Laserfiche WebLink
6 <br /> Z <br /> 20- 23 <br /> I <br /> Vicinity Map Owner <br /> Raising Cane's USA, L.L.C. <br /> ISafeway® v Marshalls 6800 Bishop Rd. <br /> / Plano, TX 75024 <br /> Target (972) 769-3348 K I E S E L - D E S I G N <br /> Instacart Delivery kroberts@raisingcanes.com <br /> Kiesel Landscape <br /> EI Maguey Mexican Grill Chipotle Mexican Grill <br /> © <br /> er19 Chase Bank Landscape Architect Architecture, Inc. <br /> Jack Kiesel 422 E Main Street <br /> Applebee's_Grill+Bar Kiesel Design Ventura, CA 93001 <br /> Farmer Boys 422 E Main Street <br /> Free Delivery (p) 805.947.0730 <br /> on 1 st Order Ventura, CA 93001 <br /> tel: 805.947.0730 Jack@kieseldesign.com <br /> email: jack@kieseldesign.com CL# 5206 <br /> CA License #: 5206 <br /> ®Food 4 Less <br /> Wild Wings V Fountains Apartments <br /> ' McDonald's Raising Cane's Lodi <br /> Walmart Supercenter 19 Civil Engineer RC #576 <br /> HICKEN Fit4GE EOlive Ave Kimley-Horn and Associates Inc <br /> 765 The City Dr. Suite 200 2380 W Kettleman Ln <br /> Orange, CA 92868 Lodi, CA 95242 <br /> (714) 939-1030 <br /> Scale = 1 :5000 0 <br /> Revisions: <br /> # DATE NAME <br /> General Notes Sheet Index 12.21 .20 1st Building Submittal <br /> Raising Cane's - Store #576 1 . The Landscape Contractor (Contractor) shall notify Underground Service <br /> 2380 W Kettleman Ln, Lodi, CA 95242 Alert (USA) before start of construction at (800) 422-4133. LANDSCAPE <br /> 2. The California Public Utilities Code mandates that the gas company <br /> (Southern o st construction. <br /> Gas) is notified a minimum of two days prior to the start L0.0 Cover Sheet <br /> TOTAL LANDSCAPE AREA: 6,355 s.f. o <br /> 1-1.1 Materials Plan <br /> PROJECT TYPE : Commercial <br /> 3. Site conditions may change due to unforeseen circumstances that occur as 1-1.2 Patio Finish & Sawcut Plan <br /> WATERSUPPLY: Potable projects undergo construction. If a proposed built element, grade change or <br /> landscape feature seems problematic and it is evident that contruction may L2.1 Irrigation Plan <br /> not proceed per the approved drawings, the Landscape Contractor shall call 1-2.2 Irrigation Notes <br /> the Landscape Architect to coordinate any issues before continuing with site 1-2.3 Irrigation Details <br /> work. <br /> 1-2.4 Irrigation Details �P�DSCAPE <br /> 4. Contractor shall confirm all field dimensions and conditions prior to the <br /> 1-2.5 Irrigation Details �w� Diesel <br /> start of work. Any discrepancies with plans shall be reported to the Owner 15. <br /> and Landscape Architect. 1-2.6 Irrigation Specifications <br /> a <br /> 1111 <br /> 1-2.7 Irrigation Specifications %nztUre <br /> 5. Contractor shall make modifications to material and/or method of 12.31.22 <br /> 1-3.1 Planting Plan 1 z 21 20 <br /> installation as required by local code and Conditions of Approval, but shall s 5ae <br /> notify the Owner and Landscape Architect of such changes prior to 1-3.2 Shade Plan ��T <br /> ° <br /> construction. �of cALi� <br /> 1-3.3 Planting Details <br /> 1-3.4 Planting Specifications <br /> 1-3.5 Planting Specifications <br /> L3.6 Maintenance Specifications Type: 1st Building Submittal <br /> Best Management Practices for Construction 1-3.7 Soils Report <br /> Activities: <br /> 1. Stockpiles of earth, sand and other construction related materials must be Initial Setup Date: <br /> protected from being transported from the site by the forces of wind or water. June 30, 2020 <br /> This includes sand for stucco, drywall demolition debris, drywall "mud" <br /> packaging, etc <br /> 2. Fuels, oils, solvents and other toxic materials must be stored in accordance Drawn By: <br /> with their listing and are not to contaminate the soil and surface waters. All # NAME DATE <br /> approved storage containers are to be protected from the weather. Spills may Y. Zhang 12/2020 <br /> not be washed into the drainage system. <br /> 3. Non-stormwater runoff from equipment and vehicle washing and any other <br /> ©2018 Kiesel Landscape Architecture Inc:The design ideas <br /> activity shall be contained at the site. and plans represented by these documents are the property <br /> of Kiesel Design.Use or copy is permitted by contract only. <br /> The use or revisions of these ideas or plans is prohibited <br /> without the written permission of Kiesel Design. <br /> 4. Excess or waste concrete may not be washed into the public way or any <br /> other drainage system. Provisions must be made to retain concrete wastes on <br /> site until they can be disposed of as a solid waste. <br /> 5. Trash and construction related solid wastes must be deposited into a Title: <br /> covered receptacle to prevent contamination of rainwater and dispersal by <br /> wind. <br /> Cover Sheet <br /> 6. Sediments and other material may not be tracked from the site by vehicle <br /> traffic. The construction entrance roadways must be stabilized so as to inhibit <br /> sediments from being deposited into the public way. Accidental depositions <br /> must be swept up immediately and may not be washed down by rain or other <br /> means. <br /> Sheet Number: <br /> LOmO <br />