CD CONDENSATE DRAIN
<br /> G G GAS �►
<br /> CW COLD WATER
<br /> HW HOT WATER
<br /> W WASTE T T----
<br /> I
<br /> ——— — —— V VENT
<br /> G EG GAS
<br /> o ° e J,
<br /> ECW COLD WATER ° e
<br /> 10
<br /> e
<br /> EHW HOT WATER07
<br /> \ rt
<br /> EW WASTE \
<br /> OU_
<br /> zof
<br /> am ------------ EV VENT
<br /> w�
<br /> �2o LEGEND N.T.S. D
<br /> Zz
<br /> 2 w VM1 arckitecture
<br /> w'0 1. ALL PLUMBING WORK& MATERIALS TO BE INSTALLED IN ACCORDANCE WITH ALL Design - Planning - Interiors
<br /> Ji APPLICABLE STATE&LOCAL CODES®ULATIONS. CONTRACTOR TO OBTAIN ALL
<br /> o 0 APPROVALS REQUIRED FROM REGULATING AGENCIES BEFORE STARTING WORK.ALL 637 5th Avenue San Rafael, CA 94901
<br /> = m PLUMBING WORK&MATERIALS TO MEET THE REQUIREMENTS OF THE LATEST EDITION OF THE 415-451-2500 415-451-2595 fax
<br /> o CALIFORNIA PLUMBING CODE. OBTAIN &PAY FOR ALL PERMITS, FEES & INSPECTIONS www.vmarch.com
<br /> o a REQUIRED BY GOVERNING AUTHORITIES. I ® VMI JOB NUMBER
<br /> 2. PRIOR TO COMMENCING WORK ON THIS PROJECT, CONTRACTOR SHALL VERIFY DEPTH,Lu
<br /> Q
<br /> o LL SIZE, LOCATION AND CONDITION OF ALL EXISTING UTILITIES IN FIELD BEFORE STARTING 20049
<br /> ILO
<br /> WORK. SHOULD CONDITIONS EXIST OTHER THAN THOSE INDICATED WHICH WOULD CAUSE
<br /> THE DESIGN TO BE ALTERED, CONTRACTOR SHALL NOTIFY OWNER IMMEDIATELY.
<br /> � d AIR?
<br /> 3. CONTRACTOR SHALL COORDINATE INSTALLATION OF PLUMBING WORK WITH ALL OTHER r I
<br /> o m TRADES SO AS TO AVOID UNNECESSARY DELAY OR INTERFERENCES. CONTRACTOR TO NAR
<br /> F Z:) D
<br /> ,- I 33 3/4" y ��
<br /> a COREVIEW ARCHITECTURAL AND EQUIPMENT SHEETS.
<br /> o w \ r Vl
<br /> a m0 CO
<br /> 4.WATER PIPING TO BE TYPE L COPPER MATCHING EXISTING, TYPE K BELOW FLOOR. J At r o
<br /> ow.
<br /> x No. C17928
<br /> LL U) 5.WASTE AND VENT PIPING TO BE CAST IRON OR ABS DWV WHERE ALLOWED.
<br /> LU �- I O REN. 10/31/23
<br /> 6. CONDENSATE DRAIN PIPING TO BE COPPER. HORIZONTAL PIPING ABOVE CEILING TO BELU
<br /> Z o INSULATED.
<br /> <0 I- 33 Ccq 177 71
<br /> ALZ��
<br /> o w 7NEW/. GAS PIPING TO BE SCHEDULE 40 BLACK STEEL, GALVANIZED ON ROOF.
<br /> co 11
<br /> In = 8. NEW WASTE PIPING TO BE RUN AT 2% MINIMUM SLOPE.
<br /> sc -
<br /> o"
<br /> >z 9. CONDENSATE DRAIN PIPING TO BE RUN AT 1% MINIMUM SLOPE.
