21 KITCHEN HOOD NOTES MECHANICAL SPECIFICATIONS N
<br /> N.T.S. w o
<br /> 0 0 `r,
<br /> 1. REFER TO THE "SCHEDULE OF INSTALLATION & RESPONSIBILITIES" INCLUDED WITH THE ARCHITECTURAL DRAWINGS. ` x a, ti 1-0
<br /> KITCHEN EXHAUST DUCTWORK: w f_
<br /> c.D X ti
<br /> N
<br /> 1. KITCHEN HOOD EXHAUST DUCTWORK SHALL BE 16 GAUGE (MINIMUM, 11 GAUGE MAXIMUM) BLACK STEEL CONSTRUCTION. 2. IN GENERAL PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED. ti
<br /> t, o a,
<br /> KITCHEN HOOD EXHAUST DUCTWORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH NFPA 96 WITH EXTERNAL WELDS; - W Q M
<br /> MAINTAIN REQUIRED DUCT CROSS-SECTIONAL AREA UP TO FAN INLET, IN ORDER TO PRESERVE 1,500 FEET PER MINUTE 3. CONTRACTOR SHALL VISIT SITE AND VERIFY ALL CLEARANCES BEFORE FABRICATION OF DUCTWORK AND PROVIDE ADDITIONAL OFFSET AND/OR
<br /> MINIMUM VELOCITY WITHIN DUCT. FOR AIR FLOW MEASUREMENT, PROVIDE 3/4 INCH DIAMETER THREADED HEX NUT WELDED CHANGES IN DUCT SIZES TO MEET FIELD CONDITIONS AND COORDINATE WITH ELECTRICAL AND PLUMBING SUBCONTRACTOR BEFORE ANY CONSTRUCTION v cn o0
<br /> TO THE VERTICAL WALL OF DUCT; POSITION ALONG THE CENTERLINE OF A STRAIGHT SEGMENT OF THE DUCT. PROVIDE HEX WORK. oT
<br /> HEAD BOLT WITH TOOTHED LOCK WASHER TO SERVE AS PLUG; CUT BOLT FLUSH WITH INSIDE OF DUCT. X c2 I c?
<br /> 4. CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DAMAGE TO THE EXISTING INSTALLATION BEFORE PROCEEDING WITH THE WORK. ) M
<br /> 2. INSULATE KITCHEN HOOD EXHAUST DUCTWORK WITH THERMAL CERAMICS FIREMASTER DUCT WRAP SYSTEM FOR GREASE DUCT ' r-
<br /> AND EXHAUST SYSTEMS, LISTED PER U.L. 1978 FOR GREASE DUCT ENCLOSURES IN ACCORDANCE WITH SBCCI ACCEPTANCE O°
<br /> 5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL TRADES INSTALLATION SCHEDULES. FIXED WORK SUCH AS DUCTWORK AND PLUMBING SHALL BE � o ti
<br /> CRITERIA. DUCT WRAP SHALL BE IN ACCORDANCE, LISTED AND LABELED WITH ASTM E2336. INSULATION SYSTEM SHALL o o�
<br /> INCLUDE TWO LAYERS OF 1-1/2 INCH THICKNESS FOIL ENCAPSULATED DUCT WRAP INSULATING MATERIAL, FILAMENT TAPE, INSTALLED PRIOR TO ANY TRADE WORK THAT CAN BE EASILY RELOCATED OR OFFSET SUCH AS ELECTRICAL CONDUITS, SMALL WATER LINES ETC. 0
<br /> BANDING MATERIAL, INSULATION PINS AND ALL ACCESSORIES REQUIRED FOR A COMPLETE U.L. CLASSIFIED SYSTEM FOR
<br /> GREASE DUCT APPLICATIONS. INSTALL INSULATING SYSTEM IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS, FOR 6. THE CONTRACTOR SHALL GUARANTEE, FOR ONE YEAR AFTER THE DATE OF ACCEPTANCE BY THE OWNER, ALL EQUIPMENT, MATERIALS AND, ~ZERO CLEARANCE TO COMBUSTIBLE CONSTRUCTION. EXPOSED DUCT WRAP SYSTEMS SHALL BE PROTECTED WHERE SUBJECT WORKMANSHIP TO BE FREE FROM DEFECT.
