Laserfiche WebLink
CLAY ROOF TILE PER CLAY ROOF TILE PER FIRE BLOCKING - TYPICAL <br /> EXTERIOR FINISH SCHEDULE. EXTERIOR FINISH SCHEDULE. <br /> 2x WOOD RIDGE RE: EXTERIOR ELEVATIONS 2x WOOD RIDGE 11R EXTERIOR ELEVATIONS 1. FIREBLOCKING SHALL BE PROVIDED IN CONCEALED SPACES OF STUD WALLS AND PORTIONS, INCLUDING FURRED <br /> BOARD. RE: BOARD. RE: SPACES, AND PARALLEL ROWS OF STUDS OR STAGGERED STUDS, AS FOLLOWS: <br /> STRUCTURAL 1 PLYWOOD SHEATHING W/ 0 STRUCTURAL PLYWOOD SHEATHING W/ <br /> WATER-RESISTIVE BARRIER. WATER-RESISTIVE BARRIER. VERTICAL AT THE CEILING AND FLOOR LEVELS. <br /> RE: STRUCTURAL RE: STRUCTURAL H <br /> HORIZONTALLY AT INTERVALS NOT EXCEEDING 10 FEET f o <br /> 5 5 (718.2.2) W T <br /> C\J C10 <br /> A8.41 A8.41 x o 9 <br /> 23'-2" A.F.F. 23'-2" A.F.F. 2. FIREBLOCKING SHALL BE PROVIDE AT INTERCONNECTIONS BETWEEN CONCEALED VERTICAL STUD WALL OR �..� x <br /> PARTITION SPACES AND CONCEALED HORIZONTAL SPACES CREATED BY AN ASSEMBLY OF FLOOR JOIST OR w - <br /> PLATE HT. PLATE HT. TRUSSES, AND BETWEEN CONCEALED VERTICAL AND HORIZONTAL SPACES SUCH AS OCCUR AT SOFFITS, DROP x f o rn <br /> 2x6 WOOD RAFTERS. I I CEILINGS, COVE CEILINGS AND SIMILAR LOCATIONS. (718.2.3) W Q <br /> RE: STRUCTURAL ` <br /> COVE LIGHT. PROVIDE <br /> COVE LIGHT. PROVIDE BY ` 3. FIREBLOCKING OF THE ANNULAR SPACE AROUND VENTS, PIPES, DUCTS, CHIMNEYS AND FIREPLACES AT CEILING III �' m o <br /> 2x6 WOOD RAFTERS. ` nn o 0 <br /> TURAL BY OWNER & INSTALL <br /> AND FLOOR LEVELS SHALL BE INSTALLED WITH A MATERIAL SPECIFICALLY TESTED IN THE FORM AND MANNER T <br /> RE: STRUC <br /> INTENDED FOR USE TO DEMONSTRATE ITS ABILITY TO REMAIN IN PLACE AND RESIST THE FREE PASSAGE OF m � <br /> RE: EXT. ELEVS. & ELEC. BY AGI RE: EXT. V m o 0-)ELEVS. & ELEC. FLAME AND THE PRODUCTS OF COMBUSTION. (718.2.5) O n <br /> OWNER & INSTALL BY AGI N_ <br /> PRE-FINISHED METAL CD N <br /> CAP FLASHING OVER PRE-FINISHED METAL 00 <br /> o <br /> 2x8 FASCIA BOARD CAP FLASHING OVER REFER TO PROJECT SPECIFICATIONS <br /> 2x8 FASCIA BOARD SHEETS A9.10 TO A9.60 CD <br /> WOOD STUDS @ <br /> 16" O.C. 11 <br /> WOOD STUDS @ 16" O.C. <br /> 1/2" EXTERIOR GRADE -1/2" EXTERIOR GRADE <br /> PLYWOOD SHEATHING PLYWOOD SHEATHING <br /> 2x6 WOOD JOISTS. 7/8" CEMENT PLASTER O, 7/8" CEMENT 3 Store: <br /> MTL LATH 0/ 2-LAYERS PLASTER 0/ MTL <br /> RE: STRUCTURAL GRADE "D" PAPER. LATH 0/ 2-LAYERS PARAPET BEYOND 8.40 _ _ W KETTLEMAN & LOWER SCRAMENTO <br /> GRADE D PAPER. 