My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084912_LIQUID WASTE PLAN CHECK
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1868
>
4200 – Liquid Waste Program
>
SR0084912_LIQUID WASTE PLAN CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 10:08:42 AM
Creation date
3/18/2022 9:42:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
LIQUID WASTE PLAN CHECK
RECORD_ID
SR0084912
PE
4201
FACILITY_NAME
EIJEN CORPORATION
STREET_NUMBER
1868
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
ENTERED_DATE
2/24/2022 12:00:00 AM
SITE_LOCATION
1868 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 Design and Installation <br /> 2.3 VERTICAL SEPARATION TO LIMITING LAYER: The Vertical Separation is measured from the <br /> bottom of the 6 inches of sand under the GSF units to the limiting layer shall not be less than 2 feet. <br /> FIGURE 3: VERTICAL SEPARATION DISTANCE <br /> SEED AND LOAM <br /> GEOTEXTI LE <br /> FABRIC <br /> 7° <br /> 6" <br /> SPECIFIED SAND <br /> 24" MIN TO GROUNDWATER-24" MIN TO BEDROCK <br /> 2.4 SPECIFIED SAND SPECIFICATION FOR GSF SYSTEMS: The sand immediately under, between <br /> rows and around the perimeter of the GSF system must meet ASTM C33 SPECIFICATIONS, WITH LESS <br /> THAN 10% PASSING A #100 SIEVE AND LESS THAN 5% PASSING A #200 SIEVE. Please place a <br /> prominent note to this effect on each design drawing. See Table 1 for more information on the sand and <br /> sieve specifications. Washed concrete sand easily meets the above specification and is a reliable choice. <br /> Suitability of bank run sand must be verified. <br /> 2.5 PLACING GSF MODULES: The "painted stripe"on the GSF modules indicates the top of the module <br /> and is not intended to indicate the location of the distribution pipe. With the painted stripe facing up, all <br /> rows of GSF modules are set level, end to end on the Specified Sand layer. Beds on level sites require a <br /> minimum spacing of 12" of Specified Sand between parallel module rows with 24" of separation required <br /> on sites with 15%to 20% slope. No mechanical connection is required between modules. <br /> 2.6 DISTRIBUTION: Gravity, pump to gravity or pressure distribution are acceptable when using the GSF <br /> System. Piping shall meet the requirements guidelines; however, Eljen strongly recommends the use of <br /> SDR 35 pipe and fittings as to prevent crushing during backfill. <br /> All systems require a perforated 4" diameter pipe centered on top of the GSF modules unless the system <br /> is curving. The distribution pipe continues along the entire length of all modules in a trench or row. Holes <br /> are set at the 4 and 8 o'clock position and secured by the Eljen provided wire clamps. <br /> When using pressure distribution, a pressure manifold is placed inside the 4-inch distribution pipe or orifice <br /> shields are placed over the pressure manifold. Section 7.0 of this manual goes into details of how to <br /> construct the distribution network. All piping must meet state and local regulations. <br /> 2.7 CONNECTIONS AND FITTINGS: Connections of lines to tanks and distribution boxes must be made <br /> using watertight mechanical seals. Use of any grouting material is not permitted. <br /> 2022 California Design&Installation Manual Page 7 www.eljen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.