<br /> TO PHYSICAL DAMAGE.
<br /> 7. MECHANICAL WORK SHALL MEET ALL REQUIREMENTS OF THE 2019 CALIFORNIA MECHANICAL CODE.
<br /> KITCHEN EXHAUST SYSTEM NOTES: 8. VERIFY SUPPLY VOLTAGE AND CIRCUIT CURRENT-CARRYING CAPACITY WITH ELECTRICAL CONTRACTOR BEFORE ORDERING EQUIPMENT.
<br /> 1. KITCHEN HOOD SHALL BE CAPTIVE AIRE MODEL ND WITH ENERGY MANAGEMENT SYSTEM PACKAGE AS MANUFACTURED BY 9. INSTALL ROOFTOP EQUIPMENT WITH MANUFACTURER'S RECOMMENDED SERVICE AREA CLEARANCES. ROOFTOP UNIT OUTSIDE AIR INTAKES SHALL
<br /> CAPTIVE-AIRE, PERFORATED SUPPLY PLENUM, COMPLETE WITH FIRE SUPPRESSION SYSTEM, AND ALL COMPONENTS AS MAINTAIN A MINIMUM OF 10'-0" FROM ANY EXHAUST OUTLETS OR PLUMBING VENT STACKS. Store:
<br /> REQUIRED FOR A COMPLETE U.L. LISTED HOOD. KETTLEMAN & L. SACRMENTO
<br /> 2. SUPPORT HOOD WITH 1/2" DIAMETER THREADED RODS, NUMBER AS REQUIRED BY HOOD MANUFACTURER. PROVIDE WASHERS, 10. PROVIDE A TRAP IN CONDENSATE DRAIN LINES LOCATED AT THE ROOFTOP UNITS. CONDENSATE DRAIN PIPING SHALL BE UV PROTECTED SCHEDULE 40
<br /> NUTS, AND JAMB NUTS AS REQUIRED. PVC. RE: 5M2.1. CONDENSATE DRAIN PIPING ON ROOF SHALL BE PROPERLY SUPPORTED, RE: 2P2.1. LODI, CA 95242
<br /> 3. SPAN WOOD JOISTS WITH 3" STEEL CHANNEL. ATTACH 1/2" THREADED RODS WITH WASHERS, NUTS, AND JAMB NUTS AS 11. DUCT SMOKE DETECTORS FACTORY INSTALLED IN ROOFTOP UNITS SHALL BE WIRED TO SHUT DOWN UNITS UPON DETECTION OF SMOKE. WHERE A FIRE Restaurant #RC576
<br /> REQUIRED. ALARM SYSTEM IS TO BE INSTALLED, THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ADDITIONAL DUCT SMOKE DETECTORS AS REQUIRED
<br /> FOR SUPERVISION BY THE FIRE ALARM SYSTEM. f4E-HV-M SCHEME A
<br /> 4. THE HOOD EXHAUST FAN MUST CONTINUE TO OPERATE AFTER EXTINGUISHING SYSTEM ACTIVATION. p
<br /> 5. ALL KITCHEN EXHAUST FANS, HOODS, CURBS, FIRE SUPPRESSION SYSTEM, ETC. SHALL BE SUPPLIED BY OWNER AND 12. UNLESS NOTED OTHERWISE, METAL DUCTWORK SHALL BE EXTERNALLY INSULATED G-60 GALVANIZED SHEET METAL CONSTRUCTION IN ACCORDANCE
<br /> INSTALLED BY CONTRACTOR. RE: SP2 FOR LIST OF OWNER SUPPLIED EQUIPMENT. WITH THE LATEST EDITION OF SMACNA HVAC DUCT CONSTRUCTION STANDARDS. INSULATION SHALL BE 1-1/2" FOIL-FACED FIBERGLASS DUCT WRAP Professional of Record: NAME
<br /> WITH AN INSTALLED MINIMUM THERMAL RESISTANCE (R-VALUE) OF 6.0.
