Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by p] Manufacturer Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ✓❑ Hydrostatic <br /> Test Equipment Used: Incon Sump Test System <br /> Sump/UDC ID T1 87A-Turbine T2 87B-Turbine 91 -Turbine Vent Box-Vent <br /> Sump Manufacturer <br /> Sump Depth (inches) 67" 67" 67" 32" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 28" 23" 23" 16" <br /> (inches) <br /> Test Start Time 08:30am 08:30am 08:30am 08:30am <br /> Initial Reading 5.5519 4.4364 3.9735 5.0094 <br /> Test End Time 08:45am 08:45am 08:45am 08:45am <br /> Final Reading 5.5510 4.4364 3.9748 5.0090 <br /> Change in Reading -0.0009 0.0000 0.0013 -0.0004 <br /> PasslFail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results Pass Pass Pass Pass <br /> Sump/UDC ID 1/2 - UDC 3/4 - UDC 5/6 - UDC 7/8 - UDC <br /> Sump Manufacturer Environ Environ Environ Environ <br /> Sump Depth (inches) 36" 36" 30" 30" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:19am 10:19am 09:52a 09:52am <br /> Initial Reading 2.8746 3.3866 4.5645 5.4699 <br /> Test End Time 10:34am 10:34am 10:07am 10:07am <br /> Final Reading 2.7902 3.3870 4.5645 5.4698 <br /> Change in Reading -0.0844 0.0004 0.0000 -0.0001 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results Fail Pass Pass Pass <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />