My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADRUGA
>
1500
>
2800 - Aboveground Petroleum Storage Program
>
PR0515717
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2022 11:37:31 AM
Creation date
3/11/2022 11:12:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0515717
PE
2832
FACILITY_ID
FA0010537
FACILITY_NAME
CUNHA DRAYING INC
STREET_NUMBER
1500
Direction
E
STREET_NAME
MADRUGA
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
24141037
CURRENT_STATUS
01
SITE_LOCATION
1500 E MADRUGA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1500 East Madruga Road PR0515717 <br /> March 8, 2022 Program: APSA <br /> PHOTO 4: SPCC Ian discussion of otential dischar es incom lete. <br /> Cunha Trucking, Inc- <br /> Direction,Rate of Flow&Total Quantity of a Potential Discharge <br /> 40 CFR 112.7(b) <br /> Cunha Trucking,Inc.is located on private property and the main fuel tank is located east <br /> of the main building.The single wall steel fuel oil product tank is designed with a containment <br /> system engineered to contain oil product fluids if the primary wall is compromised.No liquid <br /> discharge is expected to escape the containment's secondary wall.In the event of the failure of oil <br /> Product storage tank's wall all of the contents may discharge into the concrete containment area <br /> and appropriate mitigation measures would be employed No liquid will escape the boundaries of <br /> the secondary containment wall.No spill or release will reach navigable water ways. <br /> With the exception of a failure of the secondary containment wall,the wall will hold the <br /> discharged volume of the#2 Diesel tank within its boundaries.Spill kits are located at the fueling <br /> I to address any spill or discharge of oil products. <br /> Any 55 gallon tanks and/or totes that may be located at the fuel oil product tank are securely <br /> contained and inventoried.Any discharge would be contained,controlled and the waste would be <br /> properly disposed of in a proper manner. All users of oil products are aware of the clean-up <br /> requirements and only employees of Cunha Trucking,Inc.have access to the oil products on site. <br /> Delivery drivers loading oil products into Cunha Trucking,Inc.'s fuel tanks are trained to <br /> _ haul oil products.In the event of a discharge or spill the driver is trained and capable of controlling <br /> and mitigating the spill.Proper clean-up and disposal methods shall be employed and all waste <br /> shall be contained,labeled and removed as required. <br /> Although spills are not expected,Cunha Trucking,Inc.is committed to minimizing any <br /> impact from an oil product discharge.All discharges will remain on site and if a discharge occurs <br /> Cunha Trucking,Inc.will commit the resources,and if needed,contact one,or more,of their clean- <br /> up contractors to assist.All containment,clean-up and disposal will be managed by Cunha <br /> Trucking,Inc.'s management to insure the proper handling of waste products.No spill or release <br /> is capable of reaching navigable water ways under the current operational systems used by Cunha <br /> Trucking,Inc.All potential discharges will remain within a controlled setting and will not be <br /> released beyond the boundaries of Cunha Trucking,Inc.'s controls. <br /> Rate of discbarge will vary from size of the discharge.With a release from atank discharge <br /> rate 600 Gallons per minute.Discharge rate from the#2 Diesel delivery hose during refueling will <br /> be at 300 Gallons per minute. <br /> I <br /> Gary Reeves,LLC 22 <br /> Lydia Baker, SR. REHS Page 4 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.