<br /> 6. KITCHEN TYPE I EXHAUST HOODS SHALL BE UL LISTED (SEE UL LISTING DESCRIPTION).
<br /> 13. EXPOSED SPIRAL DUCTWORK AND FITTINGS SHALL BE FACTORY-FABRICATED LINED SINGLE WALL DUCT CONSTRUCTED OF 26 GAUGE (MIN.)
<br /> 7. JOINTS AND SEAMS ON EXHAUST HOODS SHALL BE WELDED LIQUID-TIGHT. GALVANIZED STEEL. INSULATION SHALL BE 1" THICK RESIN-BONDED FIBERGLASS OR ELASTOMERIC FOAM INSTALLED PER MANUFACTURER'S
<br /> 8. EXHAUST FAN MOTOR SHALL BE LOCATED OUTSIDE OF THE EXHAUST DUCT. EXHAUST DISCHARGE MUST TERMINATE AT REQUIREMENTS. EXPOSED DUCT SHALL BE STORED IN A CLEAN, DRY ENVIRONMENT WITH ALL OPEN ENDS SEALED. EXPOSED DUCT SHALL BE KEPT
<br /> LEAST 40 INCHES ABOVE THE HIGHEST POINT THE SURFACE OF THE ROOF MEETS THE DUCT.
<br /> FREE FROM PHYSICAL DAMAGE, INCLUDING DETERIORATED SURFACE FINISH. ANY VISIBLY DAMAGED OR DEFORMED DUCT WILL NOT BE ACCEPTED. ALL
<br /> EXPOSED SPIRAL DUCTWORK, FITTINGS, TAKEOFFS, ETC. SHALL BE INTERNALLY SEALED. MASTICS SHALL NOT BE USED ON EXPOSED DUCTWORK. ALL
<br /> 9. THE MAKE-UP AIR FAN SHALL BE ELECTRICALLY INTERLOCKED WITH THE HOOD EXHAUST FAN FOR SIMULTANEOUS EXPOSED DUCTWORK AND REGISTERS SHALL HAVE MILL FINISH. DO NOT PAINT.
<br /> OPERATION UNDER NORMAL OPERATING CONDITIONS.
<br /> 14. TURNING VANES SHALL BE PROVIDED IN ALL RECTANGULAR SUPPLY DUCT ELBOWS WITH TURNING ANGLES GREATER THAN 15 DEGREES AND LESS ROBISON
<br /> 10. ALL OUTSIDE AIR INTAKES SHALL BE LOCATED A MINIMUM OF 10'-0" AWAY FROM THE EXHAUST DUCT TERMINATION. THAN 90 DEGREES IN ACCORDANCE WITH THE LATEST SMACNA STANDARDS
<br /> 11. FOR LISTED HOODS, A 6" OVERHANG MINIMUM IS REQUIRED ON ALL SIDES OF EQUIPMENT. 15. DUCT DIMENSIONS SHOWN ON DRAWINGS INCLUDE INTERNAL INSULATION (WHERE USED) AND OVERALL DUCT DIMENSION IS SHOWN. DUCT LINER SHALL ENGINEERING, INC
<br /> BE 1" THICK PLEAT WITH WELDED SEAMS UNLESS NOTED OTHERWISE1940140TH AVE W.,SUITE 302
<br /> .
