My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO8UZCGNC (3)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
0
>
2500 – Emergency Response Program
>
CO8UZCGNC (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:55:55 PM
Creation date
3/23/2022 1:14:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2500 – Emergency Response Program
RECORD_ID
CO8UZCGNC
PE
2546
FACILITY_NAME
COUNTY ROAD
STREET_NUMBER
0
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
NEAR 22809013
ENTERED_DATE
9/7/2021 12:00:00 AM
SITE_LOCATION
S 99 FRONTAGE RD & OLIVE AVE
RECEIVED_DATE
9/7/2021 12:00:00 AM
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yang-Lee, Vicky [EHD] <br />From: San Joaquin County <sanjoaquinco@user.govoutreach.com > <br />Sent: Monday, October 4, 2021 12:12 PM <br />To: yang-Lee, Vicky [EHD] <br />Subject: New Request #43313 [3932393935346635] <br />CAUTION: This email is originated from outside of the organization. Do not click links or open attachments unless you <br />recognize the sender and know the content is safe. <br />—If replying by email, enter your reply above this line--- <br />Dear Vicki, <br />San Joaquin County appreciates the opportunity to serve you. <br />The Problem you submitted was: <br />Request type: Miscellaneous Roadway Issue <br />Location: 21212 S HWY 99 FRONTAGE RD E, RIPON, CA, 95366 <br />Description: Diesel fuel / oil spill at location per EHD. Contractor excavating soil and found discolored soil under the <br />section of paved road. Please have someone assess situation and report so that soil on shoulder can be replaced by <br />contractor (BC). <br />You will receive a response within 30 days for this request. <br />You may add additional information to this request by: <br />Replying to this email, <br />Signing into the system, or <br />Going to: <br /><https://gcc02.safelin ks. protection.° utlook.com/?url=http%3A%2 F%2 Fuser.govoutreach.com %2Fsa njoaquinco%2Fcase. <br />php%3 Fid%3D5920594%26access%3D3932393935346635&a m p;data=04%7C01%7Cvva ng- <br />lee%40sjgov.org%7C73e12457435342720bb808d9876ac9e9%7C3cff5075176a400d860a54960a7c7e51%7C0%7C0%7C6 <br />37689715003951112%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJOIjoiV2IuMzliLCJBTi161k1haWwiLCJX <br />VCI6M nO%3D%7C1000&sdata=Ne15%2Bfj4s4qhknnTrDbj2E7xe%2FR1wZsVfVrt%2FuPigEXc%3D&reserved=0> <br />Thank you, <br />Chris Balaji, Director of Public Works <br />1
The URL can be used to link to this page
Your browser does not support the video tag.