Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> Road Construction r <br /> by Adjacent Developer 71 <br /> z — . <br /> 3 <br /> +I <br /> I <br /> R/W FC FC R/W <br /> 30, 4' 5' 8' 2 6' 11' 11' 8' 8' 11 11 6' 2' 7' 12' 3' 30' <br /> Landscape Setback Side Land- Shoul-Travel Lane Median/Left Turn TravelaneShoul Land- Bikeway Landscape Setback <br /> Walk scape der Pockets der scape <br /> 38' 38' <br /> 6' S5'R/W 60'R/W 7' <br /> P.U.E. P.U.E. <br /> Figure 5.3,Conceptual Design for 4-Lane Parkway,Section Al-A1 <br /> y <br /> R/W FC FC R/W <br /> 30' 1 4' 5' 8' 6' 11' 11 16' 11' 11' 6' 7' 12' 3' 30' 7 <br /> Landscape SetbackSide Land- Shoul-Travel Lane Median/Left Turn Travel Lane Shoul- <br /> Land- Bikeway Landscape Setback <br /> Walk scape der Pockets der scape <br /> 76' <br /> 6' 11 5'R/W 7 <br /> P.U.E. P.U.E. <br /> Figure 5.4,Conceptual Design for 4-Lane Parkway,Section A2-A2 <br /> CHAPTER 5 <br /> 5-5 <br />