<br /> 12. GREASE TROUGH SHALL BE SLOPED TO REMOVABLE GREASE CUP (1 GALLON MAXIMUM). LvNNwooD,wA9ao36
<br /> 206-364-3343 TEL
<br /> 13. MINIMUM CLEARANCE TO COMBUSTIBLES SHALL BE OBSERVED FOLLOWING NFPA 96 GUIDELINES: 18" FOR UNENCLOSED 16. DUCTWORK SHALL BE SECURELY SUPPORTED, HUNG, OR SUSPENDED IN ACCORDANCE WITH CHAPTER 5 OF THE CURRENT EDITION OF SMACNA HVAC
<br /> COMPONENTS, AS PER THE LISTING REQUIREMENTS OF ANY COMPONENT LISTED FOR LESS THAN 18", AND 9" OR 3" WHERE DUCT CONSTRUCTION STANDARDS. REI# 424-1551
<br /> A PERMITTED CLEARANCE REDUCTION SYSTEM IS USED AS PRESCRIBED BY NFPA 96.
<br /> 17. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUPPORT OR SUSPEND MECHANICAL EQUIPMENT AND MATERIALS.
<br /> 14. EXHAUST HOOD METAL SHALL BE A MINIMUM OF 18 GA ALUMINIZED STEEL AND 20 GA STAINLESS STEEL.
<br /> 18. DUCTWORK, DIFFUSERS, REGISTERS, GRILLES, AND OTHER ITEMS OF THE AIR HANDLING SYSTEM SHALL NOT BE SUPPORTED BY THE CEILING GRID OR
<br /> 15. DISTANCE FROM THE FLOOR TO THE BOTTOM OF THE HOOD ON A CANOPY EXHAUST HOOD SHALL BE 75" - 84". CEILING SUSPENSION SYSTEM. SUPPORT HVAC SYSTEM COMPONENTS FROM STRUCTURE IN ACCORDANCE WITH THE LATEST SMACNA STANDARDS.
<br /> 16. DISTANCE FROM THE COOKING SURFACE TO THE BOTTOM OF THE FILTER SHALL BE GREATER THAN 18". 19. CEILING SUPPLY AIR DIFFUSERS SHALL BE 4-WAY THROW UNLESS OTHERWISE INDICATED ON FLOOR PLAN DRAWINGS. COORDINATE AIR DEVICE Q�pFESS/ON
<br /> 17. CLEANOUTS ON THE EXHAUST DUCT SHALL BE PROVIDED AT ALL CHANGES OF DIRECTION AND 20 FOOT INTERVALS ON ALL LOCATIONS WITH LIGHTING FIXTURES. INSULATE TOPS OF AIR DIFFUSERS WITH 2" THICK 3/4 POUND GLASS FIBER WITH REINFORCED ALUMINUM FOIL
<br /> HORIZONTAL RUNS.
<br /> VAPOR BARRIER. OVERLAP DIFFUSER 6 ' ALL AROUND. SCRIBE TO NECK SIZE AND ATTACH WITH ALUMINUM TAPE. S
<br /> GO 02 �
<br /> 18. CLEANOUTS ON THE EXHAUST DUCT SHALL HAVE A MINIMUM DIMENSION OF 12" X 12". 20. AT ROUND DUCT BRANCH TAKE-OFFS, PROVIDE FLEXMASTER FLD SERIES (OR EQUAL) SPIN COLLAR "TAKE-OFF" FITTING, 26 GA. (MIN.) GALVANIZED w 0. M-2871 Z
<br /> STEEL CONSTRUCTION WITH SQUARE ROD AXLE, AXLE BUSHINGS, AND 2" HIGH ELEVATED REGULATOR FOR EXTERNALLY INSULATED DUCTWORK. SEE
<br /> 19. AN AUTOMATIC SUPPRESSION SYSTEM COMPLYING WITH UL300 SHALL BE INSTALLED IN THE KITCHEN HOOD SYSTEM. NOTE 28 FOR ADDITIONAL REQUIREMENTS. � E - 0-21 �
<br /> PROVIDED BY MECHANICAL CONTRACTOR. SUBMIT KITCHEN HOOD FIRE SUPPRESSION SYSTEM SHOP DRAWINGS TO THE STATE
<br /> FIRE MARSHAL'S OFFICE OR AUTHORITY HAVING JURISDICTION FOR REVIEW, BEFORE BEGINNING INSTALLATION. 21. FLEXIBLE AND RIGID ROUND DUCT TAKE-OFFS FOR DIFFUSERS SHALL BE THE SAME SIZE AS THE DIFFUSER NECK. MAXIMUM FLEXIBLE DUCT LENGTH q�F HA
<br /> SHALL BE 5'-0" FOR FINAL RUN TO DIFFUSER. PROVIDE RIGID ELBOW AT SUPPLY DIFFUSER NECK PER DETAIL 3M2.1. RIGID ELBOWS SHALL BE F OF CAL�F�
<br /> 20. IF A FIRE ALARM IS PROVIDED, THE AUTOMATIC SUPPRESSION SYSTEM MUST BE CONNECTED TO THE FIRE ALARM SYSTEM. UTILIZED WHERE TURNING ANGLES EXCEED 45 DEGREES.
