Laserfiche WebLink
SAN JOARU <br />.�_,u;� i <br />Environmental Health Department <br />Underground Storage Tank Program Inspection Report <br />Facility Name: <br />Facility Address: <br />Date: <br />SUPER STOP GAS & LIQUORS <br />290 N MAIN ST, MANTECA <br />April 05, 2022 <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />Item # <br />Remarks <br />117 <br />CCR 2637(e), 2637(f) Failed to submit "Secondary Containment Testing Report Form" within 30 days after the test. <br />OBSERVATION: Secondary containment testing was performed on 07/22/202] and a test report was submitted on <br />10/2/2021, two months late. <br />REGULATION GUIDANCE: A copy of the test report must be submitted within 30 days of the tests. <br />CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br />performed in a timely manner. <br />This is a minor violation. <br />118 <br />CCR 2637.2(d&e), 2665(a&b) Failure to submit the "Overfill Prevention Equipment Inspection Report Form" within <br />30 days. <br />OBSERVATION: Overfill prevention equipment testing was performed on 04/5/2021 and a test report was <br />submitted on 06/23/2021, one month late. <br />REGULATION GUIDANCE: A copy of the test report must be submitted within 30 days of the tests. <br />CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br />performed in a timely manner. <br />This is a minor violation. <br />122 <br />CCR 2712(f) Failure to implement corrections and submit written response within 30 days of receiving the report. <br />OBSERVATION: An inspection was last done on 04/05/2021 and an inspection report was issued identifying <br />information to be submitted to bring this site into compliance. This information was required to be submitted by <br />05/05/2021. This information was received on 07/21/2021, two months late resulting in a non-compliant status for <br />this facility. <br />REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br />corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br />all of the recommendations made in the report. The operator shall submit a written response that includes a <br />statement documenting corrective actions taken or proposing corrective actions which will be taken. <br />CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br />submitted and all corrections implemented within 30 days of receiving an inspection report. <br />This is a repeat violation, Class II. <br />FA0003716 PR0231438 SCO01 04/05/2022 <br />EHD 23-01 Rev. 12/06/2021 Page 5 of 7 Underground Storage Tank Program OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />