My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TILLIE LEWIS
>
1477
>
2800 - Aboveground Petroleum Storage Program
>
PR0523160
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 8:53:28 AM
Creation date
3/7/2022 10:35:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0523160
PE
2832
FACILITY_ID
FA0010602
FACILITY_NAME
WILLIAMS TANK LINES
STREET_NUMBER
1477
STREET_NAME
TILLIE LEWIS
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16336003
CURRENT_STATUS
01
SITE_LOCATION
1477 TILLIE LEWIS DR
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN ,,] DAQ U I <br /> N Environmental Health Department <br /> C0uT IV <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> WILLIAMS TANK LINES 1 1477 TILLIE LEWIS DR, STOCKTON February 24, 2022 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 706 CFR 112.8(c)(2)Failed to provide and maintain adequate secondary containment for bulk storage tanks. <br /> OBSERVATION: The facility failed to provide and maintain secondary containment for bulk storage tank <br /> installations sufficient to hold the capacity of the largest container, including adequate freeboard for precipitation. <br /> Two 500-gallon tanks (identified as single walled in the current SPCC plan)were observed inside the shop area <br /> with small curbing (3-4" high)around them and without adequate sized secondary containment. <br /> REGULATION GUIDANCE: (c)(2)Construct all bulk storage tank installations(except mobile refuelers and other <br /> non-transportation-related tank trucks)so that you provide a secondary means of containment for the entire <br /> capacity of the largest single container and sufficient freeboard to contain precipitation.You must ensure that diked <br /> areas are sufficiently impervious to contain discharged oil. Dikes, containment curbs, and pits are commonly <br /> employed for this purpose.You may also use an alternative system consisting of a drainage trench enclosure that <br /> must be arranged so that any discharge will terminate and be safely confined in a facility catchment basin or <br /> holding pond. <br /> CORRECTIVE ACTION: Immediately provide and maintain adequate secondary containment for the following bulk <br /> storage tanks:two 500-gallon tanks located inside the shop area. Submit proof of correction to the EHD. <br /> This is a Class II violation. <br /> 711 CFR 112.8(c)(6)Plan failed to adequately discuss procedures to test or inspect each container for integrity. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan does not adequately discuss <br /> procedures to test or inspect each aboveground container for integrity in accordance with industry standards and <br /> does not address the annual inspection frequency per the industry standards. <br /> REGULATION GUIDANCE: (c)(6)Test or inspect each aboveground container for integrity on a regular schedule <br /> and whenever you make material repairs.You must determine, in accordance with industry standards,the <br /> appropriate qualifications for personnel performing tests and inspections, the frequency and type of testing and <br /> inspections,which take into account container size, configuration, and design (such as containers that are: <br /> shop-built,field-erected, skid-mounted, elevated, equipped with a liner, double-walled, or partially buried). <br /> Examples of these integrity tests include, but are not limited to:visual inspection, hydrostatic testing, radiographic <br /> testing, ultrasonic testing, acoustic emissions testing, or other systems of non-destructive testing. You must keep <br /> comparison records, and you must also inspect the container's supports and foundations. In addition,you must <br /> frequently inspect the outside of the container for signs of deterioration,discharges, or accumulation of oil inside <br /> diked areas. Records of inspections and tests kept under usual and customary business practices satisfy the <br /> record keeping requirements of this paragraph. <br /> CORRECTIVE ACTION: Ensure that the SPCC Plan adequately discusses facility's procedures to test and inspect <br /> aboveground/bulk storage containers in accordance with all applicable industry standards. This discussion must <br /> include, but not be limited to: 1. On a regular schedule. 2.After material repairs are made. 3. By qualified <br /> personnel.4.The frequency and type of testing and inspections based on container size, configuration, and design. <br /> Provide proof of correction to the EHD. <br /> This is a repeat violation, Class II. <br /> FA0010602 PR0523160 SCO01 02/24/2022 <br /> EHD 28-01 Rev.12/06/2021 Page 13 of 16 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.