<br /> 21. ACTIVATION OF THE SUPPRESSION SYSTEM SHALL AUTOMATICALLY SHUT OFF ALL FUEL AND HEAT COMPONENTS TO ALL
<br /> EQUIPMENT UNDER THE HOOD. 22. INSULATE RIGID ROUND DUCTS WITH 1-1/2" FOIL-FACED FIBERGLASS DUCT WRAP, DUCT WRAP SHALL HAVE AN INSTALLED MINIMUM THERMAL
<br /> 22. MANUAL ACTIVATION FOR THE SUPPRESSION SYSTEM SHALL BE LOCATED AT LEAST 10' BUT NOT MORE THAN 20' AWAY RESISTANCE (R-VALUE) OF 6.0. 12/21/20
<br /> FROM THE EXHAUST HOOD, IN THE PATH OF EGRESS. SEE DRAWING M1.1 FOR PULL STATION LOCATION. 23. FLEX DUCT SHALL BE PREINSULATED (R-6.0 MIN.) CONFORMING TO UL-181 WITH INTERNAL POLYETHYLENE FABRIC, GALVANIZED INNER HELIX
<br /> MECHANICALLY FASTENED TO INNER LINER, AND MIN. 10" W.G. POSITIVE INTERNAL WORKING PRESSURE. FLEX DUCT SHALL BE FLEXMASTER 1M OR Prototype: P4E- HV 2020-2.0 RELEASE
<br /> 23. HORIZONTAL EXHAUST DUCT SHALL SLOPE NOT LESS THAN 1" PER FOOT TOWARD HOOD. EQUAL.
<br /> 24. HOOD EXHAUST FANS SHALL BE PROVIDED WITH SAFE ACCESS AND A WORK SURFACE FOR INSPECTION AND CLEANING. Prototype Issue Date: 7.14.2020
<br /> 24. FLEX DUCTS SHALL BE SUPPORTED PER SMACNA STANDARDS (FIGURE 3-10 AND FIGURE 3-11) WITH 1-1/2" WIDE 22 GAUGE GALVANIZED Design Bulletin Updates: --
<br /> 25. THE OPERATION OF THE SUPPRESSION SYSTEM SHALL AUTOMATICALLY SHUT OFF THE SUPPLY FAN (IF DUCTED INTO THE FULL-ROUND HANGERS OR HALF-ROUND SADDLES SPACED AT AN INTERVAL NOT TO EXCEED 5'-0" BETWEEN HANGERS. SAG BETWEEN HANGERS
<br /> HOOD) AND ALL SOURCES OF FUEL AND ELECTRIC POWER THAT PRODUCE HEAT TO PROTECTED EQUIPMENT. EXHAUST SHALL NOT EXCEED 1/2" PER FOOT. WHERE FLEX DUCTS ARE PERMITTED BY CODE TO LAY ACROSS BUILDING STRUCTURE, PIPING, OR OTHER Date Issued: Bulletin Number:
<br /> FAN SHALL REMAIN ACTIVE THROUGH SUPPRESSION SYSTEM DEPLOYMENT. DUCTWORK, A HALF-ROUND SHEET METAL SHIELD MATCHING THE DUCT DIAMETER AND EXTENDING NO LESS THAN 3" BEYOND THE SUPPORTING
<br /> 26. KITCHEN HOOD SHALL BE EQUIPPED WITH HEAT SENSOR FOR AUTOMATIC START OF EXHAUST FAN AND MAKE-UP AIR OBJECT IN EACH DIRECTION SHALL BE PROVIDED. -- --
