Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply) : Clio <br /> j- 1 . VERBAL WARNINGS ; E] 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; (�-3 . TELEPHONE; <br /> ❑ 4. PAGERS ; VaJ . ALARM SYSTEM; RL6 . PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply) : C12. <br /> 4-1 . VERBAL WARNINGS ; ❑ 2 . PUBLIC ADDRESS OR INTERCOM SYSTEM; 0 3 . TELEPHONE; <br /> ❑ 4. PAGERS ; ❑ 5 . ALARM SYSTEM; ❑ 6 . PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: C13 . <br /> PRIMARY EMERGENCY COORDINATOR NAME : OCA y (ps , C,.gff WeFHONE NO . : ?,(97 � ;? .- j�jA0jPHONE NO . : 4Sa ; L. <br /> ALTERNATE EMERGENCY COORDINATOR NAME: rJ,,--{{ t cam¢ 4 PHONE NO . : C - 9 i 5 � 27 Z ONE NO . : - <br /> T Lhv S� � � '`� <br /> ❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO . : <br /> m <br /> Note : If more than one altemate emergency coordinator is designated, attach a list in order of responsibility. <br /> D . EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility' s procedures for containing spills and preventing and initigating releases , fires and/or explosions . <br /> Dl , <br /> 5a 1 . MONITOR FOR LEAKS , RUPTURES, PRESSURE BUILD UP , ETC. ; <br /> ❑ 2 . PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g. , Portable spill containment walls, built-ui berms) ; <br /> [:1 3 . PROVIDE ABSORBENT PHYSICAL BARRIERS (e . g. , Pads , spill pigs, spill pillows) ; <br /> 94* COVER OR BLOCIf FLOOR AND/OR STORM DRAINS ; <br /> E] 5 . LINED TRENCH DRAINS AND/OR SUMPS ; <br /> E:166 AUTOMATIC FIRE SUPPRESSION SYSTEM, <br /> ❑ 7 . ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS ; <br /> ❑ 8 . STOP PROCESSES AND/OR OPERATIONS , <br /> ❑ 9 . AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> X10. SHUT OFF WATER, GAS , ELECTRICAL UTILITIES ; <br /> 11 . CALL 9- I - 1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> ® 12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS ; <br /> 9L13 . ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> [ ] 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM, <br /> ( 15 . REMOVE CONTAINERS AND/OR ISOLATE AREAS , <br /> ❑ 16 . HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> ❑ 17 . USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT, <br /> ❑ 18 . VACUUM SUCTION USING APPROPRIATE VACUUM (e. g. , Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP, <br /> [0949. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE, <br /> ❑ 20 . PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS ; <br /> D2. <br /> ❑ 21 . OTHER (Specify) : <br /> E . FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply) : EL <br /> F11 . BELLS , E2. <br /> 12 . HORNS/SIRENS; <br /> 3 . VERBAL (i. e. , Shouting); <br /> ❑ 4. OTHER (S ecify) : <br /> THE FOLLOWING LOCATIONS) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S ) (e. g. , Parking lot, street comer) : E3 . <br /> Note : The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS : E4. <br /> 1 . WRIT'T'EN PROCEDURES DESCRIBING ROUTES , EXITS , AND ASSEMBLY AREAS ; <br /> EVACUATION MAP(S) DEPICTING ROUTES , EXITS , AND ASSEMBLY AREAS ; <br /> 3 . OTHER (Specify) : E5. <br /> Note : Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan . <br /> F . ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following) : F1 . <br /> al . HAVE BEEN DETERMINED NOT NECESSARY; <br /> F2. <br /> El 2* THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify) :Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br /> contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev. 03 /07/17 Page 2 of 4 <br />