My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
532
>
1600 - Food Program
>
PR0162092
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 1:13:49 PM
Creation date
3/7/2022 2:16:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0162092
PE
1625
FACILITY_ID
FA0002914
FACILITY_NAME
TACO BELL #3560
STREET_NUMBER
532
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08152043
CURRENT_STATUS
01
SITE_LOCATION
532 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CONCRETE MASONRY UNIT : <br /> i <br /> 1. CONCRETE BLOCK UNITS SHALL CONFORM TO ASTM C90-75 GRADE N OR BETTER fm' = 1500 PSI MEDIUM <br /> WEIGHT. <br /> 2. MORTAR SHALL BE BY VOLUME 1-PART PORTLAND CEMENT, 1/4 TO 1/2 PART HYDRATED LIME OR LIME PUTTY, <br /> 2-1/2 TO 3 TIMES VOLUME OF CEMENT AND LIME OF DAMP LOOSE AGGREGATE. 2" CUBES SHALL TEST 2000 <br /> 0 <br /> PSI IN 28 DAYS. ICA <br /> Uj <br /> F o 3. GROUT SHALL BE BY VOLUME 1 <br /> CO -PART PORTLAND CEMENT, 3 PARTS OF SAND, 1/10 PART LIME (OPTIONAL). <br /> CO TWO PARTS OF PEA GRAVEL MAY BE USED WHERE THE LEAST CLEAR CELL DIMENSION IS 4". NOT MORE THAN <br /> Of <br /> 5% OF THE PEA GRAVEL SHALL PASS THE NO. 8 SIEVE AND 100% SHALL PASS THE 3/8" SIEVE. MINIMUM <br /> w o STRENGTH: 2000 PSI. Igig <br /> o z <br /> O <br /> a 4. REINFORCING STEEL SHALL BE THE SAME AS NOTE NO. 3 UNDER 'CONCRETE'. <br /> zof <br /> a ¢ <br /> F,W <br /> co <br /> 5. LAP ALL BARS 40 BAR DIAMETERS. <br /> w� <br /> Z Z6. DRILL THRU STEEL COLUMNS AND BEAMS TO PASS REBAR. A� ff <br /> ~0 6a. NO OPEN-END BLOCK SHALL BE USED UNLESS APPROVED BY PROJECT DESIGN ENGINEER. V!V{� al"GIIItCGtUi"C <br /> w Design - Planning - Interiors <br /> 7. BEFORE BLOCK IS PLACED ON CONCRETE, THOROUGHLY CLEAN CONCRETE OF ALL LATENCIES AND ALL LOOSE 637 5th Avenue San Rafael, CA 94901 <br /> o m MATERIAL. ROUGHEN AS IN A CONCRETE CONSTRUCTION JOINT. 415-451-2500 415-451-2595 fax <br /> a www.vmarch.com <br /> W o 8. CONCRETE BLOCK MASONRY SHALL BE BUILT TO PRESERVE THE UNOBSTRUCTED CONTINUITY OF THE VERTICAL (N) BOLLARDS, <br /> o a CELLS TO BE FILLED. WALLS & CROSS WEBS FORMING SUCH CELLS TO BE FILLED SHALL BE FULL BEDDED IN \ \ SEE DET. 18/ A0.1 VMI J 0 B NUMBER <br /> o MORTAR TO PREVENT LEAKAGE OF GROUT. ALL HEAD OR END JOINTS SHALL BE SOLIDLY FILLED WITH MORTAR <br /> Uj FOR A DISTANCE IN FROM THE FACE OF THE WALL OR UNIT NOT LESS