Lra <br /> SECTION 09 77 00 - FIBERGLASS REINFORCED PANELS W T <br /> N Cy') <br /> SECTION 09 29 00 - GYPSUM BOARD SECTION 09 30 13 - CERAMIC TILE o a' <br /> PRODUCT: FIBERGLASS REINFORCED PANELS BY NUDO, CRANE COMPOSITES, C� <br /> PRODUCT: GYPSUM BOARD PANELING & ACCESSORIES BY USG PRODUCT: CERAMIC TILE & GROUT (REFER TO FINISH SCHEDULE) MARLITE, OR EQUAL. w o ~ ti <br /> 1. APPLICATIONS: WALL BACKER BOARD: REFER TO SECTION 09 29 00 FINISH: WHITE, TEXTURED/EMBOSSED; WHITE TRIM Q <br /> L.3 <br /> cn o <br /> TYPICAL WALLBOARD: SHEETROCK GYPSUM PANELS BY USG, ASTM C36, TAPERED SLAB SURFACE PREP: UZIN NC 888 TURBO PATCHING COMPOUND OR APPROVED THICKNESS: .090" X D o <br /> EDGES, 5/8" THICK WHEN INSTALLED DIRECTLY OVER STUDS, 1/2" THICK WHEN EQUAL. o V o o) <br /> APPLIED OVER PLYWOOD SHEATHING. 1. FRP ACCESSORIES: ALL MOLDINGS, TRIM, ADHESIVE AND OTHER SHALL BE AS M <br /> PLYWOOD OR OSB SURFACE PREP: ARDEX 8+9 WATERPROOFING COMPOUND OR RECOMMENDED BY THE PANEL MANUFACTURER. o CO clj <br /> TYPICAL CEILING: SAG-RESISTANT INTERIOR CEILING BOARD BY USG, ASTM C36, APPROVED EQUAL o <br /> 00 <br /> TAPERED EDGES, 5/8" THICK 2. SEALANT: ONE PART SILICON RUBBER, ASTM C920 AND FS TT-S-0011 543A OR AS <br /> 1. PERFORM ALL TILE WORK IN ACCORDANCE WITH THE REQUIREMENTS OF ANSI RECOMMEND BY THE PANEL MANUFACTURER (MUST BE FDA APPROVED); COLOR <br /> TILE BACKER BOARD AND WALLBOARD AT COOLER/FREEZER ALCOVE: DENSHIELD -TCI 137.1, "RECOMMENDED STANDARD SPECIFICATION FOR CERAMIC TILE." -CLEAR. <br /> PANELS BY USG, ASTM C630, TAPERED EDGES, 5/8" THICK WHEN INSTALLED <br /> DIRECTLY OVER STUDS, 1/4" THICK WHEN APPLIED OVER PLYWOOD SHEATHING. 2. MIX AND PROPORTION PRE-MIX SETTING BED AND GROUT MATERIALS IN 3. INSTALL PANELS PER MANUFACTURERS WRITTEN INSTRUCTIONS USING <br /> ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. NON-FLAMABLE ADHESIVE (100% COVERAGE). PANELS SHOULD BE INSTALLED WITH <br /> .**FOR WALLBOARD @ MOP SINK, WALLBOARD @ KITCHEN HOOD, AND WALL BASE THE 48-INCH DIMENSION HORIZONTAL. NO INTERMEDIATE HORIZONTAL JOINTS. <br /> BACKER BOARD, REFER TO SECTION 06 16 00 3. LAY-OUT TILE WORK SO THAT NO TILES LESS THAN 1/2 FULL TILE WILL OCCUR. <br /> ALL TILE SHALL BE BROUGHT TO TRUE AND LEVEL PLANES WITH JOINTS WELL 4. SCRIBE & CUT PANELS AS REQUIRED FOR A TIGHT FIT. CAULK ALL JOINTS AND Store: <br /> 2. ACCESSORIES FILLED AND SHALL BE SECURED FIRMLY IN PLACE. INCLUDE TILE "EDGE MOLDINGS WITH SEALANT. <br /> CORNER BEADS, CONTROL JOINTS AND EDGE TRIM: PER ASTM C1057; EQUAL TO PROTECTOR" AS SPECIFIED. 