My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
400
>
2800 - Aboveground Petroleum Storage Program
>
PR0522005
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2022 1:40:43 PM
Creation date
3/7/2022 10:29:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0522005
PE
2832
FACILITY_ID
FA0010965
FACILITY_NAME
KNIFE RIVER
STREET_NUMBER
400
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14712001
CURRENT_STATUS
01
SITE_LOCATION
400 S LINCOLN ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Log of Plan Review and Amendments - 40 CFR 112 .5 (b) <br /> Non-Technical Amendments <br /> • Non-technical amendments are not certified by a Professional Engineer. <br /> • Examples of changes include, but are not limited to, phone numbers, name changes, or any non-technical <br /> text change(s). <br /> Technical Amendments <br /> • ` Technical amendments are certified by a Professional Engineer (§ 112.5(c)) . <br /> • Examples of changes include, but are not limited to, commissioning or decommissioning containers; <br /> replacement, reconstruction , or movement of containers; reconstruction, replacements, or installation of <br /> piping systems; construction or demolition that might alter secondary containment structures; changes of <br /> product or service; or addition/deletion of standard operation or maintenance procedures related to <br /> discharge prevention measures. It is the responsibility of the facility to determine, and confirm with the <br /> regulatory authority as necessary, what constitutes a technical amendment. The preamble of the rule <br /> states that an amendment is required only "when there is a change that materially affects the facility's <br /> potential to discharge oil" (67 FR 47091 ). <br /> • An amendment made under this section will be prepared within six (6) months of the change and <br /> implemented as soon as possible but not later than six (6) months following preparation of the <br /> amendment. <br /> • Technical Amendments affecting various pages within the plan can be P. E. certified on those pages, <br /> certifying those amendments only, and will be documented on the log form below. <br /> Management Review <br /> • Management will review this SPCC Plan at least each five (5) years and document the review on the <br /> form below (§ 112.5(b)) . <br /> Amend Description of <br /> Review/Amend Signature Plan Affected P.E. Certification <br /> Date (Specify) (will/will Review Page(s) (YIN) <br /> not) Amendment <br /> 01 /17/2012 Y Will Insp by D. K. All Y <br /> Barber <br /> 07/07/2021 Y Will Update Tanks Multiple Y <br /> 3-24-2022 Y Will SJC°Elro Inspection, 3-1- Multiple N <br /> 2022 Violation Com fiuP <br /> ance <br /> KNIFE RIVER-STOCKTON PLANT <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.