Laserfiche WebLink
SAN J O A R N Environmental Health Department <br /> i , �V <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> AGS FUEL INC DBA CIRCLE K CHEVRON 1490 S MAIN ST, MANTECA March 30, 2022 <br /> Other Violations <br /> 2010 See below Unlisted General violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 122 CCR 2712(f)Failure to implement corrections and submit written response within 30 days of receiving the report. <br /> OBSERVATION:An inspection was last done on 03/30/2021 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 04/29/2021. This information was received on 9/27/2021,five months late resulting in a non-compliant status for <br /> this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This is a repeat violation, Class II. <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note the correct test date for the overfill prevention <br /> on the designated operator inspection report of 03/07/2022. The incorrect date is 03/20/2021.The correct date for <br /> the overfill prevention testing is 03/30/2021. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> This is a repeat violation, Class II. <br /> 307 HSC 25290.1(c3), 25290.2(c3) Failure to keep water out of the secondary containment system (post-Jul 2003). <br /> OBSERVATION:Water was found in the 91 fill sump. <br /> REGULATION GUIDANCE: Secondary containment shall be constructed to prevent any water intrusion into the <br /> system by precipitation, infiltration, or surface runoff. <br /> CORRECTIVE ACTION: The service technician removed approximately halve a gallon of liquid from the 91 fill <br /> sump and returned the sensor to its proper location. Immediately contact a properly licensed, trained, and certified <br /> contractor to address the water intrusion into the 91 fill sump under permit and inspection of the EHD. <br /> This was corrected on site. <br /> This is a repeat violation, Class II. <br /> Overall Inspection Comments: <br /> FA0023750 PR0541436 SCO01 03/30/2022 <br /> EHD 23-01 Rev.12/06/2021 Page 4 of 5 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />