My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 9:44:16 AM
Creation date
3/3/2022 9:49:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES [X] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the " Site Health and Safety Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and /or replacements . If repairing a component , describe <br /> how this will be done . ( If adding piping , UDC 's , or other UST equipment , or performing tank top upgrade , <br /> use the UST Installation Application pages 4- 8 as necessary for a timely plan review) : <br /> Replacing 87 drop tube . <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third -party approval) : <br /> EBW Defender Drop tube PN - 708592902 . <br /> 5 . Decontamination Procedures : N /A <br /> a . Will piping be decontaminated prior to removal ? YES [ ] NO [ ] <br /> b . Identify contractor performing decontamination : <br /> Name Phone ( ) <br /> Address City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.