Laserfiche WebLink
SYMBOL LEGEND 2019 CBC. SECT. 803 WALL FINISH LINE TYPE LEGEND FLOOR FINISH LEGEND GENERAL INSTALLATION NOTES <br /> WALL & CEILING FINISHES <br /> 1 SUB-CONTRACTOR AND GC TO COORDINATE LEVELNESS &TEXTURE OF <br /> O WINDOW DESIGNATION INTERIOR WALLS AND CEILINGS SHALL BE CLASSIFIEDB.1 x—x—x—x— INTERIOR BRICK SLAB WHERE RUBBER FLOORING PRODUCTS ARE TO BE APPLIED. <br /> FOR FIRE PERFORMANCE AND SMOKE DEVELOPMENT IN T-1 CERAMIC FLOOR FIELD TILE CONCRETE FINISH SHALL COMPLY WITH THE FLOORING MANUFACTURERS <br /> ACCORDANCE WITH SECTION 803.1.1 OR 803.1.2, EXCEPT MINIMUM STANDARDS. <br /> O KEY NOTE AS SHOWN IN SECTION 803.2 THROUGH 803.13. EWF-2 ELASTOMETRIC COATING 2 THE SUB-CONTRACTOR SHOULD REQUEST AND RECEIVE WRITTEN <br /> MATERIALS TESTED IN ACCORDANCE WITH SECTION W o <br /> 803.1.2 SHALL NOT BE REQUIRED TO BE TESTED IN APPROVAL OF AN ACCEPTANCE SAMPLE FROM THE GC PRIOR TO <br /> O DOOR DESIGNATION ACCORDANCE WITH SECTION 803.1.1 T-2 CERAMIC TILE RESTROOM INSTALLATION. AS REQUESTED, PROVIDE MOCK-UP SAMPLE FOR OWNER o <br /> FIBER-REINFORCED PLASTIC APPROVAL PRIOR TO INSTALLATION. PROVIDE CORE SAMPLE, AND PATCH ` x <br /> INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE HOLE TO LIKE NEW, AS REQUESTED. <br /> Room name 3 RUBBER FLOORING SHALL BE ECO-GRIP BY ALLIED INDUSTRIES _ w o ~o rn <br /> ROOM NAME&NUMBER CLASSIFIED IN ACCORDANCE WITH ASTM E84 OR UL 723. <br /> 5555 SUCH INTERIOR FINISH MATERIALS SHALL BE GROUPED IN GS-1 GALVANIZED STEEL WALL END 4 SUB-CONTRACTOR SHALL COMPLY WITH FULL SPECIFICATION SECTION 10 W Q = <br /> THE FOLLOWING CLASSES IN ACCORDANCE WITH THEIR CAP T_3 NOLA BUSINESS NAME TILES 02 13 Q ,i <br /> Ref FLAME SPREAD AND SMOKE DEVELOPED INDEXES PER '�' <br /> 1 CBC 2016, SECTION 803.1.1 P_1 � � � � � � � � � � � � � � � � PAINT OVER GYPSUM 5 THE SUB-CONTRACTOR SHALL INSPECT THE FINISHED CONCRETE SLAB FOR � � o 00 <br /> DETAIL OR SECTION DESIGNATION COMPLIANCE WITH MANUFACTURER'S MINIMUM STANDARDS AND PROVIDE r <br /> A07.3 WRITTEN ACCEPTANCE OF THE SURFACE PRIOR TO WORK. Q`? <br /> CLASS A = FLAME SPREAD INDEX 0-25; V <br /> 1 SMOKE—DEVELOPED INDEX 0-450 P-D — — 518" DENSE SHIELD T-4 CERAMIC TILE FLOOR ACCENT 6 INSTALL ONLY IN A WELL VENTILATED AREA TO THE EXTERIOR. � C/) <br /> N <br /> CLASS B = FLAME SPREAD INDEX 26-75; <br /> 1 1 INTERIOR ELEVATION MARK SMOKE—DEVELOPED