Laserfiche WebLink
6 . 0 Overview of Facility Oil Storage - 40 CFR 112 . 7 (a )(3 ) ( i ) <br /> Please reference Table 1 , "SUMMARY OF OIL STORAGE" at the plant site. Oil storage <br /> locations are illustrated on Figure 2, "SITE PLAN ." <br /> Table 1 <br /> SUMMARY OF OIL STORAGE <br /> KNIFE RIVER — NORTHERN CALIFORNIA READY MIX DIVISION — STOCKTON PLANT <br /> Container Capacity Product Location Containment <br /> al. <br /> Concrete secondary <br /> AST 102000 Diesel Fuel Fuel Island containment structure <br /> = 11 , 968 Gallons <br /> AST 275 Motor Oil Inside Shop Double Walled Tank <br /> AST 275 Hydraulic Oil Inside Shop Double Walled Tank <br /> AST 275 Used Oil Inside Shop Double Walled Tank <br /> Drum 8-14 @ 55 Misc. Oil Shop/Container Inside Shop and Container south <br /> Of Diesel AST-Containment pallet <br /> PG&E 100 (est) Heat Transfer Oil Plant Detention/Containment <br /> Transformer Pond <br /> 6 . 1 Discharge Management - 40 CFR 112. 7 (a) (3) <br /> Discharge Management (§112. 7(a)(3)(ii-vi)] <br /> ( 1 ) Discharge Prevention Procedures (Loading & Unloading) (§112. 7(a)(3)(H)] <br /> Drivers of trucks delivering petroleum products are subject to California's Commercial <br /> Driver License (CDL) requirements, including hazardous material endorsement, and <br /> have documented knowledge of safe handling of these materials. Truck unloading <br /> procedures are presented as Appendix F, and are consistent with API Recommended <br /> Practice 1007 . <br /> (2) Discharge or Drainage Controls (§112. 7 (a)(3)(iii)] <br /> Single wall diesel fuel AST is within covered concrete walled containment. Basin area <br /> is periodically inspected for water. If water is found it is generally allowed to evaporate. <br /> Clean contained water may be drained to the ground only after verifying there are no <br /> hydrocarbons in contained water. Discharge must be recorded . The double walled <br /> oil/waste oil ASTs have integral secondary containment. <br /> KNIFE RIVER-STOCKTON PLANT <br /> 6 <br />