My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084253_OWTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
2482
>
4200 – Liquid Waste Program
>
SR0084253_OWTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 8:15:52 AM
Creation date
3/16/2022 7:58:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
OWTS
RECORD_ID
SR0084253
PE
4201
STREET_NUMBER
2482
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17914018
ENTERED_DATE
9/22/2021 12:00:00 AM
SITE_LOCATION
2482 E CARPENTER RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor Installation Manual — Commercial Systems <br />Equipment Supplied by Contractor <br />Risers and Access covers per Site & Regulatory Requirements <br />Risers in 6" or 12" height increments and access covers are available from your distributor. If not already installed, <br />please refer to installation instructions in this Manual. Maximum riser height is 24 inches for No traffic load and H- <br />20, HS -20 with Support Columns. For H-20, HS -20 with No Support Columns, acceptable riser height is 12 inches to <br />set the depth 24 inches between ground level and adapter ring. <br />All Commercial Models: Two (2) 20 -inch dia. Risers plus One (1) 24 -inch dia. Riser <br />Insulation for Cold Climate Installations <br />To maintain optimal treatment conditions, Fuji Clean recommends insulated risers and access covers as well as <br />foam board or insulating material (min. R -Value 8) over the upper half of the treatment tank. In H-20, HS -20 with <br />No Support Columns installation, insulate at depth of 24 inches between ground level and adapter ring. <br />Septic Tank and/or Pump Station. <br />For commercial system, structure use with high influent load cases, install a septic tank if necessary. Fuji Clean <br />systems are designed to accept straight wastewater. However, some treatment train designs call for pretreatment, <br />settling and/or trash tanks. <br />Fresh Water <br />Systems must be filled with fresh water to Low Water Level before backfill. Please refer to Approx. gallons required <br />per model is "Volume Total" on page 7. <br />Piping / Conduit <br />• Smaller models have inlet/outlet adapters for sched. 40 4" pipe. Models CE14, CE21, CE30, CEN14, CEN21 <br />fittings are for 5" sched. 40 pipe and come with a 5": 4" eccentric adaptors, to accommodate sched. 40 4" pipe. <br />• 3/" or 1" PVC conduit for air line. Flexible irrigation line, 100 PSI Max, (or equivalent) is also acceptable. <br />• Electrical conduit for float switch line (direct burial line is also acceptable if allowed by code). <br />Electrical <br />• Please use licensed electrician and adhere to applicable national/local electrical code(s). <br />• Two (2) standard 115V, 15A circuits for control/alarm panel connection. <br />• Float Switch Wire: #18 AWG, comes with standard 30' length. (Longer lengths are available on request). <br />• Float Switch: May come pre-installed in treatment system. For electrical hookup, please refer to SJE Rhombus <br />installation instructions. <br />• Miscellaneous fittings and connectors to assure watertight connections. <br />Anti -Float Devices, if necessary <br />• Please refer to high water, uplift restraint recommendations in this Manual. <br />Materials for Air Blower / Controller Installation <br />• Concrete base (or equivalent) on which to set air blower. <br />• Protective cover for air blower (recommended) vented and able to achieve free air flow in all conditions. <br />• Materials or location on which to mount control panel and protect from elements. <br />Crushed Stone, Fill, Loam etc. <br />• H-20 and HS -20 load needs concrete base. <br />• Fuji Clean USA is not responsible for design, installation or materials associated with leach field or treated <br />wastewater disposal area. <br />Please note: Proper installation permitting is the responsibility of the installing contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.