<br /> IRRIGATION SPECIFICATIONS 3. Equipment or materials installed or furnished without prior approval of the 5. The chart shall be a blackline or blueline ozalid print and a different color shall
<br /> Landscape Architect may be rejected and the Contractor required to remove be used to indicate the area of coverage for each control valve station.
<br /> PART 1 - GENERAL CONDITIONS such materials from the site at his own expense. 6. When completed and approved, the chart shall be sealed by a plastic laminating
<br /> 1.1 Description: 4. Approval of any item, alternate, or substitute indicated only that the process. the plastic laminating sheets shall be a minimum of 10 mil. thickness each.
<br /> product apparently the requirements of the drawings and specifications
<br /> A. Work Included: Provide all labor, materials, transportation, and services necessary to on the basis of the information or samples submitted. D. Operation and Maintenance
<br /> furnish and install irrigation systems as shown on the drawings and described herein.
<br /> 5. Manufacturer's warranties shall not relieve the Contractor of his liability 1. Prepare and deliver to the Landscape Architect within ten calendar days prior to
<br /> 1.2 Quality Assurance: under the guarantee. Such warranties shall only supplement the guarantee. completion of construction, two hard cover binders with three rings each containing
<br /> A. Manufacturer's Directions: Manufacturer's directions and detailed drawings shall be B. Record Drawings: ,
<br /> followed in all cases where the manufacturers of articles used in this contract fthe following information:
<br /> urnish a. Index sheets stating Contractors address and telephone number, list of equipment
<br /> directions covering points not shown in the drawings and specifications. 1. The Contractor shall provide and keep up to date a complete "record" set of with names and addresses of local manufacturer's representatives.
<br /> blue line ozalid prints which shall be corrected daily and show every change b. Catalog and parts sheets on every material and equipment installed K I E S E L • D E S I G N
<br /> B. Ordinances and Regulations: All local, municipal and state laws, and rules and from the original drawings and specifications and the exact locations, sizes, and under this contract.
<br /> regulations governing or relating to any portion of this work are hereby incorporated kinds of equipment. These drawings shall also serve as work progress sheets and c. Guarantee statement (Section 1.05).
<br /> into and made a part of these specifications and their provisions shall be carried shall be the basis for measurement and payment for work completed. This set d. Complete operating and maintenance instructions on all major pieces of equipment.
<br /> out by the Contractor. Anything contained in these specifications shall not be of drawings shall be kept on the site and shall be used only as a record set. Kiesel Landscape
<br /> construed to conflict with any of the above rules and regulations or requirements of 2. In addition to the above mentioned maintenance manual, provide the Owner's
<br /> the same. However, when these specifications and drawings call for or describe 2. The Contractor shall make neat and legible annotations thereon daily as the work maintenance personnel with instructions for major equipment and show evidence in Architecture, Inc.
<br /> materials, workmanship, or construction of a better quality, higher standard, or larger proceeds, showing the work as actually installed. These drawings shall be writing to the Landscape Architect at the conclusion of the project that this service has
<br /> size than is required by the above rules and regulations, the provisions of these available at all times for inspection and shall be kept in a location designated by been rendered.
<br /> specifications and drawings shall take precedence. the Landscape Architect.
<br /> 422 E Main Street
<br /> C. Explanation of Drawings: 3. Before the date of the final inspection, the Contractor shall transfer all information E. Equipment to be Furnished: Ventura, CA 93001
<br /> 1. Due to the scale of the drawings, it is not possible to indicate all offsets, from the record prints to a sepia mylar or mylar procured from the Landscape 1. Supply as part of this contract the following tools:
<br /> g p Architect. All work shall be neat, drawn in waterproof ink by a technical ink pen (p) 805.947.0730
<br /> fittings, sleeves, etc., which may be required. The Contractor shall carefully designed specifically for use on mylar material. Work completed in felt tip pen or
<br /> investigate the structural and finished conditions affecting all of his work and ball point pen will be rejected because of the non-permanent nature el both a. Two sets of special tools required for removing, disassembling, and Jack@kieseldesign.com
<br /> plan his work accordingly, furnishing such fittings, etc. as may be required to devices. All work shall be subject to approval by the Landscape Architect. adjusting each type of sprinkler and valve installed under this contract. CL# 5206
<br /> meet such conditions. Drawings are generally diagrammatic and indicative of
<br /> the work to be installed. The work shall be installed in such a manner as to 4. The Contractor shall dimension from two permanent points of reference the b. Two five-foot valve keys for operation of gate valves (as required).