18'-2" A.F.F. _ _ _ _ _ LOD�, CA 95242 <br /> PRE-FINISHED METAL <br /> 2-PIECE REGLET & PLATE HT. CAP FLASHING <br /> Restaurant #RC576 <br /> COUNTERFLASHING. COVE LIGHT. PROVIDE BY <br /> RE: 9/A8.40 _ J-BOX FOR SIGNAGE N 2x6 WOOD JOISTS. I OWNER & INSTALL BY AGI P4E-HV-M SCHEME A <br /> �J 2-PIECE REGLET & <br /> R30 RIGID ROOF RE: STRUCTURAL RE: EXT. ELEVS. & ELEC. <br /> INSULATION. RE: 9 RFLASHING _ Professional of Record: JEFF LIEDERMAN <br /> RE: 9/A8.40 1/2 EXTERIOR GRADE <br /> SINGLE-PLY ROOF i �� <br /> SYSTEM. RE: r2 <br /> 2-PIECE REGLET & PLYWOOD SHEATHING <br /> ROOF PLAN. COUNTERFLASHING. J-BOX FOR SIGNAGE SINGLE-PLY ROOF SYSTEM. <br /> SIGN BY OWNER RE: ROOF PLAN. 7/8" CEMENT PLASTER 0/ <br /> R30 RIGID ROOF (UNDER SEPARATE PERMIT) RE: 9/A8.40 MTL LATH 0/ 2-LAYERS <br /> SIGN BY OWNER INS RIGID ROOF GRADE "D" PAPER. <br /> INSULATION. SINGLE-PLY ROOF SYSTEM. (UNDER SEPARATE PERMIT) INSULATION. <br /> RE: ROOF PLAN. <br /> DESIGN <br /> FAR <br /> ROOF SHEATHING. <br /> RE: STRUCT. DWGS. WOOD STUDS @ 16" O.C. <br /> R19 BATT INSULATION. A C C Il I t@ C t u r 8 I <br /> I - - - - - - - � - - - - - - Solutions Group <br /> ROOF TRUSS N 1101 Central Expressway South <br /> RE: STRUCT. DWGS. BLOCKING REQUIRED FOR BLOCKING REQUIRED FOR BLOCKING REQUIRED FOR Suite 100 <br /> AWNING.. RE: STRUCT. DWGS I AWNING.. RE: STRUCT. DWGS I Allen, TX 75013 <br /> AWNING.. RE: STRUCT. DWGS <br /> ROOF SHEATHING. ROOF SHEATHING. CONTACT: EVERETT FIELDS <br /> RE: STRUCT. DWGS. 5 I RE: STRUCT. DWGS. 5 1 (469) 619-1164 <br /> 8.2 I 8.2 R19 BATT INSULATION. EFIELDS@PMDGINC.COM <br /> R19 BATT INSULATION. ' I <br /> LIGHT FIXTURE FLASHING TO MATCH MET\L <br /> 4 <br /> RE: RCP & PANEL 4 <br /> ELEC. DWGS. 8.40 ROOF TRUSS. I ROOF TRUSS. <br /> PREFABRICATED AWNING PREFABRICATED AWNING <br /> PATIO R OF ASSEMBLY /RE: STRUCT. DWGS. I BY OTHER (AGI) RE: STRUCT. DWGS. I BY OTHER (AGI) <br /> 2x4 @ 16" O.C. <br /> I �� ARCH/TF <br /> r T �� s• 0 <br /> 4 11'-0" A.F.F. I 11'-0" A.F.F. I 11'-0" A.F F. I �EFFRRMPN <br /> B.O. TRUSS I B.O. TRUSS o I B.O. TRUS o I C,2g534 <br /> IX <br /> d„:„ I S P R NEWO D P p) <br /> 1-1 <br /> r� J <br /> CYPRESS WOOD CO J " <br /> CEILING PLANKS 10 <br /> RE: RCP CEILING HT. <br /> 2x WD CEILING JOIST o 0 <br /> II @ 16" O.C. <br /> 1/2" GYP. BD. 0/ 1/2" 2 A8.40 ` N N <br /> PLYWOOD SHEATHING. � � 2.2 II GYPSUM BD. CEILING. 