My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084253_OWTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
2482
>
4200 – Liquid Waste Program
>
SR0084253_OWTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 8:15:52 AM
Creation date
3/16/2022 7:58:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
OWTS
RECORD_ID
SR0084253
PE
4201
STREET_NUMBER
2482
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17914018
ENTERED_DATE
9/22/2021 12:00:00 AM
SITE_LOCATION
2482 E CARPENTER RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Step 11: In most cases, the Fuji Clean treatment system will vent through the building's septic influent <br />line and building plumbing. In cases where there is an influent pump, or in severe downdraft <br />locations, a separate vent should be considered. If you do choose to install a vent, be sure that the <br />vent slopes toward the tank so that any moisture accumulation drips back down toward the tank. <br />If optional air vent line is installed, <br />slope conduit toward tank to <br />prevent moisture accumulation <br />3" port for optional air vent line. If not used, <br />install plug in port by turning clockwise to tighten. <br />(Note: 2 ports in CE21, 30, CEN14 and 21). <br />Vent pipe diameter <br />M` d <br />r z. <br />Commercial 3" ((�75) 4" ( 100) <br />One vent line is able to connect system clusters of <br />2 to 4 units with 4" diameter pipe. <br />Joining point of tank and vent line within 16feet. <br />In case of over 5 units, use two (2) vent lines. <br />❑ Step 12: During final landscaping, seeding <br />etc., be sure to pitch final grade away from <br />covers to sweep surface water away from <br />treatment tank. <br />• Local regulations may specify required vent pipe <br />diameter <br />• Keep horizontal vent pipe as short as possible. <br />Vertical pipe length should be 2 times longer than <br />horizontal <br />• Installation of a positive flow ventilation fan <br />facilitates better ventilation <br />• Greater temperature differential between tank and <br />outside air facilitates more effective ventilation <br />❑ Step 13: Fill out Warranty Activation Card (received with this Installation Manual) and return to <br />Fuji Clean USA to activate system Warranty. If this card cannot be found, please contact Fuji <br />Clean USA for voice or online Warranty activation. 207-406-2927. <br />
The URL can be used to link to this page
Your browser does not support the video tag.