My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2350
>
1600 - Food Program
>
PR0547521
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2022 4:29:19 PM
Creation date
2/28/2022 4:10:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0547521
PE
1625
FACILITY_ID
FA0027024
FACILITY_NAME
RAISING CANE'S #0576
STREET_NUMBER
2350
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2350 W KETTLEMAN LN
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H 8H.2 80 <br /> 08@(B <br /> 11 <br /> 8.21 <br /> ■.�' o_ <br /> OO W N M <br /> x <br /> � � <br /> [-- <br /> AIF F .x CD r- <br /> 0 o rn <br /> !.' O M <br /> 1■IO <br /> x C:) <br /> T <br /> � M <br /> 10 L7 C <br /> Lti <br /> 19 8.21 � m N <br /> O ti <br /> O 0-)LU 0 <br /> LU c� � <br /> v � <br /> 9'-10" 11'-1" 36'-11 L <br /> �? ±15-8" <br /> T.O.S. � O O 3I <br /> 16'-7" 19'-10" k8V C7 1 1 <br /> T.O.P. T.O.P. <br /> SI,1 T.O.S. Store: <br /> 0 F.O.S. '; - 4 T o P. W KETTLEMAN & LOWER SCRAMENTO <br /> - LODI, CA 95242 <br /> - X i 18 - - - F.O.S. O <br /> 18 <br /> LU <br /> - - - - - 6.75 : 12 6.75 : 12 - - - - - - - - - <br /> Restaurant #RC576 <br /> 0 16 r P4E-HV-M SCHEME A <br /> L <br /> Professional of Record: JEFF LIEDERMAN <br /> III 20 <br /> 35-8" <br /> 8 III <br /> 6 <br /> N • ROOF AREA= 2, S.F. O A8.2� 2 <br /> � 995 I (E>, <br /> 7 INTAKE - <br /> ° E I III DESIGN <br /> C26 FAA <br /> � • FUTURE SOLAR-READY A # = 6 S. . <br /> II II k-0 <br /> \O ZONE REQUIRED=2,995 X 0.15=449.25 S.F. i 0 X INTAKE <br /> Architectural <br /> N • FUTURE SOLAR-READY ZONE I 8 8 � I III Solutions Group <br /> o PROVIDED=450 S.F. OJ n- 16'-7" <br /> "' I T.O.P. 1 101 Central Expressway South <br /> • SOLAR-READY AREA SHALL COMPLY I O �� I Suite 100 <br /> CALIFORNIA ENERGY CODE SECTION i 17 3 Allen, TX 75013 <br /> SLC 7E 1 110.10. / CONTACT: EVERETT FIELDS <br /> N j (469) 619-1164 <br /> P-A 11114 `0114 1014 ell • SOLAR-READY AREA CAN BE RAISED TO I 15 4 8 I III EFIELDS@PMDGINC.COM <br /> u� COMPLY WITH FREE ZONE OF I I <br /> 8 <br /> 6 OBSTRUCTIONS REQUIREMENT I 15 <br /> C22 � I 4'-1 1" <br /> 16 3 <br /> 3 7- <br /> 8 INTAKE - - - - <br /> SOLAR-READY ZONE 24 C? Is,R C H <br /> AREA #1 =281 S.F. I 00 <br /> 04 0 T <br /> 71 ❑ 4 <br /> % II I I\ I I \/ I 8 - o o <br /> 15 LL <br /> I 4QQ �EFFR�� raN <br /> (D F.O.S. 14 I I /\ I �I IO 11 29534 <br /> AX I \ I 1 15 � � Q <br /> L - - - - - - - - - <br /> *11000 <br /> L9 3yp- <br /> 0 18 14 L � IL - � g 8 � T �6NEWA` <br /> O 8 4 I /\ I 2 SIM OF <br /> 2 <br /> lL � 3 <br /> 15 15 8.40 <br /> C;1 12 <br /> 130 0 <br /> 005 17 5 17 5 20 <br /> 11 16 17 N 6 Prototype : P4E- HV 2020 -2.0 RELEASE <br /> III 8 O <br /> SLOPED <br /> 21 23 APPROX. (28) 8 Prototype Issue Date: 7.14.2020 <br /> `O I Design Bulletin Updates: <br /> 11 <br /> 1/4" PER FT. F.O.S. <br /> 16'-7" 14 - r.; - - - I 7 Date Issued: Bulletin Number: <br /> 0 10 SLOPED SLOPED 5 - <br /> 8 <br /> F.O.S. 8 APPROX. APPROX. 8.4 10 SLOPED <br /> c� <br /> 1 <br /> 0 <br /> O = -6.i5 . 12 6.75 : 12 <br /> 1/4" PER FT. 1/4" PER FT. o0 �l/4" PER FT. <br /> II1ST BLDG. SUBMITTAL <br /> ±14'-11" o � _ .. F.O. <br /> T.O.S. O <br /> 10 F.O.S. _ = N 10 _ <br /> 16'-7" - 10 <br /> 11 18 � T.O.P. 18 9 18 16'-7`� <br /> O 20 9 N T.O.P. <br /> O <br /> 16'-7" 18 11 m 7'_7„ 0.. 2'-0" 3'-9" O 1 1 <br /> T.O.P. 18'-4" 19'-10" rn <br /> v? v? �? 6 2 T.O.P. <br /> 6 b b <br /> O O T.O.P. ° ° 8.4 8.4 ° 20 O 8.4 O O 12 <br /> 8'-0" 8'-7" 7-1" 35-10" 0 15'-7" 164" 11-9 REVISIONS: <br /> 12 12.22.2020 1st Building Submittal <br /> 3 SIM ROOF PLAN 1 <br /> AOB OC T <br /> OG S 8'4 J 1/4"= Y-0" K.1 K.3 2 <br /> 11/A8.31 <br /> 3 <br /> 4 <br /> 5 <br /> ROOF PLAN KEYNOTES O SYMBOL LEGEND ROOF DRAINAGE NOTES GENERAL NOTES 6 <br /> 8 <br /> 1. ROOFTOP UNIT 1. RE: MECHANICAL DWGS.. 8. CRICKET (TAPERED INSULATION) SLOPE 1/2":12 AS INSTALLATION OF COVE LIGHTING, WHERE OCCURS; WINDOW DESIGNATION 1. THE ROOF'S DRAINAGE SYSTEM IS DESIGNED TO COMPLY WITH 1. THE ROOFING SYSTEM (FIRESTONE ULTRA PLY TPO) SHALL BE A 45 MIL, 7. CONTRACTOR TO VERIFY WEIGHT & LOADING OF WOOD MILLWORK ITEMS <br /> REQUIRED TO FACILITATE POSITIVE DRAINAGE TO PROVIDED & INSTALLED BY OWNER. RE: EXTERIOR O SEE SHEET A2.20 THE CALIFORNIA BUILDING CODE & CHAPTER 11 OF THE ATTACHMENT OF SINGLE PLY TPO ROOFING MEMBRANE PER ESR-2831 SUSPENDED FROM BOTTOM CHORD IN DINING ROOM & REQUIREMENTS OF <br /> 2. TPO SINGLE PLY ROOFING MEMBRANE OVER RIGID SCUPPERS ELEV'S. CALIFORNIA PLUMBING CODE, OR ANY OTHER LARGER REPORT;TABLE 4, SYSTEM NO. W1, INSTALLED OVER RIGID INSULATION PER ALL ROOF TOP EQUIPMENT WITH DATA SHEETS PRIOR TO TRUSS DESIGN. <br /> INSUL. & ROOF SHEATHING, RE:STRUCTURAL PLANS & QUANTITY OF RAINFALL AS SPECIFIED BY CODE OFFICIAL. TABLE 2,SYSTEM NO. 2 (CLASS "A" ROOFING), POLYISOCYANURATE <br /> SEE GENERAL NOTE #9 9. PRIMARY ROOF DRAIN. COORDINATE W/CIVIL DWGS 19. PATIO METAL ROOF DECK. RE:STRUCT. DWGS. 101 DOOR DESIGNATION REFER TO THE TABLES IN SECTION 1 106 OF THE CALIFORNIA INSULATION BOARD (4"THK. MAX.) WITH STRONG WHITE FIBROUS GLASS 8. CONTRACTOR TO VERIFY WEIGHT& LOADING OF WOOD MILLWORK ITEMS Sheet Title: <br /> FOR SITE DRAINAGE. RE: 7/A8.40. SEE SHEET A2.10 PLUMBING CODES FOR MINIMUM SQUARE FOOTAGE FACER (R-FACTOR 23 MIN.) INCLUDING ALL RELATED FLASHING. 10-YEAR SUSPENDED FROM BOTTOM CHORD IN DINING ROOM. <br /> 3. MAKE-UP AIR UNIT, INCLUDING CLEARANCE FOR 20. PREFABRICATED METAL AWNING (BY OTHERS AGI). RE: ALLOWABLE FOR DRAINAGE DEVICES, HORIZONTAL FOR WARRANTY.TAPERED INSULATION AS REQUIRED TO FACILITATE DRAINAGE <br /> POSSIBLE FUTURE CONDITIONED MAU. PROVIDE INTAKE 10. OVERFLOW THRU WALL SCUPPER. RE: 7/A8.40. RCP FOR DIMENSION & DET. 2, 5 & 12/A8.21 EXTERIOR ELEV. MARK SCUPPERS &VERTICAL FOR LEADERS OR DOWNSPOUTS. (CRICKETS), REFER TO SPECIFICATIONS. 9. CONTRACTOR TO VERIFY REQUIREMENTS OF ALL ROOF TOP EQUIPMENT WITH <br /> COWL EXTENDING 10 FT. MIN. FROM EXHAUST FAN. RE: 1 A01.1 SPECIFICATION SHEETS PRIOR TO TRUSS DESIGN. ROOF PLAN <br /> MECHANICAL DWGS.. 11. PARAPET COVE LIGHTING, RE: DET 3/A8.40 & ELEC. 21. GAS WH EXHAUST. RE: PLUMBING DWGS. 2. THE PRIMARY DRAINAGE SYSTEM CONSISTS OF 3 HORIZONTAL 2. FLASHING & ROOF DETAILS -SINCE ROOF MANF.S HAVE DIFFERENT DETAILS <br /> DWGS O KEY NOTE EJECTION SCUPPERS THAT TRANSFER STORM WATER RUNOFF FOR INSTALLATION OF THEIR ROOF SYSTEMS, FLASHING CONDITIONS, ETC., 10. GENERAL CONTRACTOR TO COORDINATE FREEZER EQUIPMENT PER Date: 12.21.2020 <br /> 4. HOOD EXHAUST FAN ON CURB. RE: MECHANICAL 22. 4" BOX GUTTERS WITH 3" ROUND DOWNSPOUTS SHEET TO 3 EQUALLY SIZED DOWNSPOUTS, OR LEADERS. THE DETAILS SHOWN ON THE DWGS. ARE TO BE CONSIDERED SCHEMATIC. MANUFACTURER SPECIFICATIONS. <br /> DWGS. 12. 24X24 ACCESS PANEL FOR SIGNAGE MAINTENANCE METAL WITH KYNAR FINISH FLAT BLACK. 4 ITEMS SUCH AS PARAPET FLASHING, CANTS, BLOCKING, ROOF PENETRATIONS Project Number: <br /> 3. EACH DOWNSPOUT IS SIZED 4"X6" HORIZONTAL. & EXPANSION JOINTS ARE TO BE INSTALLED PER MANUFACTURES DETAILS. THE 11. ROOF TOP UNITS (RTU) INCLUDE FACTORY CURB &TREATED BLOCKING AS RAC19048.0 <br /> 5. ICE MACHINE CONDENSER, RE: MECHANICAL DWGS. 13. ROOF ACCESS HATCH. 