My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084253_OWTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
2482
>
4200 – Liquid Waste Program
>
SR0084253_OWTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 8:15:52 AM
Creation date
3/16/2022 7:58:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
OWTS
RECORD_ID
SR0084253
PE
4201
STREET_NUMBER
2482
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17914018
ENTERED_DATE
9/22/2021 12:00:00 AM
SITE_LOCATION
2482 E CARPENTER RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Step 7: Using supplied adaptors and fittings, attach air pipe fitting to tank and connect to 3/" or 1" <br />conduit in prepared trench (min. 6" deep) to location of air blower. Please note: W or 1" flexible <br />irrigation line, 100 PSI Max, (or equivalent) may also be used for the air line. <br />(Note: Adaptors to tank are not necessary for air line to tank connection for Fuji Clean models, CE21 and <br />larger and CEN14 and larger. Use 3/4" conduit). Adaptors to tank are necessary for air line to tank <br />connection for CE14 and CEN10. <br />LOCATE BLOWER WITHIN 33 -FT OR 100 -FT OF TREATMENT TANK (FOLLOW CONDUIT ON TABLE BELOW) <br />AND WITH NO MORE THAN FIVE (5) ELBOWS (FOLLOW BLOWER FOUNDATION DRAWING BELOW). If site <br />conditions prevent this, please contact your distributor or Fuji Clean USA for technical assistance. <br />For connection air line to tank, use sealant <br />meeting ASTM C990-96 standard to prevent (� <br />septic gas transmission into control panel. <br />❑ Step 7 continued: Set riser on the tank. <br />Maximum riser height is 24 -inches. <br />X Japanese pipe dia. <br />3/4" PVC air line can insert directly <br />into commercial tank models, CE21 <br />and larger and CEN14 and larger. <br />SCN 40 PVC PIPE AND FITTINGS <br />— USE PIPE DIAMETER MATCHING <br />ADAPTOR NIT SUPPLIED WITH SLOWER <br />i <br />i PLAN VIEW CONCRETE SASE PLACED <br />• ON STONE FOUNDATION <br />Excluding <br />in "S Elbows" /// SLOWER MODEL AND OUANTm <br />SASED ON DESIGN REQUIREMENTS <br />• r`r <br />12 <br />ELEVATION VIEW <br />
The URL can be used to link to this page
Your browser does not support the video tag.