My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TILLIE LEWIS
>
1477
>
2800 - Aboveground Petroleum Storage Program
>
PR0523160
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 8:53:28 AM
Creation date
3/7/2022 10:35:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0523160
PE
2832
FACILITY_ID
FA0010602
FACILITY_NAME
WILLIAMS TANK LINES
STREET_NUMBER
1477
STREET_NAME
TILLIE LEWIS
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16336003
CURRENT_STATUS
01
SITE_LOCATION
1477 TILLIE LEWIS DR
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Williams Tank Lines— Stockton, CA <br /> SPCC Plan Review 40 CFR 112.5(a)(b) <br /> Williams Tank Lines will complete a review and evaluation of the application of their <br /> SPCC plan and the facility operations at least once every five years from the date of <br /> implementation or upon any significant change or modification to the operations. As a result of <br /> the review or evaluation modifications to the SPCC Plan, Williams Tank Lines will make the <br /> necessary amendments within six months of the findings. If new and field proven technology has <br /> been developed and is found to be suitable for the facility operation at the time of review and the <br /> new technology is a more effective prevention and control that can significantly reduce the <br /> likelihood of a discharge as described in §112.l(b) from the facility. Williams Tank Lines will <br /> implement any amendment as soon as possible, but no later than six month following preparation <br /> and adoption of any amendment. Williams Tank Lines will document their completion of the <br /> review and evaluation, and will sign a statement as to whether the SPCC Plan will or will not be <br /> amended, in Appendix K of the SPCC Plan. <br /> Management Approval <br /> Full approval is extended by the management of Williams Tank Lines at a level of <br /> authority to commit the necessary resources to implement this SPCC Plan. <br /> i <br /> Operations or Managements Signature Date <br /> Print Name of responsible party <br /> >>, e s, _ _ 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.