My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0019538
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
23987
>
2900 - Site Mitigation Program
>
SR0019538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:32 PM
Creation date
3/2/2022 11:02:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
CORRESPONDENCE
RECORD_ID
SR0019538
PE
2901
STREET_NUMBER
23987
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
APN
00517007
ENTERED_DATE
6/14/1999 12:00:00 AM
SITE_LOCATION
23987 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
View images
View plain text
CALIFORNIA <br />Water Boards <br />1Q 0mG5g <br />GAVIN NEWSOM <br />`i \I+ocy`I GOVERNOR <br />JARED BLUMENFELD <br />SECRETARY <br />FOR <br />ENVIRONMENTAL PROTECTION <br />Central Valley Regional Water Quality Control Board <br />12 November 2020 <br />Robert Kupka <br />Lodi Airport Corporation <br />P.O. Box 10 <br />Acampo, CA 95220 <br />RECEIVED <br />NOV 2 3 2020 <br />LNVIRONAIENTAL HEALTH <br />DEPARTMENT <br />RESPONSE TO WELL DESTRUCTION WORK PLAN, GOLDEN EAGLE AVIATION/ <br />LODI AIRPORT, 23987 HIGHWAY 99, ACAMPO, SAN JOAQUIN COUNTY, LUST <br />CASE #391083 <br />Central Valley Regional Water Quality Control Board (Central Valley Water Board) staff <br />reviewed the Work Plan for Monitoring and Soil Gas Well Destruction (Work Plan) dated <br />27 October 2020, submitted on your behalf by Steven G. Muir Consulting Geologist & <br />Geophysicist (Muir) for the Golden Eagle/Lodi Airport underground storage tank (UST) <br />petroleum release case at 23987 Highway 99 in Acampo (Site). In the Work Plan, Muir <br />proposes to destroy the remaining Site wells as follows: <br />Type <br />Well <br />Total <br />Screen <br />Destruction Method <br />Depth <br />Interval <br />(ft b s <br />(ft b s <br />V-1 thru V-7 <br />Soil Gas <br />V100 thru V102 <br />6ft <br />-- <br />Hand Auger <br />HA/SG-1 thru <br />HA/SG-7 <br />Ground -water <br />MW -1, MW -2 <br />85 <br />65-85 <br />MonitoringMW-4 <br />Explosives <br />110 <br />90-110 <br />ft bgs= feet below ground surface <br />Central Valley Water Board staff concurs with the scope of work as proposed in the <br />Work Plan. However, San Joaquin County Environmental Health Department (SJCEHD) <br />maintains jurisdictional authority over well destructions in San Joaquin County, so the <br />proposed well destructions must be completed under, and in accordance with, County <br />permits and requirements. By 5 February 2021, please submit a Well Destruction <br />KARL E. LONGLEY SCD, P.E., CHAIR I PATRICK PULUPA, ESO., EXECUTIVE OFFICER <br />11020 Sun Center Drive #200, Rancho Cordova, CA 95670 1 www.waterboards.ca.gov/centralvalley <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).