Laserfiche WebLink
Detention basins will be planted with hydroseeded grasses, enhanced with drought tolerant shrubs, and <br /> trees planted along the perimeter. Typically the detention basins will be located at the perimeter of the <br /> project and have the benefit of adding to the landscape setback while functioning as storm water detention <br /> and treatment. <br /> Dry Utilities <br /> Electrical, gas,telephone, and cable service to the Project Area will be supplied by Pacific Gas and Electric <br /> Co. (PG&E). Public electric transmission,gas, and distribution utilities on and in proximity to the Project <br /> Area are owned and maintained by PG&E. A potential electrical substation maybe necessary to provide <br /> electrical services to this project as well as surrounding development.Two locations are shown on the <br /> southern portion of this development. The substation would be included as part of the CEQA review and <br /> analysis and the entitlement for IPCSP2 and the appropriate approval process would be determined by the <br /> County. A variety of cable services providers exist in the surrounding developments. A proposed joint <br /> trench system would include telephone, cable TV, possible ancillary fiber system conduits (dark fiber), and <br /> conduits and conductors for street lighting and traffic signals. <br /> New distribution conduits and conductors will be placed underground in a joint or common trench. Vaults <br /> and boxes placed in the roads or public utility easements, and other equipment,will be pad mounted in lieu <br /> of subsurface installation where possible to avoid corrosion and to facilitate safer and less expensive <br /> maintenance and operations. The joint or common trench will include gas, phone, fiber optic and cable TV <br /> facilities, and such other equipment and facilities as determined by the County. <br /> Page 7 of 7 <br />