<br /> o§
<br /> LUL,= -- — -
<br /> LU w 10. NEW HOT WATER PIPING TO BE WRAPPED WITH 1"THICK JACKETED FIBERGLASS ® O
<br /> = INSULATION. PROVIDE INSULATION SHIELDS AT PIPE HANGERS AND SUPPORTS. INSULATION . O
<br /> I--
<br /> FOR HOT WATER PIPING TO COMPLY WITH THE REQUIREMENTS OF SECTION 120.3 OF THE 2016
<br /> Z � CALIFORNIA ENERGY CODE.
<br /> o 1
<br /> U) _
<br /> o Z 11. INSTALL SHUTOFF VALVES ON ALL HOT&COLD WATER LINES TO FIXTURE OR APPLIANCE. <—
<br /> co o ALL EXPOSED WATER AND WASTE LINES SHALL BE CHROME PLATED.
<br /> wo o
<br /> a 12. REMOVE ALL ABANDONED PIPING TO REMOVED FIXTURES&EQUIPMENT, CAPPING BEHIND --�U 11 y
<br /> < ¢ ----------------- ---- --
<br /> a co FINISHED SURFACES.
<br /> Z
<br /> C6 0
<br /> 13. RELOCATE PLUMBING PIPING (WATER, WASTE&VENT)TO NEW FIXTURE&EQUIPMENT
<br /> LU 0 o CONNECTIONS AS REQUIRED.
<br /> LU
<br /> 0 14. PROVIDE ACCESSABLE WATER HAMMER ARRESTORS OR AIR CHAMBERS WHERE REQUIRED ❑ Ll3/4
<br /> BY THE CALIFORNIA PLUMBING CODE.
<br /> o g (��
<br /> za 15. ARRANGE FOR SAWCUTTING AND PATCHING EXISTING CONCRETE FLOOR SLAB AS lel
<br /> z'
<br /> Z REQUIRED FOR INSTALLATION OF NEW UNDER FLOOR PIPING.
<br /> Q �
<br /> LO w Q
<br /> 0 16. SLEEVES TO BE PROVIDED TO PROTECT ALL NEW PIPING PASSING THRU CONCRETE FLOOR RECORD DATES
<br /> wSLABS PER REQUIREMENTS OF CPC 312.10.
<br /> E o DD SUBMITTAL
<br /> NC) uj Z BLDG.SUBMITTAL 2/4/2022
<br /> o = 17. NEW OR REPAIRED POTABLE WATER PIPING TO BE DISINFECTED PRIOR TO USE PER
<br /> REQUIREMENTS OF CPC 609.9.
<br /> w u) PLUMBING FLOOR PLAN 1/4" = 1'-0" A BID SET
<br /> =w
<br /> CONTRACT SET
<br /> C'4 18. ALL NEW PIPING IN BUILDING TO BE SUPPORTED &SEISMICALLY BRACED PER C::) 2 NEW TANKLESS WATER HEATERS MOUNTED ON EXISTING ROOF WELL WALL ABOVE. REVISIONS
<br /> 0 Z o COLD HOT WASTE WATER
<br /> a= REQUIREMENTS OF 2016 CBC&CPC. ITEM FIXTURE WASTE VENT GAS DESCRIPTION MANUFACTURER/MODEL NUMBER
<br /> m z o WATER WATER FU FU (:E:) NEW WATTS DET 12 EXPANSION TANK ABOVE CEILING CONNECTED TO 1"COLD WATER UP TO WATER HEATERS.
<br /> coo m 19. NEW CLEANOUTS TO BE INSTALLED WHERE REQUIRED BY 2016 CPC &BE READILY WHITE FLOOR MOUNTED PRESSURE ASSISTED FLUSH TANK, ELONGATED BOWL,ADA, 1.1 GPF
<br /> U) 03 1" HOT&COLD WATER, 11/4"GAS, 1/2" FLUE CONDENSATE&3/4"T&P RELIEF VALVE DRAIN UP TO WATER HEATERS ON ROOF.
