My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2022 11:51:23 AM
Creation date
3/23/2022 2:57:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />All tests marked “Fail” and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />Additional copies of this page may be attached. <br />Test Method Developed by ☒ Manufacturer ☒ Industry Standard ☐ Professional Engineer <br />Test Type ☐Pressure ☐Vacuum ☒Hydrostatic <br />Test Equipment Used: F.F.S. Incon TS-STS Sump Tester w/ + or – 0.002” graduations <br />Sump/UDC ID UDC 5-6 Diesel STP 91 STP UDC 7-8 <br />Sump Manufacturer Bravo Total Containment Total Containment Bravo <br />Sump Depth (inches) 12” 72” 72” 12” <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Piping comes <br />from bottom of <br />UDC <br />28” 28” Piping comes <br />from bottom of <br />UDC <br />Test Start Time 9:45am 9:45am 9:45am <br />Initial Reading 1.7276” 3.8459” 5.0850” <br />Test End Time 10:00am 10:00am 10:00am <br />Final Reading 1.7274” 3.8459” 5.0843” <br />Change in Reading -0.0002”0.00” -0.0007”Visual Fail <br />Pass/Fail Criteria + or – 0.002”+ or – 0.002”+ or – 0.002”+ or – 0.002” <br />Tightness Test Results ☒Pass ☐ Fail ☒Pass ☐ Fail ☒Pass ☐ Fail ☐Pass ☒ Fail <br />Sump/UDC ID UDC 1-2 UDC 3-4 87 STP W.O. <br />Sump Manufacturer Bravo Bravo Total Containment Total Containment <br />Sump Depth (inches) 12” 12” 72” 74” <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Piping comes <br />from bottom of <br />UDC <br />Piping comes <br />from bottom of <br />UDC <br />28” 22” <br />Test Start Time 10:18am 10:18am 12:45pm <br />Initial Reading 2.1747” 4.0490” 4.0792” <br />Test End Time 10:33am 10:33am 1:00pm <br />Final Reading 2.1749” 4.0479” 4.0795” <br />Change in Reading +0.0002”-0.0011”Not tested +0.0003” <br />Pass/Fail Criteria + or – 0.002”+ or – 0.002”+ or – 0.002”+ or – 0.002” <br />Tightness Test Results ☒Pass ☐ Fail ☒Pass ☐ Fail ☐Pass ☒ Fail ☒Pass ☐ Fail <br />Additional copies of this page may be attached. <br />8. SUMP/UDC TEST
The URL can be used to link to this page
Your browser does not support the video tag.