Laserfiche WebLink
G�� // <br />— �1 GAVIN NEWSOM <br />L/ ,1TJ,/Jj �� l GOVERNOR <br />o Allron n• ,JARED BELD <br />SECRETARY <br />FOR FOP <br />Water Boards ENVIRONMENTAL PROTECTION <br />CENTRAL VALLEY REGIONAL WATER QUALITY CONTROL BOARD <br />31 January 2021 <br />NuStar Terminals Operations Partnership, L.P. <br />19003 H 1-10 West <br />San Antonio, TX 78257 <br />Port of Stockton <br />Jason Cashman <br />Environmental and Regulatory Affairs Manager <br />2201 West Washington Street <br />Stockton, CA 95203 <br />CERTIFIED MAIL <br />7020 0640 0000 7627 4126 <br />CERTIFIED MAIL <br />7020 0640 0000 7627 4133 <br />.RECEIVED <br />FEB 0 4 2021 <br />NOTICE OF APPLICABILITY ENVIRONMENTAL HEALTH <br />WATER QUALITY ORDER 2003-0003-DWQ PERMIT/SEKVICES <br />STATEWIDE WASTE DISCHARGE REQUIREMENTS FOR DISCHARGES TO LAND <br />WITH A LOW THREAT TO WATER QUALITY <br />NUSTAR TERMINALS OPERATIONS PARTNERSHIP, L.P. AND <br />PORT OF STOCKTON, <br />NUSTAR TERMINAL, <br />SAN JOAQUIN COUNTY <br />On 11 January 2021, NuStar Terminals Operations Partnership, L.P. and the Port of <br />Stockton (Dischargers) submitted a Notice of Intent (NOI) to obtain coverage under <br />Water Quality Order 2003-0003-DWQ, Statewide General Waste Discharge <br />Requirements for Discharges to Land with a Low Threat to Water Quality (hereafter <br />General Order) for hydrostatic testing as part of construction activities at the NuStar <br />Terminal. The submittal contains all the information required to evaluate applicability of <br />the General Order; therefore, the NOI is considered complete. Based on the <br />information provided in the NOI, the discharge meets the conditions of the General <br />Order. The discharge is hereby covered under State Water Resources Control Board <br />General Order 2003-0003-DWQ-0218. Please include this number on all <br />correspondence related to this discharge. <br />PROJECT LOCATION AND DESCRIPTION <br />The project is located at the NuStar Terminal at 2941 and 3015 Navy Drive, Stockton in <br />San Joaquin County, as shown on Attachment A. The project consists of facility <br />expansion and upgrades to aide fuel delivery to the facility by ship. The upgrades <br />include the installation of new piping, valves, flanges, and fittings to connect <br />aboveground storage tanks (ASTs) at the tank farm. After the construction upgrades, <br />hydrostatic testing of the new pipelines will occur. <br />KARL E. LONGLEY SCD, P.E., CHAIR I PATRICK PULUPA, ESQ., EXECUTIVE OFFICER <br />11020 Sun Center Drive #200, Rancho Cordova, CA 95670 1 www.waterboards.ca.gov/centralvalley <br />