THAN THE THICKNESS OF THE \ \ 5x5"x1/4" HSS POST 200 0 <br /> co LL LONGITUDINAL FACE SHELLS. BOND SHALL BE PROVIDED BY LAPPING SUCCESSIVE COURSES OR BY EQUIVALENT \ \ 4 <br /> ILO <br /> MECHANICAL ANCHORAGE. \ \N ¢"SS 1" HOLE TO KEEP GATES OPEN AT 95 <br /> \ ��NF <br /> a 0LL1 9. CLEANOUTS OPENINGS SHALL BE PROVIDED AT THE BOTTOMS OF ALL CELLS TO BE FILLED AT EACH LIFT OR \ FRpM ANGLE PER CITY STANDARDS �����,� AIR? j� <br /> W F- POUR OF GROUT WHERE SUCH LIFT OR POUR OF GROUT IS IN EXCESS OF 4-0 OF HEIGHT. ANY \ TRgSy <br /> m OVERHANGING MORTAR OR OTHER OBSTRUCTION OR DEBRIS SHALL BE REMOVED FROM INSIDE OF SUCH CELLS. <br /> ,n^ fir <br /> 01 Uj THE CLEANOUTS SHALL BE SEALED AFTER INSPECTION AND BEFORE GROUTING. \ \UF TO SFJ G r V I <br /> o 10. VERTICAL REINFORCING SHALL BE HELD IN POSITION AT TOP AND BOTTOM AND AT INTERVALS NOT EXCEEDING \ \ \FSF/ryjFRc * x , <br /> 192 BAR DIAMETERS. NFw 3/4, \ E?pR <br /> No. <br /> LL U \ REN. 10/31/23 <br /> o t 11. ALL CELLS CONTAINING REINFORCING OR BOLTS SHALL BE FILLED SOLIDLY WITH GROUT. ��TFR�/ \ x a ° ❑ ❑ ❑ <br /> LU <br /> T ~ <br /> Z o 12. WHEN GROUTING IS STOPPED FOR ONE HOUR OR LONGER, HORIZONTAL CONSTRUCTION JOINTS SHALL BE F Tp T�Sy FNC \ \ \ d - _ - - -� ° ° 4 ° ° d ° ° op CALZ�� <br /> FORMED BY STOPPING THE POUR OF GROUT 1-1/2" BELOW THE TOP OF THE UPPERMOST UNIT. �pSUF \ 4 • - -� - ° ° 3l�IJ YTfl390fl9 ONIT21X3 <br /> s a 13. USE STRIPS OF METAL LATH TO CLOSE OFF CELLS THAT ARE NOT TO BE FILLED. DO NOT USE ANY PAPER <br /> In o PRODUCT TO CLOSE CELLS. \° 18 GUAGE PAINTED META1 d ° 4 <br /> co \ GATE (BOX RIB) ° ° 4 ° ° <br /> c CD <br /> 14. THOROUGHLY CLEAN OF MORTAR ALL CELLS AND BOND BEAMS BEFORE GROUTING. `° ° ° 4 ° ° d ° <br /> o< \ ° 4 u\ d ° ° d <br /> W w 15. PLACE ALL HORIZONTAL BARS IN BOND BEAM UNITS. WHEN TWO BARS ARE USED STAGGER LAPS AND SPREAD \° 4 ° ° d ° ° ° �° 4 d <br /> J= AS FAR APART AS POSSIBLE. \ 4 ° d d ° 6 THICK P.C.C. SLAB <br /> ° \ 4 ° ° °d 4 ° W/ #4 AT 16"c. EA. WAY; <br /> m ° ° d d ° \ a 4 ° d d ad ° ° ° OVER 4" CRUSHED ROCK <br /> 16. USE OPEN END BLOCK FOR ALL STACK BOND CONSTRUCTION. ° 4 ° d d SLOPE TO DRAIN <br /> 0 0 17. EACH VERTICAL BAR IN WALLS, PIERS, COLUMNS, ETC. SHALL LAP 40 DIAMETERS WITH A DOWEL TO WITHIN 3" ° 4 4 \ ° \ ° ° ° ° ° ° ° 4 <br /> OF THE BOTTOM OF THE FOUNDATION. DOWELS SHALL BE STRAIGHT AND PLUMB. 