<br /> avoid conflicts between irrigation systems, planting, and architectural features. location of the following items:
<br /> c. Two keys for each automatic controller or enclosure.
<br /> 2. The word Landscape Architect as used herein shall refer to the Owner's a. Connection to existing water lines d. Six quick coupler keys and matching hose swivels for each type of
<br /> authorized representative. b. Connections to existing electrical power quick coupling valve installed.
<br /> 3. All work called for on the drawings by notes or details shall be furnished and c. Gate valves d. Routing of pressure main line pipe 2. The above mentioned equipment shall be turned over to the Owner at the conclusion Raising Cane's Lodi
<br /> installed whether or not specifically mentioned in the specifications. e. Sprinkler control valves of the project. Before final inspection can occur, evidence that the Owner has received RC #576
<br /> 4. The Contractor shall not willfully install the irrigation system as shown on the f. Routing of control and common wire material must be shown to the Landscape Architect.
<br /> drawings when it is obvious in the field that obstructions, grade differences, or g. Quick coupling valves
<br /> discrepancies in area dimensions exist that might not have been considered in h. Other related equipment as directed by the Landscape Architect. 1.4 Product Protection, Storage, and Handling: 2380 W Kettleman Ln
<br /> the irrigation design. Such obstructions s differences should be brought c the 5. On or before the date of the final inspection, the Contractor shall deliver the A. Handling of PVC Pipe and Fittings: The Contractor is cautioned to exercise care in Lodi, CA 95242
<br /> attention of the Owner's authorized representative. In the event this notification is p g p g
<br /> not performed, the irrigation contractor shall assume full responsibility for any corrected and completed mylars to the Landscape Architect. Delivery of the handling, loading, unloading, and storing of PVC pipe and fittings. All PVC pipe shall be
<br /> revisions necessary. mylars will not relieve the Contractor of the responsibility of furnishing required transported in a vehicle which allows the length of pipe to lie flat so as not to subject it to
<br /> information that may be omitted from the prints he compiled at the site. undue bending or concentrated external load at anyoint. Any section of pipe that.has been
<br /> 1.3 Submittals: C. Controller Charts: dented or damaged will be discarded, and if installed,shall be replaced with new piping.
<br /> A. Material List: 1. Record drawings shall be approved by the Landscape Architect before controller 1.5 Analysis of samples and tests: None.
<br /> 1. The Contractor shall furnish the articles, equipment, materials, or processes charts are prepared. 1.6 Guarantee: Revisions:
<br /> specified by name in the drawings and specifications. No substitution will be 2. Provide one controller chart for each controller supplied.
<br /> allowed without prior written approval by the Landscape Architect. A. The guarantee for the sprinkler irrigation system shall be made in accordance with the # DATE NAME
<br /> 3. The chart shall show the area controlled by each automatic controller and shall be attached form. The general conditions and supplementary conditions of these
<br /> 2. Complete material list shall be submitted prior to performing any work. Material sized as designated by each automatic controller or as designated by the Owner's specifications shall be filed with the Owner or his representative prior to acceptance of the 12.21 .20 1st Building Submittal
<br /> list shall include the manufacturer, model number, and description of all authorized representative. irrigation system.
<br /> materials and equipment to be used. Copies of catalog information shall not be 4. The chart is to be a reduced drawing of the actual record drawings. However, in
<br /> substituted for the materials list, and will be rejected as unacceptable. the event the controller sequence is not legible when the drawing is reduced, it B. A copy of the guarantee form shall be included in the operations and maintenance
<br /> shall be readable when the controller chart is completed. manual (Section 1.03, D).
<br /> C. The guarantee form shall be re-typed onto the Contractor's letterhead and contain the
<br /> following information:
<br /> GUARANTEE FOR SPRINKLER IRRIGATION SYSTEM H. Automatic Controller:
<br /> We hereby guarantee that the sprinkler system we have furnished and installed is free from C. Gate Valve:
<br /> defects in materials and workmanship, and the work has been completed in accordance with 1. Automatic controller shall be of size and type shown on the drawings.
