Laserfiche WebLink
Williams Tank Lines— Stockton, CA <br /> SPCC Plan Review 40 CFR 112.5(a)(b) <br /> Williams Tank Lines will complete a review and evaluation of the application of their <br /> SPCC plan and the facility operations at least once every five years from the date of <br /> implementation or upon any significant change or modification to the operations. As a result of <br /> the review or evaluation modifications to the SPCC Plan, Williams Tank Lines will make the <br /> necessary amendments within six months of the findings. If new and field proven technology has <br /> been developed and is found to be suitable for the facility operation at the time of review and the <br /> new technology is a more effective prevention and control that can significantly reduce the <br /> likelihood of a discharge as described in §112.l(b) from the facility. Williams Tank Lines will <br /> implement any amendment as soon as possible, but no later than six month following preparation <br /> and adoption of any amendment. Williams Tank Lines will document their completion of the <br /> review and evaluation, and will sign a statement as to whether the SPCC Plan will or will not be <br /> amended, in Appendix K of the SPCC Plan. <br /> Management Approval <br /> Full approval is extended by the management of Williams Tank Lines at a level of <br /> authority to commit the necessary resources to implement this SPCC Plan. <br /> i <br /> Operations or Managements Signature Date <br /> Print Name of responsible party <br /> >>, e s, _ _ 6 <br />