<br /> FAN. 25. FURNISH AND INSTALL A COMPLETE SYSTEM OF TEMPERATURE CONTROLS. THE CONTROL DEVICES SHALL BE AS MANUFACTURED BY THE EQUIPMENT
<br /> 27. ALL KITCHEN HOOD EQUIPMENT AND ITS INSTALLATION SHALL COMPLY WITH NFPA 96. SUPPLIER. SYSTEMS SHALL BE INSTALLED AND ADJUSTED BY QUALIFIED MECHANICS IN THIS FIELD. CONTROL WIRING SHALL BE BY THE MECHANICAL 1ST BLDG. SUBMITTAL
<br /> CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL CONTROL DEVICES AND BE RESPONSIBLE FOR OVERALL COORDINATION
<br /> AND PERFORMANCE OF ALL OF THE CONTROLS SYSTEM. ALL WIRING SHALL BE IN CONDUIT, SEPARATE FROM ALL OTHER CONDUIT. UNLESS SPECIFIED
<br /> OTHERWISE, INSTALL ALL SYSTEM COMPONENTS IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
<br /> 26. WALL-MOUNTED THERMOSTATS AND/OR TEMPERATURE SENSORS SHALL BE INSTALLED AT AN ELEVATION OF 54" ABOVE FINISHED FLOOR TO THE TOP
<br /> OF THE DEVICE UNLESS OTHERWISE NOTED ON DRAWINGS. LOCATION OF THE WALL-MOUNTED THERMOSTATS SHALL BE COORDINATED WITH OTHER
<br /> TRADES FOR A NEAT APPEARANCE. FINAL LOCATION OF THERMOSTATS AND SENSORS SHALL BE SUBJECT TO THE APPROVAL OF THE OWNER OR THE
<br /> OWNER'S REPRESENTATIVE IN THE FIELD.
<br /> 27. CONTROLS WIRING FOR SPACE HUMIDITY SENSORS SHALL CONSIST OF TWO SEPARATE SHIELDED CABLES EACH WITH TWISTED PAIR CONDUCTORS WITH
<br /> OVERALL SHIELD. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR ADDITIONAL INFORMATION. REVISIONS:
<br /> 28. PROVIDE BALANCING DAMPERS AND DEVICES WHERE SHOWN ON PLANS, AS LISTED IN THE MECHANICAL EQUIPMENT SCHEDULES, AND AS OTHERWISE 12.22.2020 1st Building Submittal
<br /> REQUIRED TO FACILITATE FULL AIR SYSTEM BALANCING. DAMPER REGULATORS SHALL BE SELF-LOCKING DAMPER HANDLES OR IMPROVED FRICTION 1
<br /> LOCK HANDLES IN LIEU OF WINGNUT LOCKS. DAMPER REGULATORS SHALL BE YOUNG REGULATOR MODEL 443B, ROSSI EVERLOCK SERIES, OR ROSSI 2
<br /> TWISTKNOB SERIES. WHERE LOCATED ABOVE HARD CEILINGS OR IN OTHER INACCESSIBLE LOCATIONS, PROVIDE REMOTE DAMPER OPERATORS 3
<br /> ACCESSIBLE THROUGH THE NEAREST CEILING ACCESS PANEL.