5. PROVIDE STAINLESS STEEL "Z" TRIM FLASHING STRIP AT JOINT BETWEEN WALL W KETTLEMAN & LOWER SCRAMENTO <br /> USG #103 DUR-A-BEAD, #093 AND #200-A, RESPECTIVELY, GALVANIZED. <br /> FASTENERS: SCREWS PER ASTM 1002, 11-1/4" TYPE "W" BUGLE HEAD FOR WOOD 4. NOTIFY THE GENERAL CONTRACTOR OF ANY DEFECTS IN THE SURFACE OR PANEL AND COVE BASE. CAULK TOP AND BOTTOM OF FLASHING STRIP WITH LODI, CA 95242 <br /> FRAMING AND 1-1/8 TYPE S FOR STEEL FRAMING AND 3/8 TYPE 'IS-1211 PAN HEAD SUBSTRATE TO RECEIVE THE TILE PRIOR TO BEGINNING WORK. SEALANT. <br /> FOR STEEL TO STEEL FRAMING CONNECTIONS. JOINT TREATMENT: PAPER Restaurant #RC576 <br /> REINFORCING TAPE PER ASTM C475. JOINT COMPOUND: PROVIDE A CHEMICAL 5. ALLOW TILE TO SET FOR 48-HOURS PRIOR TO GROUTING. PROHIBIT TRAFFIC SECTION 09 91 00 - PAINTING P4E-HV-M SCHEME A <br /> HARDENING TYPE FOR BEDDING AND FILLING AND READY MIXED VINYL TYPE FOR FROM FLOOR FINISH OR ACTIVITIES NEAR WALL FINISH FOR 72-HOURS AFTER <br /> TOPPING, PER ASTM C475. INSTALLATION. PROTECT ALL TILE WORK FROM DAMAGE WITH KRAFT PAPER OR <br /> OTHER HEAVY DUTY NON-STAINING COVERING DURING THE REMAINDER OF THE PROVIDE LABOR, MATERIALS, EQUIPMENT AND RELATED ITEMS REQUIRED TO Professional of Record: JEFF LIEDERMAN <br /> 3. BOARD INSTALLATION :INSTALL CEILING BOARDS IN THE DIRECTION AND MANNER CONSTRUCTION PERIOD. COMPLETE THE EXTERIOR AND INTERIOR ITEMS AND SURFACES THROUGHOUT <br /> WHICH WILL MINIMIZE THE NUMBER OF END BUTT JOINTS. STAGGER END JOINTS AT THE PROJECT, INCLUDING FILLING, SEALING, PRIMING AND FINISHING. <br /> LEAST 4 FEET. INSTALL BOARDS VERTICALLY TO AVOID END-BUTT JOINTS 6. UPON COMPLETION OF TILE WORK, CLEAN ALL SURFACES SO THAT THEY ARE <br /> WHEREVER POSSIBLE. LOCATE EITHER END OR EDGE JOINTS OVER SUPPORTS. FREE OF FOREIGN MATTER AND GROUT. 1. REFER TO FINISH SCHEDULE FOR PAINT SELECTIONS. APPLY PAINT AND PRIMER IN <br /> STAGGER JOINTS OVER DIFFERENT STUDS ON OPPOSITE SITE OF PARTITIONS. ACCORDANCE WITH MANUFACTURERS WRITTEN INSTRUCTIONS FOR EACH SPECIFIC FvAA <br /> SPACE FASTENERS IN GYPSUM BOARD IN ACCORDANCE WITH MANUFACTURER'S APPLICATION OR SUBSTRATE SCHEDULED TO BE PAINTED. DESIGN <br /> WRITTEN RECOMMENDATIONS. NO BUTT JOINTS ALLOWED WITHIN 12" OF A 2. PERFORM PREPARATION OF FILLING, SEALING, SANDING AND CLEANING OF <br /> WINDOW OR DOOR OPENING. SURFACES SCHEDULED TO RECEIVE PAINT IN ACCORDANCE WITH PAINT A r c h i t e c t u r a l <br /> 4. ACCESSORY INSTALLATION : INSTALL METAL CORNER BEADS AT HORIZONTAL MANUFACTURERS INSTRUCTIONS. Solutions Group <br /> AND VERTICAL EXTERIOR CORNERS OF DRYWALL WORK. SECURE WITH SCREWS. SECTION 09 51 00 -ACOUSTICAL CEILING TILE <br /> 3. COMPLETELY COVER ITEMS, SURFACES SCHEDULED TO BE PAINTED TO PROVIDE A 1 101 Central Expressway South <br /> INSTALL METAL CONTROL JOINT (BEADED TYPE) WHERE INDICATED AT 30-FEET <br /> MAXIMUM