Laserfiche WebLink
NSF 245 Plan and Cross Sections <br /> 28' <br /> VENT PIPE AS REQUIRE <br /> DISTRIBUTION BOX SAMPLING <br /> GSF UNIT PORT <br /> SEPTIC TANK <br /> 18"SYSTEM SAND <br /> I <br /> �Ii!�7� i�0 <br /> 12"SAND/LIGNOCELLULOSE LAYER 2"LIMESTONE PEA GRAVEL <br /> LAYER <br /> COLLECTION PIPE WITH 4%SLOPE <br /> SEPTIC TANK <br /> D-BOX <br /> 28' <br /> HIGH <br /> WATER <br /> ALARM <br /> VENT IF SAMPLING <br /> PORT <br /> REQUIRED <br /> 12' <br /> 15/10/055/0030 This report may not be reproduced in whole or in part Page 20 of 59 <br /> Final Report without the expressed written consent of NSF International January 2019 <br />