Laserfiche WebLink
I o <br /> 0 F I I <br /> C <br /> ED <br /> to cV m <br /> 0 0 <br /> �1 °' ti ctio <br /> w o ti <br /> IIW O c� <br /> c <br /> l <br /> C.7 N_ o <br /> C O r <br /> V = g a' <br /> cfl <br /> V) v) r-_ <br /> - m N <br /> C=) <br /> rn <br /> 00 . . <br /> cfl <br /> FF:::::: IL <br /> 2 <br /> FREEZER COMPRESSOR <br /> 5.04KVA,208V3P3W F-4 <br /> Store: <br /> A-22,24,26 A-25 1/4HP,120V1 P2W 3 <br /> KETTLEMAIV & L. SACRMEIVT�J <br /> LORI, CA 95242 <br /> A-54,56,58 A-39,41,43 <br /> 3/4"C,3#10,#10N,#1013 #10 Restaurant #RC576 <br /> P CU-2 WP P <br /> '� 4 04KVA,208V3P3W P4E-HV-M SCHEME A <br /> 30/3/NP � A-33,35,37 <br /> A-48,50,52 CU-3 Professional of Record: NAME <br /> A-28,30,32 #10 7.71 KVA,208V3P4W <br /> F-3 A-45,47,49 WIP + — U-4 <br /> Wp 1.5HP,208V3P3W #10 5 <br /> 30/3/NP WP O .04KVA, 08V3P,3 !! <br /> B-48 <br /> WID <br /> WP '<' GFCI 1 <br /> 00- R COMPRESSOR 2HP,208V3P3W <br /> .04KV , 08V3P3W CU-1 A-10,12,14 WP A-42,44,46 ROBISON <br /> 4.04KVA,208V3P3W #10 <br /> 401-1 1 MUq-1 A-7,9,11 ENGINEERING, INC <br /> 5 1.5HP,208V3P3W P <br /> /4"C,3#4,#4N 1013 194LLYNNWOOD,WA 98036 02 <br /> _ B-48 <br /> 206.364-3343 TEL <br /> \� h GFCI #10 A-16,18,20 ❑ <br /> F-1 REi# 424- 551 <br /> 2HP,208V3P3W W �� RTU—1 <br /> I \ I A-27,29,31 � I 2 4 I <br /> \ z � F-2 3HP,15KV 08V3P4W <br /> \ �I W 1 HP,208V3P3W 5P <br /> 5 GFCI <br /> RTU-2 �� PIC[ <br /> j�I OFESS/ <br /> 4 2 5HP 19.7KVA 208V3P4W z B-4 QR ONS <br /> L WP <br /> C, Z <br /> A-13,15,17 No. E-23059 m <br /> 1-1/4"C,3#2,#2N,#8G <br /> OWP 30/2 6 WP <br /> 30 2 WP 0 <br /> O O / g 6 q SEC <br /> 30/2 <br /> TF o CAS\Fpm <br /> iz/zz/zo <br /> Prototype: P4E- HV 2020 - 2.0 RELEASE <br /> Prototype Issue Date: 7.14.2020 <br /> 77 <br /> 9 Design Bulletin Updates: -- <br /> 10 � <br /> � 0 10 Date Issued: Bulletin Number: <br /> POWER ROOF PLAN <br /> 1ST BLDG. SUBMITTAL <br /> O 0 \D (D (D H.1 (D K.1 K.3 <br /> 2 KEYNOTES <br /> REVISIONS: <br /> 12.22.2020 1st Building Submittal <br /> OPROVIDE 3#12, 1#12G, 1/2"C FROM SUPPLY FAN TERMINAL BLOCK ON HOOD PRE—WIRED 1 <br /> CONTROL CABINET TO MAKE—UP AIR PACKAGE ON ROOF. 2 <br /> OPROVIDE WIRE AND CONDUIT AS REQUIRED FOR FACTORY PROVIDED/CONTRACTOR 4 <br /> 2 INSTALLED MOTORIZED DAMPER ASSOCIATED WITH THE ROOFTOP UNIT. <br /> 5 <br /> O3 CONNECT CIRCUIT TO FACTORY PROVIDED/CONTRACTOR INSTALLED DISCONNECT. 6 <br /> INTERLOCK CONTROLS WITH RTU-1 CONTROLS. PROVIDE BOX AND CONDUIT AS REQUIRED. 7 <br /> CONDUIT SHALL BE RUN TO ROOF BETWEEN DUCT AND ROOF CURB. CONTRACTOR SHALL 8 <br /> NOT PROVIDE A SEPARATE ROOF PENETRATION. <br /> O4 CONNECT CIRCUIT TO FACTORY PROVIDED/CONTRACTOR INSTALLED DISCONNECT SWITCH. <br /> IF NAMEPLATE DOES NOT LIST AN HVAC BREAKER RATING, PROVIDE A FUSIBLE <br /> DISCONNECT SWITCH WITH FUSES SIZED PER NAMEPLATE RATING. CONDUIT SHALL BE Sheet Title: r,A'C� R <br /> RUN TO ROOF BETWEEN DUCT AND ROOF CURB. CONTRACTOR SHALL NOT PROVIDE A J, 00F <br /> SEPARATE ROOF PENETRATION. POWER R <br /> O MOUNTCONTRACTOR ID <br /> MOUNTED ON PARAPETWI HWEATHERPROOF, ON <br /> N 25' OF EACH RUUNIT. INTERRUPTING <br /> SEAL ON BOTHINTERIOR A RECEPTACLE PLAN <br /> EXTERIOR EDGE OF THE PARAPET. INSTALL SEAL SUCH THAT IT IS WATER TIGHT. <br /> CONDUIT SHALL BE RUN TO ROOF BETWEEN DUCT AND ROOF CURB. CONTRACTOR SHALL Date: 12.07.2020 <br /> NOT PROVIDE A SEPARATE ROOF PENETRATION. <br /> O CONNECT THE CONDENSER AND CONDENSER DISCONNECT TO THE OUT GOING CONDENSER Project Number: RAC19048.0 <br /> CONNECTION FROM THE ICE MACHINE WHICH IT SERVES. PROVIDE LIKE WIRE/CONDUIT AS <br /> THAT WHICH IT FEEDS THE ICE MACHINE IT SERVES. Drawn By: _ <br /> SEAL THE PENETRATION TO THE ROOF SUCH TO DETERMINE A WATERPROOF SEAL. <br /> Sheet Number: <br /> E2 . 3 <br /> Q <br /> m <br /> z:) <br /> COPYRIGHT 2020, ROBISON ENGINEERING, INC. <br /> JESCALONA F:\_PEDRO+MCCRACKEN\_RAISING CANES\424-1551 LODI, CA R00576\DWG\E23P4.DWG 12-21-2020 08:42 <br />