<br /> Z o
<br /> ACCESSIBLE. THE CONTRACTOR SHALL COORDINATE ALL CLEANOUT LOCATIONS WITH WATER SEE WATER HEATER DETAIL. 0
<br /> z Z= EQUIPMENT, CABINETS, ETC. PRIOR TO ANY INSTALLATION. WC 1&2 CLOSET 4" 2" 1/2" -- -- 4 2.5 WITH BOLT CAPS, TANK COVER LOCKS, OLSENITE #95 OPEN FRONT SEAT LESS COVER AND AM. STD. CADET/MODEL: 2467.100
<br /> a o SPEEDWAY SUPPLY. RIGHT HAND SUPPLY WC-1, LEFT HAND SUPPLY WC-2. ® TERMINATE T&P RELIEF VALVE DRAIN THRU EXISTING EXTERIOR WALL PER CODE. 0
<br /> z =0 20. NEW LAVATORIES AND WATER CLOSETS TO BE INSTALLED PER CALIFORNIA STATE (:Z) 1/2" FLUE CONDENSATE DRAIN DOWN IN WALL WITH 90°TERMINATION LOW AS POSSIBLE OVER EXISTING MOP SINK. 0
<br /> z ' WHITE VITREOUS CHINA, WALL HUNG, ADA COMPLIANT WITH CONCEALED ARM SUPPORT, AMERICAN STD. LUCERNE 0355.012
<br /> Q o o HANDICAPPED ACCESSIBILITY REQUIREMENTS. 4"CENTERS, INTEGRAL BACKSPLASH, FLAT GRID STRAINER, METERING TYPE FAUCET, © EXISTING 200 CFH GAS WATER HEATER ALONG WITH ITS FLUE THRU ROOF AND MOUNTING PLATFORM TO BE REMOVED.ALSO REMOVE
<br /> 2 "z L 1 LAVATORY 2" 11/2" 1/2" 1/2" -- 1 1 WITH A.S. 1340.225 METERING FAUCET
<br /> p a 0 17 GAUGE P-TRAP&SPEEDWAY SUPPLIES. ALL ABANDONED GAS,WATER AND DRAIN PIPING. 0
<br /> CO a 21. LAVATORY FAUCETS NOT TO EXCEED 0.4 GPM MAXIMUM FLOW RATE PER REQUIREMENTS CONNECT TO EXISTING 1"COLD WATER TO REMOVED WATER HEATER ABOVE CEILING.VERIFY LOCATION &SIZE. Q-
<br /> OF CALGREEN CODE.
<br /> LU
<br /> 3 Z o MS 1 MOP SINK 3" 2" 3/4" 3/4" -- 3 3 SI 24"xS,x12" PRECAST TERRAZZO WITH G HIGH THRESHOLD, STAINLESS STEEL CAPON ALL FIAAMTS SD. 8344.012 FAUCET 9 OT WATER TO REMOVED WATER HEATER ABOVE CEILING.VERIFY LOCATION &SIZE.
<br /> � `� SIDES, REAR &LEFT SIDE TILING FLANGES, 3"GRID DRAIN &WALL MOUNTED FAUCET ® CONNECT TO EXISTING 1" H _
<br /> o W o WITH VACUUM BREAKER.
<br /> J 0 CONNECT TO EXISTING 3/4' HOT WATER DOWN IN WALL TO EXISTING MOP SINK FAUCET.VERIFY LOCATION &SIZE.
<br /> 0-
<br /> �I o af GAS FIRED TANKLESS WATER HEATERWATER , 199,000 BTUH INPUT, 6 GPM @ 60 DEGREE RISE TAKAGI T-H3-OS 10 REMOVE EXISTING MOP SINK TO REPLACE EXISTING 3"UNDERFLOOR P TRAP&WASTE. CLIENT
<br /> `f' 'i LUo GENERAL NOTES E WH 1&2 EATER -- -- 3/4" 3/4" -- -- -- RECOVERY RATE WITH OUTDOOR RATING &WALL MOUNTING KITS. WEIGHT = 110 POUNDS 11 CONNECT EXISTING VENT TO NEW WASTE FROM FIXTURE.
