Laserfiche WebLink
Complaint Investigation Summary Report #: 5105 <br />COMPLAINT ID: COBEUM9DI Site Location: 6540 S AUSTIN RD <br />Received by: EE0009818 BAKER <br /> <br />Received Date: 8/21/2021 Complaint Received Via: PHONE <br />Assigned To: EE0009818 BAKER <br /> <br />Assigned Date: 8/21/2021 <br />Program/Element Code 2546 - Release/Spill Response (excluding Joint Team) <br />Nature of complaint: <br />40 GALLONS OF DIESEL RELEASED FROM REFRIGERATION UNIT JBRU568797 <br />PROPERTY INFORMATION <br />Property Name: <br />Site Location 6540 S AUSTIN RD <br /> <br />District <br />001 - VILLAPUDUA, MIGUEL <br />STOCKTON, CA 95215 Location Code 99- UNINCORPORATED AREA <br />Cross Street ARCH APN <br />18109023 <br />Complaint Status: ) <br />Date Abated: Abated By: 0A0LikAZ <br /> <br />Activity Summary Summary <br />Activity Date Recorded by <br />08/21/2021 4:54pm-Received spill report 21-4515. 40 gallons of diesel released from BAKER <br />punctured fuel tank on car JBRU568797. Called Steve Yost (BNSF) at <br />817-593-6823 and confirmed details in spill report. Called John Brainard (BNSF) <br />at 209-507-6289 and left a message regarding spill. Received call back from John <br />Brainard. He said the spill was 20 gallons of diesel. Patriot Environmental will be <br />on site at 6pm to complete the clean-up. No storm drains or waterways were <br />impacted. Spill stayed on the property and BNSF is the responsible party. Let <br />John Brainard know that I would follow up tomorrow to see how the clean-up went <br />and how much waste was generated. <br />4:54pm-5:24pm. <br />Changed from 977 to 907 (non-billable to billable) LB <br />08/22/2021 3:30pm-Followed up with John Brainard (209-507-6289) on clean-up. He said that BAKER <br />clean-up was not completed and will be finished on 8/23/21 by Patriot <br />Environmental. Let John Brainard know that I would have to come out to verify <br />since the clean-up was not completed the day it happened. <br />Generated complaint. Wrote Notice to Abate and emailed it to Edward Phillips <br />(CERS Environmental Contact) at Edward.Phillips@BNSF.com. <br />Completed prop 65 and Emergency Response Record. <br />3:30pm-4 pm. <br />08/23/2021 Turned in Prop 65 to Elena Manzo (Lead Sr. REHS) for review. <br />08/26/2021 Went to site to verify clean-up is complete with Kristina Saetern (EHS). Met with <br />Chris Feathers of Patriot Environmental and John Brainard (BNSF). Clean-up is <br />complete. Soil was excavated along the hillside of the ditch covering an <br />approximate area of 15x15 feet and up to 3 feet deep. 20 yards of soil was <br />generated from the clean-up. Waste was taken to Patriot Yard at McClellan Park, <br />CA pending analytical and disposal. <br />BAKER <br />BAKER <br />5105.rpt Page 1 of 3