| 
								    12/07/2020 
<br />ABBEY WATER WELL SVC 
<br />10706 S HWY 26 
<br />VALLEY SPRINGS CA 95252 
<br />RE: Well Pump Inspection 
<br />I 
<br />Environmental Health Department 
<br />Jasjit Kang, REHS, Director 
<br />Muniappa Naidu, REHS, Assistant Director 
<br />PROGRAM COORDINATORS 
<br />Robert McClellon, REHS 
<br />Jeff Carruesco, REHS, RDI 
<br />Willy Ng, REHS 
<br />Michael Kith, REHS 
<br />Melissa Nissim, REHS 
<br />Well Location: 22920 E ACAMPO RD, LODI CA 95242 Permit #: WP0041286 Inspection Date: 12/7/2020 
<br />The Environmental Health Department recently conducted a water well pump inspection at the above address 
<br />and found the following issues at the time of the inspection. In order to protect the ground water supply and 
<br />your water source from potential degradation, please take the associated corrective actions. 
<br />❑ Lack of or Inadequate Concrete Platform around Wellhead. 
<br />(SJC Water Well Standards, Section 4.10. — Surface Seal) 
<br />Corrective Action: Repair existing or install a new concrete platform around the wellhead that 
<br />extends two feet in all directions from the well casing. 
<br />❑ Lack of or Inadequate Sanitary Seal at Wellhead. 
<br />(SJC Ord. Code, Title 9, Section 9-1115.5. — Well Regulations) 
<br />Corrective Action: Install a sanitary seal between casing and well cover plate/seal all gaps and 
<br />openings. 
<br />❑x Lack of or Inadequate Sampling Tap. 
<br />(SJC Water well Standards, Section 4.13. — Sampling Tap) 
<br />Corrective Action: Install a non -threaded sampling tap between the wellhead and the check valve 
<br />or within three (3) feet of the well head. 
<br />X Lack of or Inadequate Backflow Prevention. 
<br />(SJC Water Well Standards, Section 4.14. — Backflow Prevention) 
<br />Corrective Action: Install an approved protective device to prevent backflow and/or back 
<br />siphonage into a well. 
<br />❑ Sounding Tube or Air Vent not Sealed. 
<br />(SJC Water Well Standards, Section 4.13. — Sounding Tube/Air Vent Pipe) 
<br />Corrective Action: Sounding Tube or Fill Pipe -Install a watertight, threaded cap at the upper end 
<br />of the pipe. Air Vent -extend pipe 12 inches above with end inverted in a 
<br />downward direction and covered with 16 -mesh screening. 
<br />❑ Excessive Vegetation or debris around Wellhead. 
<br />(SJC Ord. Code, Section 9-1115.4. — Dangerous/Nuisance) 
<br />Corrective Action: Remove and maintain debris and vegetation away from well area. 
<br />If you have any questions, contact: Francisco Garcia Ruiz, Environmental Health Assistant. 
<br />Email: fgarciaruiz@sjgov.org 
<br />Please call – (209) 46$-9996 when work is complete. 
<br />Michael Kith, REHS 
<br />Program Coordinator 
<br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www,sjcehd.com 
<br />SAKJOAQUIN 
<br />—COUNTY— 
<br />COUNTYGreatness 
<br />Greatnessgrows here. 
<br />12/07/2020 
<br />ABBEY WATER WELL SVC 
<br />10706 S HWY 26 
<br />VALLEY SPRINGS CA 95252 
<br />RE: Well Pump Inspection 
<br />I 
<br />Environmental Health Department 
<br />Jasjit Kang, REHS, Director 
<br />Muniappa Naidu, REHS, Assistant Director 
<br />PROGRAM COORDINATORS 
<br />Robert McClellon, REHS 
<br />Jeff Carruesco, REHS, RDI 
<br />Willy Ng, REHS 
<br />Michael Kith, REHS 
<br />Melissa Nissim, REHS 
<br />Well Location: 22920 E ACAMPO RD, LODI CA 95242 Permit #: WP0041286 Inspection Date: 12/7/2020 
<br />The Environmental Health Department recently conducted a water well pump inspection at the above address 
<br />and found the following issues at the time of the inspection. In order to protect the ground water supply and 
<br />your water source from potential degradation, please take the associated corrective actions. 
<br />❑ Lack of or Inadequate Concrete Platform around Wellhead. 
<br />(SJC Water Well Standards, Section 4.10. — Surface Seal) 
<br />Corrective Action: Repair existing or install a new concrete platform around the wellhead that 
<br />extends two feet in all directions from the well casing. 
<br />❑ Lack of or Inadequate Sanitary Seal at Wellhead. 
<br />(SJC Ord. Code, Title 9, Section 9-1115.5. — Well Regulations) 
<br />Corrective Action: Install a sanitary seal between casing and well cover plate/seal all gaps and 
<br />openings. 
<br />❑x Lack of or Inadequate Sampling Tap. 
<br />(SJC Water well Standards, Section 4.13. — Sampling Tap) 
<br />Corrective Action: Install a non -threaded sampling tap between the wellhead and the check valve 
<br />or within three (3) feet of the well head. 
<br />X Lack of or Inadequate Backflow Prevention. 
<br />(SJC Water Well Standards, Section 4.14. — Backflow Prevention) 
<br />Corrective Action: Install an approved protective device to prevent backflow and/or back 
<br />siphonage into a well. 
<br />❑ Sounding Tube or Air Vent not Sealed. 
<br />(SJC Water Well Standards, Section 4.13. — Sounding Tube/Air Vent Pipe) 
<br />Corrective Action: Sounding Tube or Fill Pipe -Install a watertight, threaded cap at the upper end 
<br />of the pipe. Air Vent -extend pipe 12 inches above with end inverted in a 
<br />downward direction and covered with 16 -mesh screening. 
<br />❑ Excessive Vegetation or debris around Wellhead. 
<br />(SJC Ord. Code, Section 9-1115.4. — Dangerous/Nuisance) 
<br />Corrective Action: Remove and maintain debris and vegetation away from well area. 
<br />If you have any questions, contact: Francisco Garcia Ruiz, Environmental Health Assistant. 
<br />Email: fgarciaruiz@sjgov.org 
<br />Please call – (209) 46$-9996 when work is complete. 
<br />Michael Kith, REHS 
<br />Program Coordinator 
<br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www,sjcehd.com 
<br />
								 |