Laserfiche WebLink
❑ Step 7: Using supplied adaptors <br />and fittings, attach air pipe fitting <br />to tank and connect to 3/" or 1" <br />conduit in prepared trench (min. 6" <br />deep) to location of air blower. <br />Please note: 3/" or 1" flexible <br />irrigation line, 100 PSI Max, (or <br />equivalent) may also be used for <br />the air line. <br />(Note: Adaptors to tank are not necessary for air line to tank <br />connection for Fuji Clean models, CE21 and larger and CEN14 <br />and larger. Use 3/4" conduit). Adaptors to tank are necessary <br />for air line to tank connection for CE14 and CEN10. <br />LOCATE BLOWER WITHIN 33 -FT OR 100 -FT OF TREATMENT <br />TANK (FOLLOW CONDUIT ON TABLE BELOW) AND WITH NO <br />MORE THAN FIVE (5) ELBOWS. Refer to elbow counting page 13. <br />If site conditions prevent this, please contact your distributor <br />or Fuii Clean USA for technical assistance. <br />For connection air line to tank, use <br />sealant meeting ASTM C990-96 m <br />standard to prevent septic gas t11 Cum <br />transmission into control panel. <br />cji <br />3/4" PVC air line can insert directly <br />into commercial tank models, CE21 <br />and larger and CEN14 and larger. <br />X Japanese pipe dia. <br />❑ Step 7 continued: Set riser on the tank. <br />❑ Step 8: Locating and Installing Blower/Control Panel. Please refer the details page 14. <br />❑ Step 9: Float switch electrical cord connect through a male adaptor (caulked watertight to <br />prevent septic gas leakage) or watertight fitting. An interior connection to direct burial cable is <br />also an acceptable option. <br />19 <br />1 1 <br />MVBlower <br />Outlet Pipe <br />3/4" <br />Air Intake at Tank <br />X13 X <br />X20 X <br />X20 X <br />Blower to Tank Distance / <br />Airline Conduit Dia. <br /><33 Feet / <br />3/4" <br /><100 Feet/ <br />V, <br />< 33 Feet <br />3/4" <br /><100 Feet <br />1" <br /><33 Feet <br />1" <br /><100 Feet <br />1" <br />X Japanese pipe dia. <br />❑ Step 7 continued: Set riser on the tank. <br />❑ Step 8: Locating and Installing Blower/Control Panel. Please refer the details page 14. <br />❑ Step 9: Float switch electrical cord connect through a male adaptor (caulked watertight to <br />prevent septic gas leakage) or watertight fitting. An interior connection to direct burial cable is <br />also an acceptable option. <br />19 <br />