Laserfiche WebLink
Pacific Gas and <br />- Electric Company <br />proper clearance. Roads and utilities should -cross the transmission easement as nearly at -right <br />angles as passible. Road intersections will not be allowed within the transmission easement. <br />9. Pipelines: Pipelines may be allowed provided crossings are held to a minimum and to be as <br />nearly perpendicular as possible.. Pipelines within 25 feet of PG&E structures require review by <br />PG&E. -Sprinklers systems may be allowed; subject to review. Leach fields and septic tanks are <br />not allowed. Construction plans must be submitted to -PG&E for review and approval prior to -the <br />commencement -of any construction. <br />10. Signs: Signs are -not allowed except in rare cases subject to individual review by P.G&E_ <br />11. Recreation Areas: Playgrounds, parks, tennis courts, basketball courts, barbecue and light <br />trucks (pickups, vans, etc.; may be allowed, subject to review of plans. Heavy equipment <br />access to PG&E facilities is to be maintained at all times:. Parking is to clear PG&E -structures by <br />at least 10 feet: Protection of PG&E facilities from vehicular traffic -is to be provided at <br />developer's expense AND to PG&E specifications. <br />1-2. Construction Activity: Since construction activity will take place near PG&E's overhead <br />electric lines, please be advised -it -is. the contractor's responsibility to be aware of, and -observe <br />the minimum clearances for both workers and equipment operating near high voltage electric <br />lines set out in the High -Voltage Electrical Safety Orders of the California Division of Industrial <br />Safety (haps://w-w-w.dir a.gov/Tit.leB/sb5ahl 1), as well as any other safety regulations. <br />Contractors shall comply with California Public Utilities Commission General Order -95 <br />(http://s-,v.cpuc.ca.gov/los/GO95/go 95 startup page.html) and all other safety rules. No <br />construction may occur within 25 feet of-PG&E's towers. Ala -excavation activities may only <br />commence after 811 -protocols has been followed. <br />Contractor shall ensure the protection of PG&E's towers and poles from vehicular damage by <br />(installing protective barriers) Plans for protection barriers -must be approved by PG&E prior to <br />construction. <br />13. PG&E -is also the owner of distribution facilities throughout many of the areas within the <br />state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and <br />approved by -PG&E to ensure that no impactoccursthat m -ay endanger the safe and reliable <br />operation of its -facilities. <br />PG&E Gas and Electric Facilities Page 6 <br />