My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084913_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4082
>
2600 - Land Use Program
>
SR0084913_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:08 PM
Creation date
3/10/2022 12:05:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0084913
PE
2602
FACILITY_NAME
4082 S HWY 99 E FRONTAGE RD
STREET_NUMBER
4082
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17917256
ENTERED_DATE
2/24/2022 12:00:00 AM
SITE_LOCATION
4082 S HWY 99
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transport. The samples were analyzed for nitrate by FGL Environmental of Stockton. <br />The results of the rainwater sampling are as follows: <br />Table 3. Rainwater Nitrate Concentration <br />Date <br />Nitrate (mg/L-N) <br />5/17/2019 <br />0.4 <br />5/19/2019 <br />0.2 <br />3/16/20 <br />0.2 <br />5/18/20 <br />0.4 <br />1/27/21, 10:00 <br />0 (Non -detect) <br />1/27/21, 19:30 <br />0 (Non -detect) <br />1/29/21 <br />0.2 <br />2/11/21 <br />0 (Non -detect) <br />2/12/21 <br />0.1 <br />10/25/21 <br />0 (Non -detect) <br />12/14/21 <br />0 (Non -detect) <br />Average <br />0.136 <br />Live Oak then averaged the concentrations of the 11 samples, for a value of 0.136 <br />mg/L-N to represent the nitrate concentration of rain. The most recent test results from <br />2021 are included in Appendix 5. <br />Because the San Joaquin County Environmental Health Department has requested that <br />local and recent data be utilized wherever possible, the concentration of the Lodi <br />rainwater been selected for use in the nitrate loading calculation. <br />Quantity and Quality of Domestic Wastewater <br />According to the Site Plan provided by MCR Engineering, a new building and 36 truck <br />parking spaces will be constructed on the Site. CK Bros Carrier indicated that a security <br />guard will be present daily. At full Phase II buildout, approximately 7 to 8 mechanics <br />and 2 to 3 office workers will be present on weekdays as well. An estimated 10 truckers <br />per day will visit the facility (personal communication, January 29, 2022). <br />LOGE 2201 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.