Laserfiche WebLink
gn <br /> o <br /> CALIFORNIA GREEN BUILDING NOTES xC"J <br /> w � N <br /> o _ ti <br /> W <br /> C1. <br /> 1. THE PERSON WITH OVERALL RESPONSIBILITY FOR CONSTRUCTION OR THE PERSON RESPONSIBLE FOR THE INSTALLATION <br /> • ii <br /> OF REGULATED FEATURES, MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES SHALL POST, OR MAKE AVAILABLE v cn o <br /> WITH THE BUILDING PERMIT(S) ISSUED FOR THE BUILDING, THE REQUIRED INSTALLATION CERTIFICATES) FOR FEATURES, _�fCDo <br /> MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES REGULATED BY THE APPLIANCE EFFICIENCY REGULATIONS OR x+ C12 Q`? <br /> PART 6. SUCH INSTALLATION CERTIFICATES) SHALL BE MADE AVAILABLE TO THE ENFORCEMENT AGENCY FOR ALL O C N M <br /> APPROPRIATE INSPECTIONS. THESE CERTIFICATES SHALL: m N <br /> o ti <br /> 1.1. IDENTIFY FEATURES, MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES REQUIRED TO VERIFY COMPLIANCE WITH THE o a' <br /> w <br /> APPLIANCE EFFICIENCY REGULATIONS AND PART 6. cc °J <br /> CD <br /> 1.2. INCLUDE A STATEMENT INDICATING THAT THE FEATURES, MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES <br /> CONFORM TO THE APPLIANCE EFFICIENCY REGULATIONS AND PART 6 AND THE REQUIREMENTS FOR SUCH FEATURES, <br /> MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES GIVEN IN THE PLANS AND SPECIFICATIONS APPROVED BY THE <br /> LOCAL ENFORCEMENT AGENCY. <br /> 1.3. STATE THE NUMBER OF THE BUILDING PERMIT UNDER WHICH THE CONSTRUCTION OR INSTALLATION WAS PERFORMED. <br /> 2. AFTER INSTALLING WALL, CEILING, OR FLOOR INSULATION, THE INSTALLER SHALL MAKE AVAILABLE TO THE ENFORCEMENT <br /> AGENCY OR POST IN A CONSPICUOUS LOCATION IN THE BUILDING A CERTIFICATE SIGNED BY THE INSTALLER STATING Store: <br /> THAT THE INSTALLATION IS CONSISTENT WITH THE PLANS AND SPECIFICATIONS DESCRIBED IN SEC. 10-103 (A) 2. THE KETTLEMAN & L. SACRMENTO <br /> CERTIFICATE SHALL ALSO STATE THE MANUFACTURER'S NAME, MATERIAL IDENTIFICATION, AND THE INSTALLED R-VALUE. <br /> 3. WITHIN 90 DAYS AFTER ISSUANCE OF CERTIFICATE OF OCCUPANCY RECORD DRAWINGS SHALL BE PROVIDED TO THE LODI, CA 95242 <br /> OWNER. IF ANY CHARACTERISTIC IS MATERIALLY CHANGED BEFORE FINAL CONSTRUCTION AND INSTALLATION, SUCH THAT <br /> THE BUILDING MAY NO LONGER COMPLY WITH PART 6, THE BUILDING MUST BE BROUGHT INTO COMPLIANCE, AND SO Restaurant #RC576 <br /> INDICATED ON AMENDED PLANS AND CERTIFICATE OF COMPLIANCE THAT SHALL BE SUBMITTED FOR PLAN APPROVAL. <br /> 4. THE BUILDER SHALL PROVIDE THE BUILDING OWNER OR THE PERSON(S) RESPONSIBLE FOR BUILDING MAINTENANCE (IN P4E-HV-M SCHEME A <br /> CASE OF MULTI-TENANT OR CENTRALLY OPERATED BUILDINGS) AT OCCUPANCY THE FOLLOWING: <br /> Professional of Record: NAME <br /> 4.1. OPERATING INFORMATION: THE APPROPRIATE CERTIFICATES) OF COMPLIANCE AND A LIST OF THE FEATURES, MATERIALS, <br /> COMPONENTS, AND MECHANICAL DEVICES INSTALLED IN THE BUILDING AND INSTRUCTIONS ON HOW TO OPERATE THEM <br /> EFFICIENTLY. <br /> 4.2. MAINTENANCE INFORMATION: REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY STATED AND INCORPORATED <br /> ON A READILY ACCESSIBLE LABEL. THE LABEL MAY BE LIMITED TO IDENTIFYING THE OPERATION AND MAINTENANCE <br /> MANUAL. <br /> 4.3. VENTILATION INFORMATION: A DESCRIPTION OF THE QUANTITIES OF