My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007720
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
34443
>
2600 - Land Use Program
>
PA-0500847
>
SU0007720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 8:24:32 AM
Creation date
3/18/2022 8:44:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007720
PE
2605
FACILITY_NAME
PA-0500847
STREET_NUMBER
34443
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
25328002
ENTERED_DATE
5/12/2009 12:00:00 AM
SITE_LOCATION
34443 S BIRD RD
RECEIVED_DATE
3/15/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED CONDITIONS OF APPROVAL <br /> PA-0500847 <br /> TRIANGLE PROPERTIES INC./DSS COMPANY DBA KNIFE RIVER CONSTRUCTION <br /> Revisions of Approved Actions for Quarry Excavation Application No. PA-0500847 was approved <br /> by the San Joaquin County Planning Commission on May 19, 2022. The effective date of approval <br /> for the Revisions of Approved Actions is May 29, 2022. This approval will expire on September 6, <br /> 2047, which is 40 years from the effective date of approval of the Quarry Excavation Application, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been issued and remain in force, and (3) all necessary permits from other agencies have been <br /> issued and remain in force. <br /> Unless otherwise specified,all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Contact: [209]468-3121) <br /> a. IMPROVEMENT PLAN: Submit an "APPLICATION-SITE IMPROVEMENT PLAN". A fee is required <br /> for the Site Plan review. <br /> b. APPROVAL: This is an approval to remove 142 million tons of rock, sand and gravel in four phases <br /> over 40 years, as shown on the site plan dated May 16, 2006. The approval includes the Reclamation <br /> Plan dated May 16, 2006. All of the materials excavated shall be processed at the existing facility(QX- <br /> 91-5). <br /> c. STOCKPILING: No stockpiled soil or material shall be placed closer than 25 feet to a property <br /> boundary. (Development Title Section 9-1415.3[b]) <br /> d. PRIVATE ROADS:All private roads involved in an excavation shall be maintained so as to control the <br /> creation of dust. The first 100 feet of any private road on the property which intersects with a publicly <br /> maintained road shall be surfaced in a manner approved by the Director. Traffic-control and warning <br /> signs shall be installed, if required, at such intersection. The placement and size of these signs shall <br /> be approved by the Director of Public Works. (Development Title Section 9-1415.3[c]) <br /> e. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the reclamation plan. (Development Title <br /> Section 9-1415.3[d]) <br /> f. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met unless <br /> otherwise modified by conditions of the Quarry Excavation Permit. (Development Title Section 9- <br /> 1415.3[e]) <br /> g. HOURS OF OPERATION: Plant operations shall be operated 24-hous a day, 7 days a week. <br /> h. REPLACEMENT OF TOPSOIL:The topsoil shall be set aside, and upon completion of an excavation, <br /> the topsoil shall be replaced and the site leveled in conformance with the excavation permit. <br /> (Development Title Section 9-1415.3[g]) <br /> i. REMOVAL OF TOPSOIL: The topsoil may be removed from the site. (Development Title Section 9- <br /> 1415.3[g]) <br /> PA-0500847—Conditions of Approval and Monitoring and Mitigation Reporting Plan 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.