<br /> p 1. Gate valves 3-inches and smaller shall be 125-Ib. SWP bronze gate valve with screw-in
<br /> the drawings and specifications. We gree to repair or replace any defects in material or bonnet non-risingstem and solid wedge disc have threaded ends, and beequipped with
<br /> workmanship which may develop during the period of one year from the date of acceptance 2. Final location of automatic controller shall be approved by the Owners authorized
<br /> and also to repair or replace any damage resulting from the repairing or replacing of such bronze wheel hanle. grepresentative prior to installation. tip,�DScaPE�
<br /> defects at no additional cost to the Owner. We shall make repairs or replacements within a2. Gate valves 3-inches and smaller shall be similar to those manufactured by Nibco or 3. Unless otherwise noted on the plans the 120-volt electrical power to the automatic diesel
<br /> reasonable time after receipt of written notice from the Owner. In the event of our failure to approved equal. �� °6'
<br /> pp q controller location shall be furnished by others. The final hook-up of the automatic w �
<br /> make such repairs or replacements within a reasonable time after receipt of written notice u
<br /> from the Owner, we authorize the Owner to proceed to have said repairs or replacements controller to the 120-volt power source shall be the responsibility of the irrigation a llq
<br /> made at our expense and we will a the costs and charges therefore upon demand. 3. All gate valves shall be installed per installation detail. contractor. s.31.
<br /> p pay g p iz.si.zz
<br /> (The above statement is to be followed by the project name, location, signature, address, D. Quick Coupling Valves: Quick coupling valves shall have a brass two-piece body I. Electric Control Valves: F1'.21.2
<br /> p g , p p Y iz.zi.zo
<br /> and telephone number of Irrigation Contractor, in addition to the date of acceptance). designed for working pressure of 150 PSI operable with quick coupler key. 1. Electric control valves shall be of the size and type shown on the drawings. s� �e
<br /> PART 2 - MATERIALS Key size and type shall be as shown on plans. 2. Unless otherwise noted on plan or construction details, all electric control valves shall have ���of CALiF0¢�
<br /> E. Backflow Preventer Unit: a manual flow adjustment.
<br /> 2.1 General: Use only new materials of brands and types noted on the drawings, 3. Provide and install one control valve box for each electric control valve.
<br /> specified herein, or approved equals. 1. Backflow prevention units shall be of size and type indicated on the irrigation
<br /> drawings. Install the backflow prevention units in accordance with the irrigation J. Control Valve Boxes:
<br /> A. PVC pressure Main Line Pipe and Fittings: construction details. 1. Use 10" x 10 1/4" round box for all gate valves, Carson Industries 910-12B with green Type: 1st Building Submittal
<br /> 1. Pressure main line piping for sizes 2-inches and larger shall be PVC Class 315. 2. Wye strainers at backflow prevention units shall have a bronzed screwed body with bolt down cover or approved equal. Extension sleeve shall be PVC-6-inch minimum size.
<br /> 100 mesh monel screen and shall be similar to Bailey 100A or approved equal. 2. Use 9-1/2" x 16" x 11" rectangular box for all electric control valves, Carson
<br /> 2. Pipe shall be made from an NSF approved Type 1, Grade 1, PVC compound conforming Industries 1419-12B with green bolt down cover or approved equal.
<br /> to ASTM resin specification D1784. All pipe must meet requirements as set forth in Federal F. Check Valves:
<br /> Specification PS-22-70 (Solvent Weld Pipe) with an appropriate standard dimension (S.D.R.) K. Sprinkler Heads:
<br /> 1. Swing check valves 2-inches and smaller shall be 200 lbs. WOG bronze bronze 1. All sprinkler heads shall be of the size, type, and deliver the same rate of precipitation Initial Setup Date:
<br /> 3. Pressure main line piping for sizes 1 and 1/2 inch and smaller shall be PVC Schedule 40 construction and replaceable composition, neoprene or rubber disc, and shall meet or with the diameter (or radius) of spray, pressure, and discharge in G.P.M. as shown June 30, 2020
<br /> with solvent welded joints. exceed Federal Specification WW-V-51 D, Class A, Type IV. on the drawings and/or specified in these special provisions.
<br /> 4. Pipe shall be made from NSF approved Type 1, Grade 1, PVC compound conforming to 2. Anti-drain valves shall be of heavy-duty virgin PVC construction with F.I.P. thread inlet 2. All spray type sprinklers shall have a screw adjustment.