CENTERS IN ANY WALL OR CEILING. PRODUCT: ACOUSTICAL CEILING PANELS AND SUSPENSION SYSTEM (GRID) BY SMOOTH SURFACE WITH A UNIFORM FINISH, COLOR, APPEARANCE FREE FROM Suite 100 <br /> 013 <br /> USG; PANELS - SHEETROCK BRAND LAY-IN PANELS #3260, 24" X 24" E <br /> ( ) VERETT(KITCHEN); "CLOUDINESS, SPOTTING, LAPS BRUSH MARKS, RUNS STREAKS, SAGS" OR OTHER Allen, 75SURFACE DEFECTS. CONTACT: FIELDS <br /> 5. DRYWALL FINISHING : APPLY TREATMENT AT GYPSUM BOARD JOINTS, FLANGES OF GRID - DONN DX/DXL 15/16" (WHITE). NO SUBSTITUTIONS ALLOWED. (469) 619-1164 <br /> THE ACCESSORIES, PENETRATIONS, FASTENER HEADS, SURFACE DEFECTS AND EFIELDS@PMDGINC.COM <br /> ELSEWHERE AS REQUIRED TO PREPARE WORK FOR FINISH SURFACE MATERIAL 1. INSTALL SUSPENSION SYSTEM TO COMPLY WITH ASTM C636. LOCATE HANGERS 4. MECHANICAL AND ELECTRICAL WORK TO BE PAINTED INCLUDES THE FOLLOWING <br /> (PAINT, WOOD OR TILE). APPLY JOINT COMPOUND IN 3 COATS. SAND BETWEEN LAST NOT LESS THAN 6-INCHES FROM EACH END AND SPACED 3-FEET ALONG EACH (BUT NOT LIMITED TO): EXPOSED PIPING AND OR PIPE INSULATION (INSIDE AND <br /> 2 COATS AND AFTER FINAL COAT. CARRYING CHANNEL OR DIRECT HUNG RUNNER LEVELING TO TOLERANCE OF 1/8" OUTSIDE OF BUILDING), MECHANICAL EQUIPMENT SUPPORTS, GAS PIPING, EXPOSED <br /> IN 12-FEET. PROVIDE HANGER WIRE AT EACH CORNER OF RECESSED CONDUIT, BOXES AND PANEL FRONTS. IF IN DOUBT, VERIFY COLORS PRIOR TO <br /> 6. SUSPENSION SYSTEM (FOR CEILINGS) : COLD ROLLED STEEL SUSPENSION FLUORESCENT FIXTURE. APPLICATION. <br /> SYSTEM (CHANNELS) COMPATIBLE FOR APPLICATION. ASTM C645, <br /> MANUFACTURER'S STANDARD SYSTEM COMPRISED OF INTERLOCKING MAIN 2. SECURE WIRE HANGERS BY LOOPING AND WIRE-TYING DIRECTLY TO 5. DO NOT PAINT OVER DUST, DIRT, STAINS, RUST, OIL, GREASE, MOISTURE OR ANY pR CH <br /> BEAMS AND CROSS FURRING MEMBERS. ALL FRAMING MEMBERS AND TIES SHALL STRUCTURES OR TO INSERTS WHICH ARE SECURE AND APPROPRIATE FOR OTHER CONTAMINATION OR CONDITION WHICH MAY BE DETRIMENTAL TO SCD Y S TFc� <br /> BE SPACED TO SUPPORT ALL LOADS, INCLUDING LIGHT FIXTURES WITH A SUBSTRATE, AND WHICH WILL NOT DETERIORATE OR FAIL WITH AGE OR FORMATION OF A DURABLE PAINT FILM. JEFFRRMFN <br /> MAXIMUM DEFLECTION OF L/360 SPAN. CHANNEL RUNNERS: 1-1/2" ROLLED STEEL ELEVATED TEMPERATURE. <br /> CHANNELS, RUST PROHIBITIVE PAINTED. HANGER WIRE: GALVANIZED WIRE, GAGE 6. REMOVE HARDWARE AND ACCESSORIES, FITTINGS & FASTENINGS, ELECTRICAL ,29534 <br /> PER MANUFACTURER REC TIE WIRE: 18 GAGE GALVANIZED, CLASS 1, ZINC 3. INSTALL HANGER PLUMB AND FREE FROM CONTACT WITH OTHER OBJECTS PLATES, LIGHT FIXTURES AND ANY REINSTALLATION ON A TER COMPLETION OFRPAINTING.EINSTALL OR COORDINATE 30 20E� <br /> COATING, SOFT TEMPER WITHIN CEILING PLENUM. pPR w0_oP <br /> J'T RENE �O <br /> 4. INSTALL EDGE MOLDINGS TYPE INDICATED AT PERIMETER OF ACOUSTICAL 7. PROTECT ALL ADJACENT SURFACES. 