Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> Promontory Parkway- Six Lane Arterial Landscape setbacks are planted with grasses and <br /> Promontory Parkway is a six-lane arterial with screen trees to soften large architecture and are <br /> the north side containing a 7-foot landscape strip bermed or sloped, as needed. <br /> at the street edge, a 12-foot Class I Bikeway and <br /> 3-foot landscape strip, and a 30-foot landscape <br /> setback beyond the right of way. The southern <br /> side has an 8-foot landscape strip at street edge <br /> planted with grasses and street trees, and a five <br /> 5-foot sidewalk and 4-foot landscape strips within <br /> the right-of-way. An additional 25-foot landscape <br /> setback is located outside of the right of way. <br /> � Legend <br /> Captial Parks Drive <br /> Conceptual 6-Lane Promontory Parkway <br /> —"—' Cordes Ranch (IPC Phase 1) <br /> —••— IPCSP2 Boundary <br /> -——- Tracy City Limits <br /> Promontory Parkway _ <br /> . I <br /> . I <br /> C 19 Promontory Parkway <br /> 0 <br /> N Hood Ways C <br /> c t o <br /> a ° <br /> o <br /> C: Hopkins Road - u <br /> 0 <br /> � <br /> fill <br /> 00 3� <br /> Shulte Road ' i' Shulte Road <br /> .moi <br /> Figure 5.7,Conceptual 6-Lane Major Arterial Locations <br /> CHAPTER 5 <br /> 5-8 <br />