INDEX 0-450 C:) rn <br /> A5.1 CLASS C = FLAME SPREAD INDEX 76-200; <br /> SMOKE—DEVELOPED INDEX 0-450 STAINLESS STEEL PANEL RUBBER FLOORING KEYNOTES <br /> 1 <br /> SS-2 RF RUBBER FLOORING RF-1 CONTINUE COVE BASE AROUND WASH AREA AT LEVEL HEIGHT. GC AND <br /> _ EXTERIOR ELEVATION MARK INTERIOR WALL AND CEILING FINISH SHALL HAVE A FLAME " " " " " " " " " " " " " " " " " " " " " " ' STAINLESS STEEL WALL END <br /> SPREAD INDEX NOT GREATER THAN THAT SPECIFIED INOWNER TO PROVIDE STAINLESS STEEL PANELING ABOVE. <br /> 1A4.1 TABLE 803.11 FOR THE GROUP AND DESIGNATED LOCATION. CAP RF-2 CONTINUE COVE BASE AROUND FACE AND INTERIOR OF COOLER AS <br /> T-5 KITCHEN WALL TILE PICTURED. REFER TO DETAIL <br /> OFINISH TAG TABLE 803.11, CBC 2016 _ _ __ _- SC SEALED CONCRETE w/SLIP-RESISTANT FINISH RF-4 REAR DOOR THRESHOLD TO CONCEAL JOINT OF RUBBER FLOORING <br /> SPRINKLERED BUILDING T_6 RF-5 REFER TO DETAIL 13/A8.31 Store: <br /> PREP AREA WALL TILE RF-6 STAINLESS STEEL FLOOR FINISH BY COOLER/FREEZER MANUFACTURER <br /> GROUP ROOMS AND ENCLOSED SPACES RF-7 SMOOTH RUBBER FLOORING TO ALIGN WITH EQUIPMENT. DO NOT INSTALL AT W KETTLEMAN & LOWER SCRAMENTO <br /> OPATIO CONCRETE STAIN w/SLIP-RESISTANT FINISH TRAFFIC AREAS <br /> T-7 . - - - - - - - - - - - - - - - - - " " ' DRINK STATION WALL TILE T-9A <br /> _ A-2 CLASS c LODI, CA 95242 <br /> B CLASS C <br /> S `=�:'•;', T-$ RESTROOM ACCENT TILE Restaurant #RC576 <br /> lr -1 �— `== - a S CLASS C <br /> STAINLESS STEEL FLOORING AT FREEZER <br /> PAINT TO MATCH �,.r=' P4E-HV-M SCHEME A <br /> ONE ' OEM OEM ' OEM OEM ' OEM ' OEM ' ONE RESTROOM WALL TILE sMoorH <br /> Professional of Record: JEFF LIEDERMAN <br /> L RUBBER FLOORING SMOOTH FINISH TO COMPLY <br /> W-1 DOUGLAS FIR 6" PLANKS RF-S WITH HEALTH DEPT.REQUIREMENTS,INCLUDING <br /> RELATED MATERIALS <br /> DESIGN <br /> Architectural <br /> = = `; -: ._�'•;>: _ =`` Solutions Group <br /> 1 101 Central Expressway South <br /> r= ,' <br /> Suite 100 <br /> _- _- ;;JR" __ _ _ _ ____ _ ___'.�; �•�'?Y' _ __ ;';_; __ _ _ _= Allen,TX 75013 CONTACT: EVERETT FIELDS <br /> (469) 619-1164 <br /> EFIELDS@PMDGINC.COM <br /> DUMPSTER ENCLOSURE <br /> CO Q NRCH/Teo <br /> RF-1 JEFFRRMP � <br /> 29534 <br /> WASH AREA �� 1 Q <br /> Q LEVEL CHANGE 30, <br /> �T NR NEW PL <br /> 9TF OF CPQ\ <br /> UN SEX RES R <br /> P-1 <br /> _ _1 r 2 <br /> SS - RESTROOM