9TF OF C Pte\ <br /> CEILING AREA AND AT ALL LOCATIONS WHERE NECESSARY TO CONCEAL EDGES <br /> OF PANELS. 8. REFER TO ADDITIONAL NOTES ON FINISH SCHEDULE SHEET. <br /> Prototype : P4E- HV 2020 -2.0 RELEASE <br /> Prototype Issue Date: 7.14.2020 <br /> SECTION 09 65 16.33 - RECYCLED PVC SAFETY FLOORING Design Bulletin Updates: -- <br /> PRODUCT: ECO-GRIP PVC SLIP RESISTANT FLOORING MANUFACTURED BY ALLIED Date Issued: Bulletin Number: <br /> INDUSTRIES <br /> COLOR: REFER TO FINISH SCHEDULE <br /> 1. COMPLETE INSTALLATION TO BE IN ACCORDANCE WITH MANUFACTURER'S 1ST BLDG. SUBMITTAL <br /> WRITTEN INSTRUCTION. DO NOT DELIVER OR INSTALL FLOORING UNTIL BUILDING <br /> IS ENCLOSED AND WEATHEPROOF, WET WORK IS COMPLETE, AND THE HVAC <br /> SYSTEM MAINTAINS TEMPERATURE AND HUMIDITY AT NORMAL OCCUPANCY <br /> LEVELS. ACCLIMATIZE FLOORING PARTS FOR A MINIMUM OF 24 HOURS TO THE <br /> AMBIENT TEMPERATURE AND HUMIDITY LEVELS OF SPACES IN WHICH THEY ARE <br /> TO BE INSTALLED. <br /> 2. PRODUCTS: ALL ADHESIVES, ACCESSORIES, TRIM AND MOLDING TO BE <br /> APPROVED BY FLOOR MANUFACTURER AND COMPATIBLE FOR USE WITH FLOOR <br /> SYSTEM. REVISIONS: <br /> 12.22.2020 1st Building Submittal <br /> 3. SITE CONDITIONS: VERIFY THE CONDITIONS FOR COMPLIANCE WITH THE 1 <br /> REQUIREMENTS INCLUDING ENVIRONMENTAL CONDITIONS, INSTALLATION 2 <br /> TOLERANCES AND OTHER CONDITIONS AFFECTING THE INSTALLATION AND <br /> PERFORMANCE OF FLOORING PARTS. ANY UNSATISFACTORY CONDITIONS SHALL 3 <br /> BE CORRECTED PRIOR TO INSTALLATION. 4 <br /> 5 <br /> 4. INSTALLATION: SUPPLY AND INSTALL ALL BASE CAPS AND SEALANT REQUIRED 6 <br /> FOR WORK IN THIS SECTION AND TO ENSURE A SOLID AND SECURE INSTALLATION 7 <br /> OF FLOORING. ADHERE ALL FLOORING PARTS USING ECO-GRIP 2 PART EPDXY <br /> MASTIC OR ECO-GRIP SEAL CARTRIDGE SUPPLIED ADHESIVE. ALL JOINTS IN 8 <br /> FLOORING SHALL BE HEAT WELDED USING ECO-GRIP 7MM V-SHAPED WELDING <br /> ROD AND APPLICABLE WELDING TOOLS. USE STAINLESS COLLAR FLOOR DRAIN <br /> DETAIL ON ALL CIRCULAR PENETRATIONS AND STAINLESS FLANGE FLOOR SINK <br /> DETAIL FOR ALL FLOOR SINKS. COUNTERSINK ALL THRESHOLDS AND FLATBAR, Sheet Title: <br /> SCREWS, AND ANCHORS TO BE FLUSH WITH TERMINATION OR TRANSITION <br /> PARTS. <br /> PROJECT <br /> 5. PROVIDE 2-YEAR WRITTEN WARRANTY AGAINST DEFECTS IN MATERIALS AND <br /> WORKMANSHIP. SPECIFICATIONS <br /> Date: 12.21.2020 <br /> Project Number: RAC19048.0 <br /> Drawn By: - <br /> Sheet Number: <br /> A9 . 50 N <br /> J <br /> Q <br /> H <br /> H <br /> L <br /> m <br /> C/7 <br />