Laserfiche WebLink
No -traffic Area Installation Procedure <br />Unloading Instructions: <br />❑ Upon delivery, inspect Fuji clean tank, both outside and inside for possible damage incurred <br />during transport. If you find damage, or have a question, please contact your distributor <br />immediately. <br />❑ Step 1: Prepare excavation to be at least 1 to 2 feet <br />larger than Fuji Clean system dimensions as listed in the <br />Design Specification Table on page 7 of this Manual. <br />Important Note: Total height from tank top to grade <br />should not exceed 24". <br />❑ Step 2. Prepare 4"- 6" bed of stone (1/8"), compact e'i <br />sand, poured or precast concrete level to within 1/8" <br />per 2 feet. (10mm per 2 meter or 1/200). <br />BED Of <br />►[&STONE <br />ADDED <br />.. y <br />Compact stone or sand <br />❑ Step 3: Carefully lower and set tank. <br />Level to within 1/8" per 2 feet. <br />(10mm per 2 meter or 1/200). <br />Use ALL 4 -point lifting lugs <br />