OUTDOOR AND RECIRCULATED AIR THAT THE <br /> VENTILATION SYSTEMS ARE DESIGNED TO PROVIDE TO EACH AREA. <br /> 5. ANY ROOFING PRODUCT USED AS A COOL ROOF SHALL BE CERTIFIED AND LABELED IN ACCORDANCE WITH THE ROBISON <br /> REQUIREMENTS OF SEC. 10-113 BY THE COOL ROOF RATING COUNCIL (CRRC) AND MEET CONDITIONS SET IN SEC. 118 (1). <br /> 6. DUCT SYSTEMS USED WITH BLOWER TYPE EQUIPMENT WHICH ARE PORTIONS OF A HEATING, COOLING, ABSORPTION, ENGINEERING, INC <br /> EVAPORATIVE COOLING OR OUTDOOR AIR VENTILATION SYSTEM SHALL BE SIZED IN ACCORDANCE WITH CHAPTER 17 OF 1940140TH AVE W.,SUITE 302 <br /> THE CALIFORNIA MECHANICAL CODE. LYNNWOOD,WA 98036 <br /> 206-364-3343 TEL <br /> 7. SUPPLY AIR, RETURN AIR, AND OUTSIDE AIR FOR HEATING, COOLING, OR EVAPORATIVE COOLING SYSTEMS SHALL BE <br /> CONDUCTED THROUGH DUCT SYSTEMS CONSTRUCTED OF METAL AS SET FORTH IN THE ANSI/SMACNA 006-2006 HVAC REI# 424-1551 <br /> DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE, OR ANOTHER APPROVED DUCT CONSTRUCTION STANDARD. <br /> 8. MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME-SPREAD INDEX <br /> NOT GREATER THAN TWENTY-FIVE (25) AND A SMOKE DEVELOPED INDEX NOT GREATER THAN FIFTY (50) WHEN TESTED <br /> AS A COMPOSITE PER APPLICABLE TESTING STANDARD. <br /> 9. WHEN FIRE DETECTION OR ALARM SYSTEMS ARE PROVIDED FOR THE BUILDING, ANY REQUIRED SMOKE DETECTORS SHALL RpFESS/p <br /> BE SUPERVISED BY SUCH SYSTEMS AND SHALL BE CAPABLE OF ACTIVATING THE FIRE ALARM SYSTEM. P D R pN,q� <br /> 10. REFRIGERANT SERVICE PORTS LOCATED OUTDOORS SHALL BE FITTED WITH LOCKING TYPE TAMPER RESISTANT CAPS OR <br /> SHALL BE PROTECTED FROM UNAUTHORIZED ACCESS BY AN ACCEPTABLE MEANS. 2 z <br /> o. M-2871 <br /> 11. ALL APPLIANCES DESIGNED TO BE FIXED IN POSITION SHALL BE SECURELY FASTENED IN PLACE PER BUILDING CODEUJ <br /> REQUIREMENTS OR APPLICABLE MANUFACTURER INSTALLATION REQUIREMENTS. E - 0-21 <br /> 12. ROOF MOUNTED EQUIPMENT SHALL BE LABELED AS TO THE SPACE IT SERVES. s�q �F HANG <br /> 13. AT THE TIME OF ROUGH INSTALLATION, OR DURING STORAGE ON THE CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF lF pF CA��F�� <br /> THE HEATING, COOLING, AND VENTILATING EQUIPMENT, ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT <br /> OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEET METAL, OR OTHER ACCEPTABLE METHODS TO REDUCE THE <br /> AMOUNT OF DUST, WATER, AND DEBRIS WHICH MAY ENTER THE SYSTEM. <br /> 14. PRIOR TO PERMIT BEING FINALED, A COMPLETE REPORT OF THE COMMISSIONING PROCESS SHALL BE PROVIDED TO THE 12/21/20 <br /> OWNER OR OWNER'S REPRESENTATIVE AND FORM 5.410 - VERIFICATION SHALL BE COMPLETED AND PROVIDED TO THE <br /> INSPECTOR. <br /> Prototype: P4E- HV 2020 -2.0 RELEASE <br /> 15. INSTALL HVAC, REFRIGERATION, AND FIRE SUPPRESSION EQUIPMENT THAT DO NOT CONTAIN CFC'S PER 2019 CGBSC <br /> SECTION 5.508.1.2. Prototype Issue Date: 7.14.2020 <br /> 16. INSTALL HVAC, REFRIGERATION, AND FIRE SUPPRESSION EQUIPMENT THAT DO NOT CONTAIN HALONS PER 2019 CGBSC Design Bulletin Updates: -- <br /> SECTION 5.508.1.1. <br /> Date Issued: Bulletin Number: <br /> 17. FOR BUILDINGS OR ADDITIONS EQUIPPED WITH DEMAND CONTROL VENTILATION, CO2 SENSORS AND VENTILATION CONTROLS <br /> SHALL BE SPECIFIED AND INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2019 CALIFORNIA ENERGY CODE, -- -- <br /> SECTION 120(C)(4). <br /> 18. FOR MECHANICALLY OR NATURALLY VENTILATED SPACES IN BUILDINGS, MEET THE MINIMUM REQUIREMENTS OF SECTION 1ST BLDG. SUBMITTAL <br /> 120.1 (REQUIREMENTS FOR VENTILATION) FOR THE 2019 CALIFORNIA ENERGY CODE, OR THE APPLICABLE LOCAL CODE, <br /> WHICHEVER IS MORE STRINGENT, AND DIVISION 1, CHAPTER 4 OF CCR, TITLE 8. <br /> 19. PROVIDE REGULARLY OCCUPIED AREAS OF THE BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR <br /> THAT PROVIDE AT LEAST A MERV OF 13. MERV 13 FILTERS SHALL BE INSTALLED AFTER ANY FLUSH-OUT OR TESTING <br /> AND PRIOR TO OCCUPANCY, AND RECOMMENDATIONS FOR MAINTENANCE WITH FILTERS OF THE SAME VALUE SHALL BE <br /> INCLUDED IN THE OPERATION AND MAINTENANCE MANUAL. <br /> EXCEPTION: A MERV-1 FILTER SHALL BE ALLOWED FOR RETURN AIR ONLY OR RETURN WITH PREFILTERED OUTSIDE AIR, IF <br /> THE FILTER IS OF A RE-USABLE , NON-DISPOSABLE TYPE, AND THE FAN ENERGY USE OF THAT AIR DELIVERY SYSTEM IS <br /> 0.4W/CFM OR LESS AT DESIGN AIRFLOW. <br /> 20. THE PERMANENT HVAC SYSTEM SHALL ONLY BE USED DURING CONSTRUCTION IF NECESSARY TO CONDITION ADDITIONS REVISIONS: <br /> OR AREAS OF ALTERATION WITHIN THE REQUIRED TEMPERATURE RANGE FOR MATERIAL AND EQUIPMENT INSTALLATION. IF 12,22.2020 1st Building Submittal <br /> THE HVAC SYSTEM IS USED DURING CONSTRUCTION, USE RETURN AIR FILTERS WITH A MINIMUM EFFICIENCY REPORTING g <br /> VALUE (MERV) OF 13, BASED ON ASHRAE 52.2-1999, OR AN AVERAGE EFFICIENCY OF 30 PERCENT BASED ON ASHRAE 1 <br /> 52.1-1992. REPLACE ALL FILTERS IMMEDIATELY PRIOR TO OCCUPANCY, OR, IF THE BUILDING IS OCCUPIED DURING 2 <br /> ALTERATION, AT THE CONCLUSION OF CONSTRUCTION. <br /> 3 <br /> 21. PERFORM TESTING AND ADJUSTING PROCEDURES IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS AND 4 <br /> APPLICABLE STANDARDS ON EACH SYSTEM. 5 <br /> 22. A FINAL REPORT FOR THE TESTING AND ADJUSTING OF ALL NEW SYSTEMS SHALL BE COMPLETED AND PROVIDED TO THE 6 <br /> FIELD INSPECTOR PRIOR TO FINAL APPROVAL. THIS REPORT SHALL BE SIGNED BY THE INDIVIDUAL RESPONSIBLE FOR 7 <br /> PERFORMING THESE SERVICES. <br /> 8 <br /> 23. FOR ALL NEW EQUIPMENT, AN OPERATION & SYSTEMS MANUAL SHALL BE PROVIDED TO THE FIELD INSPECTOR AT THE <br /> TIME OF FINAL INSPECTION. <br /> 24. PROVIDE THE BUILDING OWNER OR REPRESENTATIVE WITH DETAILED OPERATING AND MAINTENANCE INSTRUCTIONS AND <br /> COPIES OF GUARANTEES/WARRANTIES FOR EACH SYSTEM. 0&M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA Sheet Title: <br /> REQUIREMENTS IN CCR, TITLE 8, SECTION 5142, AND OTHER RELATED REGULATIONS. <br /> 25. INCLUDE A COPY OF ALL INSPECTION VERIFICATIONS AND REPORTS REQUIRED BY THE ENFORCING AGENCY. HVAC SPECS AND <br /> 26. PRIOR TO FINAL INSPECTION THE LICENSED CONTRACTOR, ARCHITECT OR ENGINEER RESPONSIBLE IN CHARGE OF THE CALGREEN NOTES <br /> OVERALL CONSTRUCTION MUST PROVIDE TO THE BUILDING DEPARTMENT OFFICIAL WRITTEN VERIFICATION THAT ALL <br /> APPLICABLE PROVISIONS FROM THE GREEN BUILDING STANDARDS CODE HAVE BEEN IMPLEMENTED AS PART OF THE <br /> CONSTRUCTION. CGC 102.3. Date: 12.07.2020 <br /> Project Number: RAC19048.0 <br /> Drawn By: _ <br /> Sheet Number: <br /> M4 , 1 <br /> J <br /> Q <br /> 1- <br /> G <br /> m <br /> M <br /> N <br />