My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
1900 - Hazardous Materials Program
>
PR0519899
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 9:47:47 AM
Creation date
3/22/2022 9:46:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0519899
PE
1921
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hazardous Materials & Waste Contingency Plan <br />Kaiser Permanente Manteca Hospital <br />4/01/202242/31/2022 <br />(b) Storage area description with storage methods utilized, including duration and <br />temperature, if applicable. <br />The facility :maintains a secured area for storage of hazardous waste pending disposal <br />preventing unauthorized entry. <br />The storage area is marked with warnings that read in English and Spanish <br />"Danger Hazardous Waste Accumulation Area—Unauthorized Personnel Keep Out". <br />These signs are legible from a distance of at least 25 feet. <br />® Hazardous waste storage area is protected from exposure to sun and rain. <br />® Secondary containment is required for hazardous waste. <br />® Hazardous waste shall not be stored on-site for more than 90 days prior to disposal. <br />{c) Regis#ered hazardous was#e The alternate Itazardous waste hauler isa <br />hauler is: <br />® Clean I larbors ® Ramos Environmental Services, Reg. No. <br />Environmental Services 4518 <br />1034 Commercial Street, 1515 South River rd <br />Suite 107 'Vest Sacramento, CA 95691 <br />San Jose, CA 95112 (916) 371-5747 <br />{916} 3752611 x2036 <br />® Additional Waste haulers will be contacted in the event the alternate medical waste <br />hauler is unavailable [List of additional waste hauler contacts are located inside <br />Hazardous Waste Manifest Binder managed by Environmental Services (EVS) <br />department]. <br />{d} Da you have tracking dacuments for all hazardous waste handled at your faeility2 <br />+ Tile Kaiser Compliance document for record keeping states Manifest <br />documentation must be kept for life! Uniformed hazardous waste manifest and <br />land disposal restriction (LDR) Farms will be retained permanently. <br />(e} Describe your hazardous rvnste emergency action plan, including procedures for <br />handling spil]s, exposures, equipment failures, etc. <br />The Contingency)I']an shall be carried out imrnediateIy whenever there is a fire <br />, explosion, <br />spill or release of Itazardous materiaflwaste or Itarardous material/ waste constituents to the <br />air, soil or surface water which could threaten human health or the environment. This plan <br />minimizes the hazards to human health and the environment that may occur as a result of <br />emergencies involving hazardous materials/wastes. The regulations that specify the <br />contingency plan requirements are found in the California Code of Regulations (CCR), 'ritle <br />22, Chapter 15, Article 4, beginning with §66265.50. <br />As a generator that stores hazardous waste onsite, we are required to complete the <br />contingency plan. We are to keep one copy ofthe plan and submit a copy of the plan to each a <br />agency that may provide emergency response to our facilities. The plan must be revised <br />wlienever the plan fails during an emergency, the facility changes, the contents of the pian <br />change or the regulations change. <br />Tile Emergency Coordin:ttar (Safety Officer) <br />has authority to implement the contingency <br />plan. In the event of an emergency, the following personnel shalt take responsibility as <br />
The URL can be used to link to this page
Your browser does not support the video tag.