<br /> 4
<br /> 29. RAISING CANE'S IS DIRECTLY HIRING MELINK CORPORATION FOR ALL HVAC TEST & BALANCE (TAB) SERVICES, PLEASE DO NOT INCLUDE TAB SERVICES 5
<br /> IN YOUR BID. MELINK CORPORATION IS THE ONLY APPROVED TAB PROVIDER. CONTACT MELINK AT: RAISINGCANES@MELINKCORP.COM OR CALL MELINK 6
<br /> AT 513.965.7300 TO SCHEDULE THE TAB SERVICES. THE GENERAL CONTACTOR SHALL COORDINATE THE TAB DATE, PROVIDING AN INITIAL ESTIMATED 7
<br /> DATE TO MELINK AT LEAST 4 WEEKS IN ADVANCE NOTICE AND SHALL COMPLETE THE REQUIRED SITE-READINESS CHECKLIST AT THE REQUEST OF
<br /> MELINK, BEFORE THE TAB TECHNICIAN CAN BE APPROVED TO TRAVEL TO THE PROJECT SITE. 8
<br /> THE TAB WORK SHALL BE PERFORMED AFTER THE HVAC SYSTEM IS INSTALLED AND COMPLETELY OPERATIONAL BUT BEFORE THE FACILITY IS TURNED
<br /> OVER TO OPERATIONS. PRIOR TO COMMENCEMENT OF THE TAB WORK, THE GENERAL CONTRACTOR SHALL ENSURE THAT THE BUILDING ENCLOSURE IS
<br /> COMPLETE, ALL MECHANICAL WORK IS COMPLETE, HVAC EQUIPMENT IS INSTALLED AND STARTED-UP IN ACCORDANCE WITH THE MANUFACTURER'S
<br /> RECOMMENDATIONS, HVAC CONTROL SYSTEMS ARE COMPLETE AND STARTED-UP, PERMANENT ELECTRICAL POWER IS COMPLETE AND ELECTRICAL Sheet Title:
<br /> PHASING IS VERIFIED, CLEAN AIR FILTERS ARE INSTALLED IN THE HVAC EQUIPMENT, AND ALL HVAC DAMPERS ARE FULLY OPENED AND FLAGGED. KITCHEN HOOD NOTES
<br /> IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO PROVIDE SAFE AND CLEAR ACCESS TO ALL COMPONENTS OF THE HVAC SYSTEM FOR
<br /> THE TAB TECHNICIAN. THIS INCLUDES PROVIDING LADDERS, LIFTS, ROOF ACCESS, CEILING ACCESS, KEYS, SECURITY ACCESS, AND SO ON. AND HVAC SPECS.
<br /> THE GENERAL CONTRACTOR'S MECHANICAL CONTRACTOR IS REQUIRED TO BE ON-SITE THE ENTIRE TIME MELINK IS ON-SITE PERFORMING THE TAB
<br /> WORK. THE MECHANICAL CONTRACTOR SHALL OPERATE THE HVAC AND CONTROL SYSTEMS AS DIRECTED BY THE TAB TECHNICIAN AND SHALL MAKE Date: 12.07.2020
<br /> ANY AND ALL REPAIRS AND ADJUSTMENTS TO THE HVAC SYSTEM AS NEEDED FOR MELINK TO COMPLETE THE TAB WORK, INCLUDING ANY PULLEY
<br /> AND BELT REPLACEMENTS. Project Number: RAC 19048.0
<br /> MELINK WILL PROVIDE COPIES OF THE TAB REPORT AND THE DEFICIENCIES LIST TO BOTH THE OWNER AND THE GENERAL CONTRACTOR. THE COST OF Drawn By: _
<br /> ANY DELAYS AND REVISITS TO COMPLETE THE TAB WORK DUE TO SYSTEM DEFICIENCIES OR SITE CONDITIONS ARE TO BE THE RESPONSIBILITY OF THE
<br /> GENERAL CONTRACTOR.
<br /> 30. DUCT LEAKAGE TEST PER CMC 603.10.1. DUCTWORK SHALL BE LEAK-TESTED IN ACCORDANCE WITH THE SMACNA HVAC AIR DUCT LEAKAGE TEST Sheet Number:
<br /> MANUAL.
<br /> M3 , 2 Q
<br /> m