<br /> ASTM resin specification D1785. All pipe must meet requirements as set forth in and outlet. Internal parts shall be stainless steel with Buna-N seals. Valve shall be
<br /> Federal Specification PS-21-70 (Solvent-Weld Pipe). field adjustable against drawout from 3 to 40 feet of head. Anti-drain valve shall be 3. Riser/swing joint assemblies shall be fabricated in accordance with the irrigation Drawn B
<br /> similar to the King Bros. "CV" series or approved equal. construction details shown on the drawings. Y:
<br /> 5. PVC solvent-weld fittings shall be Schedule 40, 1-2, 11-1 NSF approved conforming to 4. Riser nipples for all sprinkler heads shall be the same size as the riser opening in the # NAME DATE
<br /> ASTM test procedure D2466. G. Control Wiring: sprinkler body. T. Slininger 12/2020
<br /> 6. Solvent cement and primer for PVC solvent-weld pipe and fittings shall be of the type and 1. Connections between the automatic controllers and the electric control valves shall be
<br /> installation methods prescribed by the manufacturer. PART 3 - EXECUTION
<br /> made with direct burial copper wire AWG-U.F. 600 volt. Pilot wires sharing the same
<br /> 7. All PVC pipe must bear the following markings: automatic controller shall be the same color. Common wire shall be white in color with a 3.1 Inspection:
<br /> ©2018 Kiesel Landscape Architecture Inc:The design ideas
<br /> stripe to match the pilot wires with which it is circuited on the same controller. Provide and plans represented by these documents are the property
<br /> a. Manufacturer's name on
<br /> A. Site Conditions: of Kiesel Design Use or copy is permitted by contract only.
<br /> different colors for each controller installed on the same project. Install wire in The use or revisions of these ideas or plans is prohibited
<br /> b. Nominal pipe size accordance with valve manufacturer's specifications and wire chart. In no case shall 1. All scaled dimensions are approximate. The Contractor shall check and verifyall site without the written permission of Kiesel Design.
<br /> re sless an dimensions and receive Landscape c. Schedule or class wire be lthan #14. d
<br /> d. Pressure rating in PSI Architect's approval prior to proceeding with work
<br /> e. NSF (National Sanitation Foundation) approval 2. Wiring shall occupy the same trench and shall be installed along the same route as under this section.
<br /> f. Date of extrusion pressure supply or lateral lines wherever possible. 2. Exercise extreme care in excavating and working near existing utilities. Contractor shall
<br /> 8. All fittings shall bear the manufacturer's name or trademark, material designation, size, be responsible for damages to utilities which are caused by his operations or neglect. Title:
<br /> applicable I.P.S. schedule and NSF seal of approval. 3. Where more than one wire is placed in a trench, the wiring shall be taped together at Check existing utilities drawings or call utilities companies for existing utility locations.
<br /> intervals of ten feet.
<br /> B. PVC Non-Pressure Lateral Line Piping: 3. Coordinate installation of sprinkler irrigation materials, including pipe so there shall be
<br /> 4. An expansion curl shall be provided at each wire connection. Expansion curl shall be of no interference with utilities or other construction or difficulty in planting trees, shrubs, Irrigation
<br /> 1. Non-pressure buried lateral line piping shall be PVC class 200 with solvent-weld joints. sufficient length at each splice connection at each electric control valve so that in case of and groundcovers.
<br /> repair, the valve bonnet may be brought to the surface without disconnection of the
<br /> 2. Pipe shall be made from NSF approved, Type 1, Grade II, PVC compound conforming to control wires. Control wires shall be laid loosely in trench without stress or stretching of 4. The Contractor shall carefully check all grades to satisfy himself that he may safely Specifications
<br /> ASTM resin specification D1784. All pipe must meet requirements set forth in Federal control wire conductors. proceed before starting work on the sprinkler irrigation system.
<br /> Specifications PS-22-70 with an appropriate standard dimension ratio.
<br /> 5. All splices shall be made with Rainbird ST-03UL Snap-Tite wire connector with PT/S5 3.2 Preparation:
<br /> 3. Except as noted in paragraphs 1 of 2 of Section 2.01 C, all requirements for non-pressure
<br /> lateral line pipe and fittings shall be the same as for solvent-weld pressure main line sealer or approved equal. Use one wire connector per wire splice.
<br /> p�p 9 p A. Physical Layout: Sheet Number:
<br /> pipe and fittings as set forth in Section 2.01 B of these specifications.
<br /> 6. Field splices between the automatic controller and electric control valves will not be 1. Prior to installation, the Contractor shall stake out all pressure supply lines, routing,
<br /> permitted without prior approval of the Landscape Architect. and location of sprinkler heads.
<br /> 2. All layout shall be approved by Landscape Architect prior to installation.