1 <br /> r II RE: RCP I CUSTOM METAL PANEL ACOUSTICAL CEILING CUSTOM METAL PANEL Prototype : P4E- HV 2020 -2.0 RELEASE <br /> I WALL TILE 0/ 1/4" TILE BACKER BD. PROVIDED BY OWNER. ATTACH TILE ON SUSP. PROVIDED BY OWNER. ATTACH <br /> II & 1/2" PLYWOOD. TO 1/2" VERTICAL FURRING SYSTEM. RE: RCP TO 1/2" VERTICAL FURRING Prototype Issue Date: 7.14.2020 <br /> X <br /> RE: FLOOR FINISH PLAN CHANNELS @ O.C. FRP 0/ 1/2" PLYWOOD CHANNELS @ O.C. Design Bulletin Updates: -- <br /> II 1 RE: FLOOR FINISH PLAN 1 <br /> 2.2 HEADER RE: STRUCTURAL 2'2 HEADER RE: STRUCTURAL Date Issued: Bulletin Number: <br /> INTERIOR WALL BEYOND II <br /> 3 <br /> 2.1 II <br /> AIR CURTAIN. AIR CURTAIN. 1ST BLDG. SUBMITTAL <br /> II RE: ELEC. DWGS. INTERIOR WALL � RE: ELEC. DWGS. <br /> II BEYOND <br /> II _ <br /> 0 0 <br /> LO 0 <br /> C) 0 0 <br /> 0 I II <br /> 0 0 0 <br /> II <br /> ALUMINUM 0' <br /> STOREFRONT/DOOR II DRIVE THRU WINDOW DRIVE THRU WINDOW <br /> RE: SCHEDULE II <br /> 9 9 BRICK WALL BEYOND REVISIONS: <br /> II 2.2 2.2 RE: EXTERIOR ELEVS. 12.22.2020 1st Building Submittal <br /> II 2 <br /> a CAST STONE SILL CAP CAST STONE SILL CAP 3 <br /> II ( RE: 9/A2.20 RE: 9/A2.20 <br /> 4 <br /> II WALL TILE 0/ 1/4" TILE BACKER BD. CUSTOM METAL PANEL FRP 0/ 1/2" PLYWOOD WITH CUSTOM METAL PANEL 5 <br /> 11 II & 1/2" PLYWOOD WITH 8" CEMENT PROVIDED BY OWNER. ATTACH 8" CEMENT BD. AT BASE PROVIDED BY OWNER. ATTACH 6 <br /> 2.1 CONCRETE II BD. AT BASE - TO 1/4" VERTICAL FURRING RE: FLOOR FINISH PLAN - TO 1/4" VERTICAL FURRING <br /> SIDEWALK. RE: FLOOR FINISH PLAN <br /> C) CHANNELS @ O.C. �i CHANNELS @ O.C. 8 <br /> RE: CIVIL II RUBBER BASE "' RUBBER BASE <br /> FLOOR TILE 0/ DWGS. II RE: 11/A8.31 & FINISH SCHEDULE RE: 9/A8.31 & FINISH SCHEDULE <br /> CONIC. FLOOR. CONCRETE CURB. CONCRETE CURB. <br /> RE: FINSIH SCHEDULE & I I II RUBBER FLOOR RE: CIVIL DWGS. RUBBER FLOOR /Y RE: CIVIL DWGS. <br /> STRUCT. DWGS. I II 0/CONC. FLOOR. 0/GONG. FLOOR. Sheet Title: <br /> 0'-O" 0'-O" RE: STRUCT. DWGS. I 0,-0" RE: STRUCT. DWGS.lk I <br /> F:F. ° a d° ° F.F. ° _ ,d 4 F.F. <br /> A a I <br /> Q da <br /> ad ad <br /> d <br /> WALLSECTIONS <br /> 1_ .L?. ...�'.i'.i'.• .,, ., •-..',' =' 4 _. ,a .9d �< °..Ad- -`' .. - - u .94 _� °� d - �e - <br /> Date: 12.21.2020 <br /> BLDG. FOOTINGS. - <br /> �T d. a 2 RE: STRUCT. DWGS. a 2 ProjectNumber: RAC19048.0 <br /> 'rynr Il-)I <br /> 8.2 - 8.2 Drawn By: _ <br /> Sheet Number: <br /> WALL SECTION AT ENTRY WALL SECTION AT DRIVE THRU PICK UP WINDOW WALL SECTION AT DRIVE THRU PAY WINDOW A7 . 1 0 <br /> 3/4"= 1'-0" 3/4"= 1'-0" 3/4"= 1'-0 J <br /> 1/A1.10 21 1/A1.10 31 1/A1.10 Q <br /> m <br />