1 E ° d \ d ° d <br /> LU o (N) SS LINE FROM AND (N) WATER LINE TO TRASH TE2 ° d ° ° ° 4d d °4 <br /> Z 18. ALIGN ALL VERTICAL BARS AND DOWELS AT THE CENTERLINE OF THE WALL, WHEN SINGLE LAYER OF ENCLOSURE, SEE SHEET TE-4 FOR PLUMBING DETAILS o 1" HOLE FOR GATE CANE 4 ° �. ° I ° ° ° 4° <br /> co01 REINFORCING IS USED UNLESS OTHERWISE NOTED. ° BOLT °° ° <br /> CONCRETE : ° � u a ° ° ° ° d \ \ \ ° 4 0 c:) 4 °° ° °d ° °d <br /> w ° I <br /> LU <br /> 1. CONCRETE SHALL BE HARD ROCK CONCRETE (5 SACK CEMENT PER CU YD MIN.) AND MEET THE FOLLOWING 4 <br /> MINIMUM ULTIMATE COMPRESSIVE STRENGTHS AT 28 DAYS: ° d ° TE2 <br /> CO o MIN. STRENGTH AGGREGATE SLUMP, 4 ° ° B d d 4 ° 4 \ \° <br /> o LOCATION 28 DAYS PSI SIZE-INCHES INCHES TOLERANCE <br /> 012 <br /> SLAB ON GRADE 3,000 1" X #4 3-1/2" + 1/2" d ° 4 ° ° ° ° ° d 4 <br /> Q w Q FOUNDATIONS 3,000 1" X #4 3-1/2" + 1/2" ° ° 4 ° ° ° ° 4° ° ° o <br /> M O o ° ° d ° d RECORD DATES <br /> ti o LL 2. CONCRETE MIX DESIGN AND TESTING SHALL MEET THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS. CEMEN- ° ° ° 4 d ° ° ° TE2 4 <br /> 6 o TO BE IN ACCORDANCE WITH ASTM C 150 TYPE II. VERIFY MINIMUM CONCRETE STRENGTH AND CEMENT TYPE WITI d ° ° ° 4 ° d ° ° g DD SUBMITTAL <br /> CN W W ° ° d ° BLDG.SUBMITTAL 2/4/2022 <br /> THE SULFATE REQUIREMENTS OF THE CBC 19-A-3. ° ° ° ° <br /> C) W CO ° 4 ° 4 ° ° ° d ° 122 ° 4 � o °4 ° (TYP?) ° BID SET - <br /> W 3. REINFORCING STEEL SHALL CONFORM TO ASTM A-615, GRADE 60 FOR #5 AND LARGER BARS AND GRADE 40 FC r4 ° Ia ° d 4 ° ° CONTRACT SET <br /> c Z o #4 AND SMALLER. STEEL SHALL BE KEPT CLEAN AND FREE OF RUST. d ° ° ° ° ° ° d d ° ° ° 4 <br /> REVISIONS <br /> m z o 4. SLABS, BEAMS, WALLS AND OTHER CONCRETE SHALL BE KEPT CONTINUOUSLY WET FOR 48 HOURS, AFTER ° 4 ° d° d d I ° ° ° ° d ° ° <br /> c'B o m PLACEMENT, AND SHALL BE KEPT DAMP FOR 7 DAYS AFTER PLACEMENT. SLABS SHALL HAVE CURE/SEALER �i ° I d° ° d° I 4 ° ° 1Q 2/112022 TB Corp Review <br /> Z APPLIED IMMEDIATELY AFTER FINISHING IF OTHER FINISHES ARE NOT AFFECTED. WHEN CURE SEALER CAN NOT BE N ° d TE2 A d° ° ° <br /> WAPPLIED, SLAB SHALL BE KEPT CONTINUOUSLY WET OR COVERED WITH CURING PAPER. CURE SHALL BE OF A TY 4 ° d 4 ° ° 4 d° ° <br /> CCD 10,-0 THAT WILL NOT BE DETRIMENTAL TO SEALERS TO BE APPLIED LATER. ( P. <br /> ° d ° ° I ° ° ° ° 4 <br /> z Wo ° ° ° d <br /> z d ° <br /> d 4 d ° <br /> 0 0o MISCELLANEOUS : 4 ° 4 ° d d ° ° ° 4 <br /> m a Z 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE, U.O.N. o ° ° ° 4 a ° °° °° ° d° ° 4 ° ° PERIMETER <br /> 0 Z o 1 ° d d ° ° 4 d °° 6 HIGH CONCRETE CURB 401 FOOTING <br /> o 2. DRAWINGS SHALL NOT BE SCALED. ALL DIMENSIONS AND FIT SHALL BE DETERMINED AND VERIFIED BY THE ° ° ° d ° ° d° <br /> Ly CONTRACTOR PRIOR TO COMMENCING WORK. 4 ° ° ° ° ° 4 ° ° ° <br /> w ° <br /> oQ a ° <br /> ~l W K 3. DETAILS NOT FULLY OR SPECIFICALLY SHOWN SHALL BE OF SAME NATURE AS OTHER SIMILAR CONDITIONS. ° ° ° 4 ° ° ° d ° 4 ° ° 16 CLIENT <br /> d <br /> Fj CD z 4. SEE SITE PLAN FOR COORDINATION WITH WALKS, CURBS, ACCESSIBLE RAMPS & OTHER MISCELLANEOUS SITE WOR ° ° ° 4 4 d ° ° ° ° °4 ° PRB MANAGEMENT INC <br /> I W a _� <br /> ° ° ❑ V L C.M.U. BLOCK 4709 Mangels Blvd. <br /> c o w 5. COORDINATE FOUNDATION & SLAB LAYOUT WITH OTHER TRADES. ° ° Fairfield,CA 94534 <br /> U <br /> SITE*3560 <br /> LLENTITY#: <br /> il0 SOILS : <br /> T.S. POST, REFER TO <br /> �l o= 1. SOILS REPORT NOT REQUIRED AS FOUNDATIONS ARE DESIGNED FOR A BEARING PRESSURE OF 1000 PSF DWG. TE-3 , TYP. PROJECT <br /> M ~ TACO BELL <br /> co <br /> � 0 0 2. FOUNDATION DESIGN BASED ON THE LATEST 2019 CBC 4"0 CONCRETE FILLED <br /> o co ao <br /> M W cr 8'-0" CONCRETE APRON STEEL BOLLARD, (TYP.) 15'-0" (MAX.) 532 WEST HAMMER LN <br /> Ll 0 3. ALL FOOTING EXCAVATIONS SHALL BE AS NEAT AS PRACTICABLE. OVER-EXCAVATIONS IN DEPTH SHALL BE FILLED STOCKTON, CA. 95210 <br /> m Z" WITH CONCRETE, AND IN WIDTH MAY BE FILLED WITH LEAN CONCRETE OR COMPACTED APPROVED BACKFILL. <br /> � a z APN#000-000-000 <br /> E <br /> mo <br /> = z w 4. ALL LOOSE SOILS SHALL BE REMOVED FROM EXCAVATIONS PRIOR TO PLACEMENT OF REINFORCING OR CONCRETE, <br /> U) o,, <br /> W J <br /> LU Q <br /> Q <br /> Iz� <br /> Z� <br /> Q Q W <br /> �z ENDEAVOR <br /> W <br /> w SUCCESSOR M 11/13/2020 <br /> a W <br /> 0 <br /> ii <br /> �l Z= NORTH <br /> CD <br /> CD Uza J TRASH ENCLOSURE <br /> C> <br /> a� <br /> 0-co <br /> a) z Z FOUNDATION PLAN <br /> E <br /> W� <br /> 0) 2CO <br /> Uj <br /> jw <br /> cu z� <br /> 0,0 <br /> m �6z <br /> z <br /> W <br /> co o� <br /> C6 0 TE - 1 <br /> `u N OTFS 2 FOUNDATION PLAN I <br /> . �� <br /> W SCALE:1/2"=1'-0" <br />
The URL can be used to link to this page
Your browser does not support the video tag.