VESTIBULE <br /> r " _ I I I P-D - T-$ I I T-1 = START OF TILE <br /> 5'-9" 2'-4112" P-1 <br /> F- � T-10 _ <br /> _ _ GS-1 GUSTO ER PICK UP <br /> A F I W-1 - = Prototype: P4E- HV 2020 -2.0 RELEASE <br /> _ T-2 SC _ U, <br /> RF-S � - <br /> FRP-1 I � � � � T_1 Prototype Issue Date: 7.14.2020 <br /> SUPPLY SS F_ F. BROOM CLO T ■ \ N <br /> Design Bulletin Updates: -- <br /> $C UNISEX RESTR OM 9 UNISE RESTROOM ■ F. �, _ <br /> r`t�y ■ DINING ROOM Date Issued: Bulletin Number: <br /> - T-8 T-8 I --SS-1 ■ T-7 _ REFER TO SHEET A0.12 <br /> EXTERIOR CORRAL - - �n - T-2 ■ - <br /> PAINT TO MATCH O J L RF T-1 O 0 T-1 O ■ RF T-1 FOR PATIO PLANS i <br /> O SERVING AREA 1ST BLDG. SUBMITTAL <br /> EWF-2 RF-1 ■ <br /> RF-1 _ ■ STAINLESS STEEL ON THIS SIDE <br /> _ B.O.H KITCHEN SS-2 ■777 7� OF BULKHEAD AT 9"-0"AFF. <br /> 000 T-4 <br /> O <br /> SS-1 RF-1 OPEN KITCHEN - <br /> I - I <br /> SS-1 FRP-1 � T-5 � � - <br /> L I OVE ao <br /> - KITCHEN HOOD MANUFACTURE SS-2 <br /> ABOVE <br /> FRP-1 O SS'2 PROVIDE 1"INSULATED BACK SS_2 O = I P-1 REVISIONS: <br /> SPLASH AT BEHIND HOOD,RE: O GS-1 B-1 _ 12.22.2020 1st Building Submittal <br /> TO HOOD DRAWINGS - 1 <br /> FRP-1 - <br /> 0 0 0 - 2 <br /> SS-1 - _ - - _ 3 <br /> RF-1 RF-1 RF-1 RF-1 - _ 5 <br /> \7777\\\77777777 III ] MEMO 11 <br /> - SS-1 - - - <br /> RF-1 - 6 <br /> L - , r r - `' `�-I , - - - <br /> w <br /> _ - - - T-5 x z 7 <br /> I I T-3 8 <br /> - U_ FRP-1 RFUD <br /> .2 - - - - _ - <br /> SS - <br /> o I 9'-1 114" <br /> RF - O CRE) o RF - .. <br /> 1 1 II , I I - <br /> MECH.ROOM GS-1 P-1 Sheet Title: <br /> FRP-1 I O I it B.o.H KIrc�N SS-2 - I <br /> 1 ABOVE x =' <br /> " 01 ' Q RF SS-2 I DRIVE-THRU PICKUP " " " ' FINISH <br /> - - - _. <br /> 1 1 SS-2 FRP-1 I I I I T-6 I ; ■ T'7 = FLOOR PLAN <br /> RF - ABOVE <br /> - SS-1 SS-1 = I - x =T-7 ■ ■ P-1 I <br /> MANAGER'S OFFICE $$-1 Date: 12.21.2020 <br /> LL DRIVE-THRU PAYI RF-1 RF-1 1 ♦O ■ ■ <br /> FRP-1 - � I � III � I I T'S . . . . . . . . . . . Pro'ect Number: <br /> ' - RF 1 = I RAC19048.0 <br /> L <br /> MOMM 11Drawn By:2 _ <br /> FINISH FLOOR PLANL KITCHEN HOOD MANUFACTURER <br /> 1/4"=1'-0" FRP-1 PROVIDE 1"INSULATED BACK O <br /> 11A8.31 SPLASH AT BEHIND HOOD,RE:TO Sheet Number: <br /> 4 <br /> PLAN HOOD DRAWINGS <br /> NORTH <br /> A3 . 20 N <br /> J <br /> Q <br /> H <br /> H <br /> L <br /> m <br /> C/7 <br />