23. PLUMBING STACK VENT. RE: PLUMBING DWGS. GC IS TO SUBMIT THE MANUFACTURES STANDARD ROOF DETAILS PRIOR TO REQUIRED FOR INSTALLATION. <br /> RE: 12/A8.40 FOR CURB DETAIL 3 a-000 1 INTERIOR ELEVATION MARK 4. EACH SCUPPER IS SIZED 5-3/4"TALL X 10" HORIZONTAL. THE BEGINNING OF THE WORK. Drawn By: _ <br /> 14. HORIZONTAL GUARD RAIL AT 48"ABOVE DECK. PAINT 24. ROOF HYDRANT. RE: PLUMBING DWGS. 12. GC TO VERIFY MIN. MANF.'S SERVICE AND/OR OPERATIONAL CLEARANCES <br /> 6. COOLER/FREEZER CONDENSERS FURNISHED BY RAIL &STRUTS BLACK. RE: 8/A8.40 4( 5. THE EMERGENCY DRAINAGE SYSTEM CONSISTS OF 3 3. REFER TO STRUCTURAL DWGS. FOR DECK BEARING ELEV. @ ROOF. ARE PROVIDED, WHICHEVER EVER THE GREATER. <br /> EQUIPMENT CONTRACTOR INSTALLED BY G.C. IN 25. METAL ROOF DECK. 2 HORIZONTAL EJECTION SCUPPERS SIZED IN ITEM #4 ABOVE. <br /> ACCORDANCE W/ MANUF. RECOMMENDATIONS FOR 15. RESILIENT ACCESS WALK WAY, CONTINUOUS AROUND REF. 4. REFER TO MECHANICAL & ELECTRICAL DWGS. FOR ADDITIONAL ITEMS ON OR 13. ALL EXTERIOR DIMENSION ARE FACE OF STUDS Sheet Number: <br /> ROOF MOUNTING, INCLUDING ALL TREATED BLOCKING, ROOFTOP EQUIPMENT. 26. STANDING SEAM METAL ROOF OVER CORRAL AREA # DETAIL DESIGNATION ROOF PLAN LEGEND THROUGH ROOF. <br /> ACCESSORIES PENETRATIONS & ELECTRICAL A0.0 <br /> CONNECTIONS. ROUTE COOLER/FREEZER LINES 16. ROOF SCREEN TO CONCEAL ROOF TOP EQUIPMENT 27. SIGNAGE (N.I.C.) PROVIDE BLOCKING & OUTLET. REFER F.O.S.: ALL EXTERIOR STUD DIMENSIONS ARE TO FACE OF PLYWOOD- 5. CLEAN ROOF OF ALL CONSTRUCTION DEBRIS AT PROJECT COMPLETION. <br /> (REFRIGERANT, POWER, CONTROLS, ETC.) THROUGH BEYOND. RE: 5/A8.40 TO ELEC. DWGS. SEE A1.21 FOR ADDITIONAL INFO. <br /> GOOSENECK ROOF PENETRATIONS 6. ALL ROOF TOP MECHANICAL EQUIPMENT SHALL BE STRAPPED &SECURED TO Al ■ 5 N <br /> 17. UTILITY PENETRATION THRU ROOF, RE:MECH, PLUMBING &DET. 28. ROOF PENETRATION FOR IT EQUIPMENT. RE: 10/A8.40 A0.0 SECTION DESIGNATION T.O.S.:TOP OF SHEATHING-SEE STRUCT. DWGS. - DIMENSIONED THE ROOF PER EQUIPMENT MANUFACTURER. STANDARDS. <br /> 7. RESTROOM EXHAUST FAN, RE: MECHANICAL & 10/A8.40 FROM FLOOR LINE Q <br /> ELECTRICAL DWGS. 29. NOT USED <br /> 18. PRE-FINISHED METAL CAP FLASHING &CORNICE T.O.P.:TOP OF PARAPET- DIMENSIONED FROM FLOOR LINE TO TOP <br /> CID <br /> PROFILE, TYPICAL @ PERIMETER. G.C.TO COORDINATE OF PARAPET DOUBLE PLATES N <br />
The URL can be used to link to this page
Your browser does not support the video tag.