My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
400
>
2800 - Aboveground Petroleum Storage Program
>
PR0522005
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2022 1:40:43 PM
Creation date
3/7/2022 10:29:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0522005
PE
2832
FACILITY_ID
FA0010965
FACILITY_NAME
KNIFE RIVER
STREET_NUMBER
400
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14712001
CURRENT_STATUS
01
SITE_LOCATION
400 S LINCOLN ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 . 0 Oil Spill Contingency Plan - 40 CFR 112 . 7 ( d ) <br /> The procedures outlined in Appendices: C. INCIDENT REPORT, D. SPILL RESPONSE DUTY <br /> CARD — OIL HANDLING EMPLOYEES, and E. SPILL RESPONSE DUTY CARD — <br /> INCIDENT COMMANDER will be implemented in the event of an oil spill at the KNIFE RIVER <br /> — NORTHERN CALIFORNIA READY MIX DIVISION — STOCKTON PLANT . They are part <br /> of this Spill Plan ; they address KNIFE RIVER CORPORATION'S organizational structure for <br /> spill response, the response steps to be taken in responding to an oil or hazardous substance <br /> release , and spill notification and reporting procedures. <br /> Spill Plan Location [40 CFR 112. 7(e)] <br /> One copy of this SPCC plan is maintained at KNIFE RIVER — NORTHERN CALIFORNIA <br /> READY MIX DIVISION — STOCKTON PLANT along with other environmental documents <br /> such as the hazardous material business plan , training records, and Material Safety Data <br /> Sheets . A second copy of the SPCC plan is maintained by the California Environmental <br /> Manager, KNIFE RIVER CORPORATION office at 655 W Clay Street, Stockton , CA 95206. <br /> 8 . 0 Inspections and Records - 40 CFR 112 . 7 (e) <br /> The site is formally inspected and documented by a company employee at least monthly. <br /> Copies of the monthly inspection reports are found at the back of this SPCCP. A Monthly <br /> Inspection Checklist form is provided in Appendix B. <br /> During the monthly inspection, all tanks, containment structures; valves, pipes, gauges and <br /> other equipment are inspected , inspection reports are kept on site for at least three years. <br /> KNIFE RIVER-STOCKTON PLANT <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.