Values and Assumptions: <br />1= 159,750 gals/yr = total WW/yr = 21,357 cu ft = 0.146 in/yr <br />40.36 Ac x 43,560 sq ft/Ac x (1 ft/12 in) <br />Nw = 45 mg N/L <br />d = 30% <br />R = 8.82 in/yr. <br />Nb = Assumed to be 0.1 ppm NO3-N <br />0.146 in/yr (45 mg N/L) (1- 0.30) + (8.82 in/yr • x 0.1 mg/L) <br />Nr = • (0.146 in/yr + 8.82 in/yr) <br />Nr = 0.61 ppm as nitrate-nitrogen (NO3-N) or 2.7 ppm as nitrate (NO3) <br />IV. OWTS DESIGN SPECIFICATIONS AND OPERATIONAL PURVIEW <br />To adequately design the OWTS for this project, effluent flow volumes must be estimated as <br />accurately as possible. As noted on the Site Plans, fixtures to be installed in the new office <br />building include two restrooms, each with a toilet and lavatory, two sinks (kitchen and mop) and <br />a dishwasher. <br />Historically, a Water Use Computation Factor Table referencing gallons per person per day for <br />each type of establishment was used to determined wastewater flow volumes. The Building <br />Occupancy Load Table for the office building indicates a total of 48 people could occupy the <br />building. However, an indeterminable fraction of this total will occupy the building since <br />occupancy of the Foyer, Conference Room and Break Room could constitute 41 people of the <br />48 potential total occupants. <br />Since water flow volumes from contemporary plumbing fixtures is much lower than years prior, <br />daily wastewater volumes for this project will be based on an assumed maximum fixture usage, <br />as calculated below. Wastewater flow volumes from the office building Restrooms will be <br />based on four flushes of each toilet per hour, daily use of the dishwasher, and 10 gals sink use: <br />1.5 gals flush + 0.5 gals hand washing = 2 gals/use x 4 flushes/hr x 10 hr/workday = 80 gpd x 2 Restrooms = 160 gpd <br />160 gpd + 5 gpd (dishwasher) + 10 gpd (sinks) = 175 gpd = Average Daily Flow (ADF) from Office Building. <br />To maintain a comparatively small effluent disposal area footprint, a filter bed structure is proposed, as calculated: <br />1,200 Base Tank Capacity (BTC) + 175 ADF =1,375 gals. <br />1,375 gals x 0.225 (Sandy Loam Soil Factor) = 310 Lineal Ft of Leachline (LFLL) <br />310 LFLL x 3 (Filter Bed Soil Factor) = 928 sf Filter Bed (30 ft x 30 ft square). <br />A drill rig was used to determine the underlying soil profile and drill soil percolation test borings <br />in the approximate location of the proposed filter bed. The 24 ft exploratory boring was <br />converted to a deep perc test and two shallow percolation tests were drilled for a total of three <br />perc tests conducted. The observed soil profile consisted of the following strata illustrated in <br />Table 1 with the perc test results and application rates for the three borings in Table 2: <br />Page -3- J <br /> <br />Chesney Consulting