|
I o
<br /> 0 F I I
<br /> C
<br /> ED
<br /> to cV m
<br /> 0 0
<br /> �1 °' ti ctio
<br /> w o ti
<br /> IIW O c�
<br /> c
<br /> l
<br /> C.7 N_ o
<br /> C O r
<br /> V = g a'
<br /> cfl
<br /> V) v) r-_
<br /> - m N
<br /> C=)
<br /> rn
<br /> 00 . .
<br /> cfl
<br /> FF:::::: IL
<br /> 2
<br /> FREEZER COMPRESSOR
<br /> 5.04KVA,208V3P3W F-4
<br /> Store:
<br /> A-22,24,26 A-25 1/4HP,120V1 P2W 3
<br /> KETTLEMAIV & L. SACRMEIVT�J
<br /> LORI, CA 95242
<br /> A-54,56,58 A-39,41,43
<br /> 3/4"C,3#10,#10N,#1013 #10 Restaurant #RC576
<br /> P CU-2 WP P
<br /> '� 4 04KVA,208V3P3W P4E-HV-M SCHEME A
<br /> 30/3/NP � A-33,35,37
<br /> A-48,50,52 CU-3 Professional of Record: NAME
<br /> A-28,30,32 #10 7.71 KVA,208V3P4W
<br /> F-3 A-45,47,49 WIP + — U-4
<br /> Wp 1.5HP,208V3P3W #10 5
<br /> 30/3/NP WP O .04KVA, 08V3P,3 !!
<br /> B-48
<br /> WID
<br /> WP '<' GFCI 1
<br /> 00- R COMPRESSOR 2HP,208V3P3W
<br /> .04KV , 08V3P3W CU-1 A-10,12,14 WP A-42,44,46 ROBISON
<br /> 4.04KVA,208V3P3W #10
<br /> 401-1 1 MUq-1 A-7,9,11 ENGINEERING, INC
<br /> 5 1.5HP,208V3P3W P
<br /> /4"C,3#4,#4N 1013 194LLYNNWOOD,WA 98036 02
<br /> _ B-48
<br /> 206.364-3343 TEL
<br /> \� h GFCI #10 A-16,18,20 ❑
<br /> F-1 REi# 424- 551
<br /> 2HP,208V3P3W W �� RTU—1
<br /> I \ I A-27,29,31 � I 2 4 I
<br /> \ z � F-2 3HP,15KV 08V3P4W
<br /> \ �I W 1 HP,208V3P3W 5P
<br /> 5 GFCI
<br /> RTU-2 �� PIC[
<br /> j�I OFESS/
<br /> 4 2 5HP 19.7KVA 208V3P4W z B-4 QR ONS
<br /> L WP
<br /> C, Z
<br /> A-13,15,17 No. E-23059 m
<br /> 1-1/4"C,3#2,#2N,#8G
<br /> OWP 30/2 6 WP
<br /> 30 2 WP 0
<br /> O O / g 6 q SEC
<br /> 30/2
<br /> TF o CAS\Fpm
<br /> iz/zz/zo
<br /> Prototype: P4E- HV 2020 - 2.0 RELEASE
<br /> Prototype Issue Date: 7.14.2020
<br /> 77
<br /> 9 Design Bulletin Updates: --
<br /> 10 �
<br /> � 0 10 Date Issued: Bulletin Number:
<br /> POWER ROOF PLAN
<br /> 1ST BLDG. SUBMITTAL
<br /> O 0 \D (D (D H.1 (D K.1 K.3
<br /> 2 KEYNOTES
<br /> REVISIONS:
<br /> 12.22.2020 1st Building Submittal
<br /> OPROVIDE 3#12, 1#12G, 1/2"C FROM SUPPLY FAN TERMINAL BLOCK ON HOOD PRE—WIRED 1
<br /> CONTROL CABINET TO MAKE—UP AIR PACKAGE ON ROOF. 2
<br /> OPROVIDE WIRE AND CONDUIT AS REQUIRED FOR FACTORY PROVIDED/CONTRACTOR 4
<br /> 2 INSTALLED MOTORIZED DAMPER ASSOCIATED WITH THE ROOFTOP UNIT.
<br /> 5
<br /> O3 CONNECT CIRCUIT TO FACTORY PROVIDED/CONTRACTOR INSTALLED DISCONNECT. 6
<br /> INTERLOCK CONTROLS WITH RTU-1 CONTROLS. PROVIDE BOX AND CONDUIT AS REQUIRED. 7
<br /> CONDUIT SHALL BE RUN TO ROOF BETWEEN DUCT AND ROOF CURB. CONTRACTOR SHALL 8
<br /> NOT PROVIDE A SEPARATE ROOF PENETRATION.
<br /> O4 CONNECT CIRCUIT TO FACTORY PROVIDED/CONTRACTOR INSTALLED DISCONNECT SWITCH.
<br /> IF NAMEPLATE DOES NOT LIST AN HVAC BREAKER RATING, PROVIDE A FUSIBLE
<br /> DISCONNECT SWITCH WITH FUSES SIZED PER NAMEPLATE RATING. CONDUIT SHALL BE Sheet Title: r,A'C� R
<br /> RUN TO ROOF BETWEEN DUCT AND ROOF CURB. CONTRACTOR SHALL NOT PROVIDE A J, 00F
<br /> SEPARATE ROOF PENETRATION. POWER R
<br /> O MOUNTCONTRACTOR ID
<br /> MOUNTED ON PARAPETWI HWEATHERPROOF, ON
<br /> N 25' OF EACH RUUNIT. INTERRUPTING
<br /> SEAL ON BOTHINTERIOR A RECEPTACLE PLAN
<br /> EXTERIOR EDGE OF THE PARAPET. INSTALL SEAL SUCH THAT IT IS WATER TIGHT.
<br /> CONDUIT SHALL BE RUN TO ROOF BETWEEN DUCT AND ROOF CURB. CONTRACTOR SHALL Date: 12.07.2020
<br /> NOT PROVIDE A SEPARATE ROOF PENETRATION.
<br /> O CONNECT THE CONDENSER AND CONDENSER DISCONNECT TO THE OUT GOING CONDENSER Project Number: RAC19048.0
<br /> CONNECTION FROM THE ICE MACHINE WHICH IT SERVES. PROVIDE LIKE WIRE/CONDUIT AS
<br /> THAT WHICH IT FEEDS THE ICE MACHINE IT SERVES. Drawn By: _
<br /> SEAL THE PENETRATION TO THE ROOF SUCH TO DETERMINE A WATERPROOF SEAL.
<br /> Sheet Number:
<br /> E2 . 3
<br /> Q
<br /> m
<br /> z:)
<br /> COPYRIGHT 2020, ROBISON ENGINEERING, INC.
<br /> JESCALONA F:\_PEDRO+MCCRACKEN\_RAISING CANES\424-1551 LODI, CA R00576\DWG\E23P4.DWG 12-21-2020 08:42
<br />
|