<br /> J
<br /> O]
<br /> z 12 RELOCATE EXPOSED DRAIN PIPE DISCHARGING TO MOP SINK INTO EXISTING WALL. PRB MANAGEMENT INC
<br /> Iwa
<br /> O w TRAP PRIMER VALVE WITH SINGLE OUTLET PPP P-2 13 REPLACE 1"GAS ABOVE CEILING TO REMOVED WATER HEATER WITH 11/4"&EXTEND TO NEW WATER HEATERS ON ROOF.VERIFY 4709 Mangels Blvd.
<br /> TOP OF PARAPET WALL ABOVE ROOF TRAP LOCATION &SIZE OF EXISTING GAS. REMOVE EXPOSED ABANDONED PIPE TO REMOVED WATER HEATER. Fairfield,CA 94534
<br /> o TP 1 PRIMER - -- 1/2" -- -- --
<br /> a 14 EXISTING 11/2"COLD WATER SUPPLY WITH SHUT-OFF VALVE IN VALVE BOX. SITE#:3560
<br /> v O 15 EXISTING GAS METER. EXISTING GAS LOAD IS 780 CFH PLUS 200 CFH FOR A NEW LOAD OF 980 CFH. 90'TDL. ENTITY#:
<br /> ,I => 12"SQUARE FLOOR SINK, 8" DEEP WITH DOME STRAINER &1/2 GRATE J.R. SMITH/MODEL 3430-12
<br /> LLQ WATER HEATER MOUNTED HIGH FS 1 FLOOR SINK 3" 2" -- -- -- 2 - 16 OUTLINE OF ROOF WELL ABOVE. PROJECT
<br /> MI o}� WH F1&2 AS POSSIBLE ON WALL,2 WATER
<br /> O W If HEATERS INSTALLED SIDE BY SIDE 17 EXISTING FLOOR SINK ALONG WITH ITS DEEP SEAL P-TRAP&3"WASTE PIPING TO BE REPLACED. CONNECT TO EXISTING 2"VENT. TACO BELL
<br /> co &0 1 CAST IRON FLOOR DRAIN WITH FLANGE, INTEGRAL CLAMPING COLLAR, TRAP 1s EXISTING FLOOR DRAIN ALONG WITH ITS DEEP SEAL P-TRAP&3"WASTE PIPING TO BE REPLACED. CONNECT TO EXISTING 2"VENT. 532 WEST HAMMER LN
<br /> `n aof
<br /> PRIMER CONNECTION AND ADJUSTABLE ROUND NICKEL BRONZE STRAINER
<br /> �o �► 7 FD 1 FLOOR DRAIN 2" 2" -- -- -- 2 - JR SMITH/MODEL: 2005-A 1g WASTE PIPING FROM FLOOR SINK RECEIVING CARBONATED LIQUID DRAINAGE TO BE PER CPC 811. STOCKTON, CA. 95210
<br /> pU 5
<br /> E a z O4 w FLASH PIPE PENETRATIONS THRU WALL WATER zo CONNECT 1/2" HOT WATER TO EXISTING ABOVE CEILING.VERIFY EXISTING PIPE LOCATION &SIZE. APN#000-000-000
<br /> E m o TIGHT,PIPE INSULATION JACKET TO EXTEND THRU
<br /> cu o 3 FLASHING INTO WALL CAST IRON CLEANOUT WITH THREADED ADJUSTABLE HOUSING, ROUND SCORIATED
<br /> w w FLOOR _ HEAVY NICKEL BRONZE COVER. 21 CONNECT 1/2"COLD WATER TO EXISTING ABOVE CEILING.VERIFY EXISTING PIPE LOCATION &SIZE.
<br /> o PROOF FCO 1 CLEANOUT -- -- -- -- -- -- JR SMITH/MODEL: 4051
<br /> a� o J 9 22 CONNECT TO EXISTING 2"VENT IN WALL.VERIFY EXISTING PIPE LOCATION &SIZE.
<br /> Q U
<br /> YCD of CAST IRON CLEANOUT TEE WITH INLET/OUTLET SPIGOT AND THREADED BRASS z3
<br /> CONNECT TO EXISTING 4"VENT THRU ROOF.VERIFY EXISTING PIPE LOCATION &SIZE.
<br /> "o 2 WALL _ PLUG,WITH STAINLESS STEEL ACCESS COVER. z4 1/2"COLD WATER TO TRAP PRIMER TP-1 ABOVE T-BAR CEILING. RUN 1/2"CW DOWN IN WALL FROM TP-1 FLOOR DRAIN. e o n n
<br /> 0 o w CO 1 CLEANOUT -- -- -- -- -- -- JR SMITH/MODEL: 4472 � 4Q�� QLSL�L�,
<br /> U) F o 1O WRAP EXTERIOR WATER PIPING WITH ALUMINUM JACKETED INSULATION 25 CONNECT NEW LAVATORY TO EXISTING CW, HW&V TO REMOVED LAVATORY IN WALL&REPLACED UNDER FLOOR 21W. ENDEAVOR
<br /> M m w �2 EXPANSION TANK PER CPC REQUIREMENTS ABOVE CEILINGENDEAVOR
<br /> CONNECT NEW HAND SINK TO NEW 1/2"CW, 1/2"HW& 11/2"V IN WALL&NEW UNDER FLOOR 2"W. SUCCESSOR M 11/13/2020
<br /> wii O3 3/4"COLD WATER TO WATER HEATER FROM COMMON 1"IN WALL
<br /> �I 0 a ® 3/4"120 DEGREE HOT WATER FROM WATER HEATER TO COMMON 1"IN WALL 27 EXISTING HOSE BIBB TO REMAIN
<br /> O z=
<br /> M� O5 1"GAS TO WATER HEATER FROM COMMON 11/4"IN WALL zs EXISTING HAND SINK TO REMAIN. REPLACE 2"WASTE BELOW FLOOR&UP IN WALL TO NEW WALL CLEANOUT.
<br /> O a © COMBINATION TEMPERATURE AND PRESSURE RELIEF VALVE WITH FULL SIZE PLUMBING
<br /> N a cn COPPER DRAIN FLASHED WATER TIGHT INTO PARAPET WALL&DROPPING TO 29 EXISTING PREP SINK TO REMAIN.
<br /> z z TERMINATION POINT OVER FLOOR SINK BELOW
<br /> E Z o O WATER CONDENSATE DRAIN
<br /> PARAPET WALOL WALL TO&DROPPINOGnTOOTERMINATON POINT OVER 3o EXISTING 3 COMPARTMENT SINK TO REMAIN. REPLACE 2"WASTE BELOW FLOOR&UP IN WALL TO NEW WALL CLEANOUT. PLAN
<br /> c w w FLOOR SINK BELOW 31 EXISTING PLUMBING FIXTURE TO BE REMOVED IN DEMOLITION WORK.
<br /> CIOD= ® SEISMICALLY MOUNT WATER HEATER TO STUDS OR BLOCKING PER CPC
<br /> cu <Z ANY REQUIREMENTSALL USING NMANUFACTS WATER T REBS WALL MOUNTING KIT,SEAL 32 NEW 4"WASTE TO&FROM EXISTING GREASE INTERCEPTOR TO REPLACE EXISTING. SEE UTILITY SITE PLAN FOR CONTINUATION.
<br /> m 0,0
<br /> o O9 COMMON 1"COLD WATER SUPPLY ABOVE CEILING 33 NEW 4"SANITARY WASTE TO EXISTING SEWER CONNECTION TO REPLACE EXISTING. SEE UTILITY SITE PLAN FOR CONTINUATION. Pi 00
<br /> U,
<br /> z
<br /> co w�
<br /> 0
<br /> Cs
<br /> Q� WATER HEATER DETAIL F CONTRACTOR FURNISHED & INSTALLED EQUIPMENT & FIXTURE SCHEDULEI C KEY NOTES B
<br />
|