUPPORT (DUCTWORK OR PIPING) THE CONTRACTOR SHALLINSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOTINTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT.4.HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OFINSULATION. INSTALL 6" LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THEPIPE INSULATION. PROVIDE HIGH DENSITY INSULATION INSERT BETWEEN THE SADDLE AND THE PIPE.5.HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED.I.DIRT AND DUST CONTROL1.SCREEN OFF ALL AREAS WHERE CONSTRUCTION IS TO TAKE PLACE FROM THE AREAS TO REMAININHABITED. INHABITED AREAS SHALL REMAIN DUST AND DEBRIS FREE DURING CONSTRUCTION.2.CLEAN ANY AREAS OUTSIDE DESIGNATED CONSTRUCTION AREA WHICH MAY HAVE BECOME SOILED DUETO CONSTRUCTION.J.EQUIPMENT, PIPING AND INSTALLATION1.REFER TO PLANS FOR SCHEDULES OF EQUIPMENT AND FIXTURES. AMERICAN STANDARD, KOHLER ANDCRANE ARE CONSIDERED ACCEPTABLE AS EQUALS.2.MAINTAIN A MINIMUM CLEARANCE OF 6" BETWEEN PLUMBING PIPING AND EQUIPMENT AND ALLFIRE/SMOKE RATED WALLS.3.INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. INSTALL UNITSLEVEL AND PLUMB, FIRMLY ANCHORED IN LOCATIONS INDICATED.4.POTABLE WATER PIPING SHALL BE AS FOLLOWS:a.BELOW GRADE: TYPE 'K', ANNEALED TYPE TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES ANDSMALLER. BRAZE ALL JOINTS.b.ALL OTHER: TYPE 'L' DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95-5TIN-ANTIMONY SOLDER.5.PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED.6.FIELD VERIFY EXACT CONNECTION POINTS PRIOR TO SUBMITTING BID AND NOTIFY ENGINEER IFCONDITIONS ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN THE SPECIFICATIONS. CONTRACTORSHALL VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE-IN AS FOLLOWS:c.SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE.d.TEST WATER PRESSURE TO INSURE MINIMUM PSI MATCHES MOST DEMANDING EQUIPMENTSUPPLIED.7.INSULATE ALL HOT AND COLD WATER PIPING WITH 1" THICK (K=0.23 @ 75°F) FIBERGLASS PIPEINSULATION WITH AN ALL SERVICE JACKET TO MEET LOCAL CODES AND UL FLAME SPREAD AND SMOKEDEVELOPED RATING. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.8.INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORIES WITH TRUEBRO MODEL 102W"HANDI LAV GUARD" INSULATION KIT OR EQUAL.9.INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPINGAND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPANOF 5 FEET.10.FLUSH STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES.11.TEST ENTIRE PLUMBING SYSTEM IN ACCORDANCE WITH 2016 CALIFORNIA PLUMBING CODE.12.PROVIDE WATER METER AND REMOTE READER PER LOCAL UTILITIES REQUIREMENT, IF APPLICABLE.13.CONDENSATE DRAIN: PROVIDE POLYVINYL CHLORINE (PVC) SCHEDULE 40 PLASTIC PIPE (TYPE (DWV) INCONFORMANCE WITH STANDARD ASTM D2665.14.VALVES: PROVIDE BALL VALVE NIBCO SERIES 585-70 FOR SHUT-OFF15.PROVIDE ACCESS PANELS WHERE REQUIRED FOR OPERATION, MAINTENANCE AND BALANCING ORPLUMBING EQUIPMENT.16.PROVIDE WATER HAMMER ARRESTORS AT EACH BRANCH LINE.H.GAS