Laserfiche WebLink
Goulart, Alisa [CDD] <br /> From: kdahIenburg@Iindenfire.org <br /> Sent: Sunday, May 29, 2022 4:18 PM <br /> To: Goulart,Alisa [CDD] <br /> Subject: Re: FW: Project Referral PA-2200022 (MS) <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Alisa, <br /> The fire district will require a turn around with 41' Radius, or modified hammer head.The surface will not need to be <br /> paved but maintained to support the imposed load of the Fire apparatus.This can be accomplished with Gravel/road <br /> base material.The thickness will be approved upon inspection by Fire dept. personnel. typically 4"'6" of road base. <br /> The fire dist. may also require the use of turnouts in 1320' intervals. also can be discussed with property owner with a <br /> drawn plan. <br /> Thank you, <br /> LT Ken Dahlenburg <br /> Linden-Peters Fire <br />