Laserfiche WebLink
H/C <br />TOILET <br />H/C <br />TOILET <br />WCO <br />LAV-1 <br />2" FD <br />1-1/2" VTR <br />WC-1 <br />2"SS1-1/2" VTR <br />4 <br />" <br />S <br />S4"SSP.O.C. <br />WCO <br />LAV-1 <br />2" FD <br />1-1/2" VTR <br />CO <br />2 <br />" <br />S <br />S <br />1-1/2" VTR <br />4"SS4"SSP.O.C. <br />TP <br />HVAC <br />UNIT <br />2" FD <br />TPWCOWCO 2" FD <br />2" FD <br />UR-1 <br />WC-1 <br />TP <br />WCO2"SS4" CO <br />65 <br />5 6 5 6 <br />65 <br />H/C <br />TOILET <br />H/C <br />TOILET <br />LAV-1 WC-1 <br />WCO <br />LAV-1 <br />2" FD <br />CO <br />1/2" BRANCH <br />1" CWTR SUPPLY POINT <br />OF CONNECTION <br />TEANT SUPPLIED <br />30-GALLON GAS WATER <br />HEATER OR EQUAL <br />1/2" BRANCH <br />HWTR TYP. <br />3/4" HWTR <br />SUPPLY TYP. <br />1" CWTR SUPPLY POINT <br />OF CONNECTION <br />TEANT SUPPLIED <br />30-GALLON GAS <br />WATER HEATER <br />EQUAL <br />1/2" BRANCH <br />HWTR TYP. <br />3/4" HWTR <br />SUPPLY TYP. <br />3/4" GAS <br />SUPPLY <br />TYP. <br />3/4" GAS SUPPLY <br />TYP.3/4" GAS SUPPLYTYP.UR-1 <br />WC-1 <br />P1.1 <br />NEW PLUMBING <br />PLAN <br />2 SCALE 1/4"=1'-0" SEE DRAWING 5/P6.1 FOR PLUMBING FIXTURE SCHEDULEPARTIAL PLUMBING PLAN - SEWER <br />(N) SEWER LINE BELOW FLOOR. PROVIDE FLOOR <br />CLEANOUTS AS REQUIRED IN BATHROOM WALLS <br />AT FIXTURES AND AS REQUIRED TYP. <br />(N) HOT WATER SUPPLY FROM GAS WATER HEATER <br />TYP. <br />(N) COLD WATER SUPPLY, TIE TO (E) SUPPLY TYP.SEE <br />CIVIL. <br />(N) FLOOR DRAIN WITH TRAP PRIMER TYP.. <br />(N) 4" SEWER TO TIE INTO (N) 6" SEWER. SEE CIVIL. <br />(N) VENT THRU ROOF. CONNECT TO (E) WHERE <br />POSSIBLE TO MINIMIZE ROOF PENETRATIONS. <br />(N) 1.28 GPM TOILET. <br />(N) FAUCET WITH LEVER HANDLES AT ALL ROOMS & <br />HAND WASH SINKS. <br />(N) WALL CLEANOUT THEN DROP THROUGH FLOOR <br />TYP.. <br />(N) WATER SUPPLY. RUN ABOVE CEILING THEN DROP <br />DOWN TO CLEAR FLOOR. <br />(N) GAS SUPPLY. RUN ABOVE CEILING THEN DROP <br />DOWN AS NECESSARY.CORDES VILLAGE PLAZARAJA SALEEM & SANDYA SALEEM, OWNERSTHuB TEA & CAKESREVISIONS DATE <br />DATEAPPROVAL <br />JOB: <br />DATE: <br />SHEET TITLE: <br />SHEET NO. <br />4/9/2020 <br />ADESNECILRCHITECTCW.NHOJ OWE <br />E <br />, <br />J <br />R. <br />NO. C-9199 <br />F <br />-1.N <br />ER <br />3 1 -2 1O <br />ETATS <br />C A L IF O RNIAJohnWCowee,Jr.MOUNTAIN HOUSE, CAwww.architectural-concepts.net <br />johncowee06@gmail.com <br />ARCHITECTURAL <br />INTERIORS PLANNING <br />509 RAMONA AVE. <br />ALBANY, CA 94706-1431 <br />T/F 510-525-9630 <br />CONCEPTS <br />ARCHITECTURE <br />REVISION 0 <br />STAMP:1140 SOUTH TRADITION STREETSK-MH-C1TENAANT IMPROVEMENTNOTE: <br />SEWER LINE - 4" I.D. MIN. <br />SINK DRAIN - 2" I.D. MIN. <br />FLOOR DRAIN -1/12" I.D. MIN. <br />A.LAYOUT IS DIAGRAMMATIC. FINAL DESIGN BY <br />CONTRACTOR <br />NOTE: <br />(E)WATER SUPPLY LINE - 1" I.D. <br />(N)COLD WATER LINE SUPPLY - 3/4" I.D. MIN. <br />(N)COLD WATER BRANCH LINE - 1/2" I.D. MIN. <br />(N)HOT WATER SUPPLY LINE - 3/4" I.D. MIN. <br />(N)HOT WATER BRANCH LINE - 1/2" I.D. MIN. <br />A.INSULATE HOT WATER LINES <br />THROUGHOUT. <br />B.LAYOUT IS DIAGRAMMATIC. FINAL DESIGN <br />BY CONTRACTOR. <br />C.EXISTING PLUMBING LINES MAY BE REUSED <br />IF CLEANED OUT AND IN GOOD WORKING <br />ORDER. VERIFY SLPOPE, CONDITION, AND <br />DIRECTION PRIOR TO REUSE. <br /> & FIELD CONDITIONS <br />PLUMBING NOTES:. <br />1 SCALE 1/4"=1'-0" SEE DRAWING 5/P6.1 FOR PLUMBING FIXTURE SCHEDULEPARTIAL PLUMBING PLAN - WATER