Laserfiche WebLink
• <br />Fu)iClean USA <br />LLC <br />Toward Clean Water... <br />Installation Procedure Checklist for H-20, HS -20 with Support Columns <br />Note: Please consult Installation Manual for detailed instructions. <br />Unloading Instructions: <br />❑ Upon delivery, inspect Fuji Clean tank, both outside and inside for possible damage incurred during <br />transport. If you find damage, or have a question, please contact your distributor immediately. <br />❑ Step 1: Prepare excavation following this instruction and drawing plan. Note: Riser height should not <br />exceed 24". <br />❑ Step 2: Prepare 4"- 6" bed of stone (1/8"). <br />❑ Step 3: Set pre -cast concrete or pour concrete base. <br />❑ Step 4: Set Adhesive anchor for binding foundation and column (4)#4 and set rebar and PVC tube or <br />Concrete form tube for pillar. Pour concrete to tubes. <br />❑ Step 5: Use 4 -point lifting lugs. Carefully lower and set tank. Level to within 1/8 -inch per 2 -ft. <br />❑ Step 6: Re -check that tank is level to 1/8 -inch per 2 -ft., (fore and aft as well as side to side) and then fill <br />tank with fresh water to the low water line (marked inside tank). Start 24-hour water tightness test. (Please <br />contact your distributor or Fuji Clean USA if water level has dropped after 24 hours). <br />❑ Step 7 : After concrete is hardened on support columns, backfill about % way up tank in layered, compacted <br />6" lifts using peastone or equivalent material that form -fits into tank corrugations. Install inlet/outlet lines <br />using 5x4 reducing bushing if necessary. <br />❑ Step 7 cont.: Using supplied adaptors and fittings, attach air pipe fitting to tank and connect to %" or 1" <br />conduit in prepared trench (min. 6" deep) to location of air blower. For CE14, 21, CEN10 and 14, locate <br />blower within 33' for %" or 1" air line or 100' for 1" air line. For CE30 and CEN21 use 1" air line. Connect with <br />no more than 5 elbows on each models. <br />❑ Step 8: Locating and Installing Blower/ Control Panel. <br />Air Blower shall be: <br />✓ in as close proximity to control panel as possible <br />Von a solid (e.g. concrete) pad to minimize vibrations <br />✓ in a location above water level <br />✓away from grease exhaust fans. <br />✓away from bedroom windows and other locations where operational sounds (although minimal) <br />may be a nuisance <br />✓ In a location that allows unencumbered access for inspection and maintenance activity <br />✓with proper electrical grounding <br />✓with wiring and electrical connections made by a licensed electrician. <br />✓with no objects on top of electrical cord. <br />✓ in a well -ventilated space out of direct sunlight and protected from elements such as direct rain <br />or snowfall. <br />46 <br />Fuji Clean USA • 41-2 Greenwood Road • Brunswick Maine 04011 • Tel: 207-406-2927 • Fax: 207-406-2929 • <br />www.fuhicleanusa.com <br />