PIPING1.FURNISH AND INSTALL A COMPLETE GAS PIPING SYSTEM.2.GAS LINES SHALL BE BLACK STEEL, SCHEDULE 40, ASTM A-53, WITH MALLEABLE THREADED FITTINGSFOR 2" AND SMALLER, AND WITH WELDED JOINTS FOR 2-1/2" AND LARGER.3.FURNISH AND INSTALL A GAS COCK, DIRT LEG, AND UNION CONNECTION AT EACH PIECE OF EQUIPMENT.4.PITCH PIPING AT A UNIFORM GRADE OF 1/4" IN 15 FEET UPWARD IN DIRECTION OF FLOW. SUPPORTPIPING EVERY 5 FEET, AS DETAILED ON DRAWINGS, OR BY STANDARD INDUSTRY PRACTICE, WHICHEVERIS MORE STRINGENT.5.GAS PIPING EXPOSED ON ROOF SHALL BE PAINTED WITH RUST-INHIBITING PAINT.6.GAS PIPING INSTALLED IN RETURN AIR PLENUMS SHALL BE SLEEVED AND VENTED OR WELDED INACCORDANCE WITH THE LOCAL GAS COMPANY, LOCAL CODE AND APPLICABLE NFPA 54 CODES.7.TESTING AND PURGING OF GAS PIPING SHALL BE DONE PER THE REQUIREMENTS OF THE LOCAL GASCOMPANY, LOCAL CODES AND APPLICABLE NFPA CODES.8.CONTACT AND COORDINATE GAS SERVICE, METER AND REGULATOR REQUIREMENTS WITH THE LOCALGAS COMPANY PRIOR TO BID. INCLUDE INSTALLATION COST OF GAS METER AND REGULATOR IN BID.I.LABELS/PIPE MARKERS1.FURNISH AND INSTALL PIPE IDENTIFICATION MARKERS EVERY 5 FEET ON ALL PIPES INSTALLED UNDERTHIS CONTRACT. MARKERS SHALL BE A MINIMUM OF 1-1/2" X 8" AND IDENTIFIED IN ACCORDANCE WITHTHE BACKGROUND AND LETTER COLORS ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE(ANSI). MARKERS SHALL BE MANUFACTURED BY CHAMPION AMERICA INC., BRADY, SETON, OR EQUAL.2.PIPING SHALL BE IDENTIFIED AS FOLLOWS: CONDENSATE, REFRIGERANT LIQUID, REFRIGERANTSUCTION, AND DIRECTIONAL ARROWS. ALL IDENTIFICATIONS MUST BE VISIBLE AT EQUIPMENT.3.VALVES SHALL BE TAGGED IN ACCORDANCE TO VALVE OPERATION SCHEMATIC.4.LABEL ALL FILTERED SUPPLY STOPS.J.STEEL FRAMING FOR SUPPORT1.PROVIDE ALL NECESSARY STEEL FRAMING REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBEDOR IMPLIED ON THE DRAWINGS. ALL PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE AT THISCONTRACTOR'S EXPENSEK.SYSTEM START-UP1.THIS CONTRACTOR SHALL INCLUDE AS A BASE, 2-HOURS OF START-UP TIME PLUS AN ADDITIONAL2-HOURS OF START-UP TIME PER HVAC UNIT SHOWN ON DRAWINGS.L.FINAL INSPECTIONS1.ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, THE ENGINEER SHALL BE NOTIFIED (INWRITING) TO INSPECT THE FINISHED INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THEPLANS, SPECIFICATIONS AND CODES. THE INSTALLING CONTRACTOR SHALL BE RESPONSIBLE TO BRINGALL ITEMS REPORTED BY THE ENGINEER INTO COMPLIANCED:\my Documents\DJC-CA.jpgSHEET NAME:SHEET NUMBER:DESCRIPTION:DATE:REV:ISSUED FOR PERMIT:03.20.20““”“””F1001 SE SANDY BLVD, SUITE 100PORTLAND, OR 97214V. 503.552.9079F. 503.241.7055WWW.GNICHARCH.COM03.20.20796 Merus CourtSt. Louis, MO 63026T 636.349.1600F 636.349.1730Project No: CA-0805 <br />Dutch Bros Coffee - New Freestanding Store <br />15135 Old Harlan Road <br />Lathrop, CA 95330 <br />for: Cherng Family Trust <br />1120 N. Town Center Drive, Suite 150 <br />Las Vegas, Nevada 89144 DB2040 - A1P.PLUMBINGSPECIFICATIONS