Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> 6 . 7 TRUCK ROUTES <br /> Trucks will access the Project Area from both <br /> Interstate 580 and 1-205 at International Parkway. <br /> International Parkway, Promontory Parkway, <br /> and Schulte Road will function as the main truck <br /> routes to access the Project and subsequent <br /> warehouse and industrial facilities. Figure <br /> 6.11 depicts the planned truck routes, and the <br /> intersection configurations with STAA turning <br /> movements. <br /> Legend <br /> Captial Parks Drive `` O STAA Intersection <br /> Truck Route <br /> —•■— IPCSP2 Boundary <br /> l <br /> ---- Cordes Ranch (IPC Phase 1) <br /> Promontory Parkway -——- Tracy City Limits <br /> M PromontoLyParkwaa� <br /> 0 <br /> Hood Way i <br /> o <br /> Hopkins Road <br /> 0 <br /> T <br /> J <br /> � T <br /> CD <br /> Shulte Road - Shulte Road <br /> ; <br /> ; <br /> ; <br /> , <br /> Figure 6.11, Truck Routes <br /> CHAPTER 6 <br /> 6-12 <br />